Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Technical questions
  • Q2. Ask me any type of technical questions related to civil engineering branch
  • Q3. Ask me any subject of technical subject
  • Q4. Subject - Building material
  • Q5. Sub - engineering drawing
Round 3 - Aptitude Test 

Ask me any subject of technical subject

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Engineer interview:
  • Aggregate
  • Engineering Drawing
Interview preparation tips for other job seekers - I'm shakuntala yadav from ballia up
Now I'm joined in Yokohama company off highway tyre company.

Top L&T Construction Civil Engineer Interview Questions and Answers

Q1. What is the nominal concrete proportion for different grades?
View answer (3)

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Finishing work related discussion

Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Only basic knowledge question

Round 3 - Technical 

(5 Questions)

  • Q1. Technical interview for regarding your resume
  • Q2. What is conductor
  • Ans. 

    A conductor is a material or device that allows the flow of electrical current.

    • Conductors have low resistance to the flow of electricity.

    • Metals like copper and aluminum are commonly used as conductors.

    • Conductors are essential components in electrical circuits.

    • Good conductors have high electrical conductivity.

  • Answered by AI
  • Q3. Whare are you from
  • Q4. What about internship
  • Q5. Why are you join this company

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't speek Spanish language only speek fok fok language

Machine Operator Interview Questions asked at other Companies

Q1. What is mean by quality test 100 percentage give you sir
View answer (4)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Dear HR, I am writing to apply for the position of Supervisor Rafat Ali with . I am a highly skilled and experienced data entry worker and mail writer, and I believe I would be a valuable asset to your co...
  • Q2. XXXXX ***** Passport no T3900365 7 years gulf experience Saudi Arabia Thabat Construction co sub contact Saudi Aramco Dammam Fadhli Project Oil & gas co L&T consideration co Thanks
  • Q3. Sir I am interested Rafat Ali Post serior auto Electrician 7 years gulf experience Saudi Arabia armco Project Plz check my cv Thanks
  • Q4. Equipment Workshop team work in Workshop heavy vehicles Equipment turck,bus wheel loader forklift, Skid-steer loader and Generator also auto Equipment Repring Workshop Supervisor Heavy Vehicle tea...
  • Q5. L&T company Thanks

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks advise for job seekers

Work Supervisor Interview Questions asked at other Companies

Q1. Starter motor problem
View answer (1)

L&T Construction interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (49)

 Civil Site Engineer

 (33)

 Senior Engineer

 (28)

 Civil Engineer

 (25)

 Site Engineer

 (18)

 Assistant Manager

 (14)

 Electrical GET

 (11)

 Engineer Trainee

 (11)

Technician Interview Questions & Answers

user image Anonymous

posted on 9 Jan 2025

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Name kya hai apka?
  • Q2. Degree kya hai

Technician Interview Questions asked at other Companies

Q1. What kinds of pipe used for hot and cold water supply ?
View answer (8)

Get interview-ready with Top L&T Construction Interview Questions

Senior Civil Engineer Interview Questions & Answers

user image Syed shujaat husain

posted on 6 Jul 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I was interviewed in Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Formwork and steel productivity
  • Q2. Steel is 150 kg and Formwork is 175kg/sqmt. Per person per day.

Interview Preparation Tips

Interview preparation tips for other job seekers - Study what is going on site

Top L&T Construction Senior Civil Engineer Interview Questions and Answers

Q1. Why reinforcement is provided alternative in column?
View answer (5)

Senior Civil Engineer Interview Questions asked at other Companies

Q1. Why reinforcement is provided alternative in column?
View answer (5)

Electrician Interview Questions & Answers

user image Anonymous

posted on 5 Jan 2025

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Right hand rool .
  • Q2. Left hand rool

Electrician Interview Questions asked at other Companies

Q1. 1. How much current takes a 5hp motor ?, 2. Draw a STAR DELTA and DOL starter control wireing. 3. How to connect star connection, and DELTA connectin. 4. What is the kw of 30hp motor ?, 5. Can you connect a temperature controller ?, 6. What... read more
View answer (5)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. OFC PROJECT ditels
  • Q2. Renewable energy projects

Field Engineer Interview Questions asked at other Companies

Q1. What is insulator and conductors and semiconductors
View answer (6)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Very good contact company
Round 3 - Technical 

(4 Questions)

  • Q1. Technical total question
  • Q2. Use Minimum steel bar of column
  • Ans. 

    Minimum steel bar of column should be used as per structural design requirements.

    • Minimum steel bar should be used as per the structural design calculations to ensure the safety and stability of the column.

    • The size and spacing of the steel bars in the column should be as per the design specifications provided by the structural engineer.

    • Using less steel than required can compromise the strength and load-bearing capacity ...

  • Answered by AI
  • Q3. Concrete high strength day
  • Q4. Square column minimum of steel bar
  • Ans. 

    Square column minimum steel bar requirement is based on the size of the column and the load it will bear.

    • Minimum steel bar requirement for square columns is typically 0.8% of the cross-sectional area.

    • The size of the column and the load it will bear will determine the exact amount of steel required.

    • For example, a 12x12 inch square column with a load capacity of 100 tons may require a minimum of 4 steel bars.

  • Answered by AI
Round 4 - Case Study 

My final interview Very good

Interview Preparation Tips

Interview preparation tips for other job seekers - Morden for interview

Civil Supervisor Interview Questions asked at other Companies

Q1. 1=Derivation of D²/162. 2=nominal mix 3=design mix 4=per tonne binding wire 5=water cement ratio 6=recent experience or responsibility.
View answer (1)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What is BBS and how is it used?
Round 2 - Aptitude Test 

Top L&T Construction Civil Site Engineer Interview Questions and Answers

Q1. Minimum used in which grade of concrete
View answer (11)

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

L&T Construction Interview FAQs

How many rounds are there in L&T Construction interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction interview?

Some of the top questions asked at the L&T Construction interview -

  1. What will be the cost of painting the wall behind ...read more
  2. What do you mean by M25 concre...read more
  3. What are the steps to be followed after receiving the plan of a constructi...read more
How long is the L&T Construction interview process?

The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Construction Interview Process

based on 848 interviews

Interview experience

4.2
  
Good
View more

L&T Construction Reviews and Ratings

based on 6k reviews

4.0/5

Rating in categories

4.0

Skill development

3.4

Work-life balance

3.8

Salary

4.0

Job security

3.7

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 6k Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview