L&T Construction Assistant Manager Interview Questions, Process, and Tips for Experienced

Updated 28 Mar 2025

Top L&T Construction Assistant Manager Interview Questions and Answers for Experienced

View all 10 questions

L&T Construction Assistant Manager Interview Experiences for Experienced

9 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Related TBM Tunnelling
  • Q2. How to work in metro city with EPB machine
  • Ans. 

    To work in a metro city with an EPB machine, one must be familiar with its operation and maintenance.

    • Understand the operation of the EPB machine and follow safety protocols

    • Regularly maintain and inspect the EPB machine to ensure proper functioning

    • Coordinate with other team members and stakeholders for efficient project execution

    • Stay updated on the latest technology and advancements in EPB machines

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Discussion about qualification
  • Q2. About salary and qualification

Assistant Manager Interview Questions & Answers

user image Rohit Meragu

posted on 28 Mar 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Explain about construction activities
  • Ans. 

    Construction activities encompass planning, designing, and building structures, ensuring safety and compliance with regulations.

    • Site Preparation: Clearing and leveling land before construction begins.

    • Foundation Work: Pouring concrete and laying the groundwork for stability.

    • Framing: Constructing the skeleton of the building using wood or steel.

    • Roofing: Installing the roof structure to protect the building from elements.

    • ...

  • Answered by AI
  • Q2. Explain procedure of Mivan Shuttering
  • Ans. 

    Mivan shuttering is an aluminum formwork system used for rapid construction of concrete structures.

    • 1. Preparation: Site is cleared and foundation is laid before shuttering installation.

    • 2. Assembly: Aluminum panels are assembled on-site to create the desired shape of walls and slabs.

    • 3. Alignment: Panels are aligned and secured to ensure accuracy in dimensions.

    • 4. Concrete Pouring: Concrete is poured into the formwork, fi...

  • Answered by AI

Assistant Manager Interview Questions Asked at Other Companies for Experienced

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Axis Bank
Q3. How many joint holders we can process in an account in once ?
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Stairs case ralling Section and fixing process
  • Q2. Productivity of plaster work and tiles
  • Ans. 

    The productivity of plaster work and tiles is an important factor in construction projects.

    • Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.

    • Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.

    • For example, experienced plasterers may be able to apply plaster m...

  • Answered by AI
  • Q3. Centiler beam steel design
  • Ans. 

    Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.

    • Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.

    • The section modulus is then used to select the appropriate beam size from standard steel beam tables.

    • Factors such as the type of load, material properties, and safety factors a...

  • Answered by AI
  • Q4. In footing 25 mm dia bend deduction yes ya No
  • Q5. Responsibility and team' work
  • Q6. Your work at site?
  • Q7. Work permit at site
  • Q8. Density of steel with unit
  • Ans. 

    The density of steel is a measure of its mass per unit volume.

    • Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel.

    • For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.

    • The density of steel is an impo...

  • Answered by AI
  • Q9. AAC block price and size details
  • Ans. 

    AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.

    • AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.

    • The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.

    • The prices of AAC blocks depend on factors such as the brand, quality, and qu...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Assistant Manager interview:
  • Nice
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. 1. Tell me about your previous job experience 2. Challenges in construction 3. Why safety and quality standards needed at site 4. Work procedure of Pile

Interview Preparation Tips

Topics to prepare for L&T Construction Assistant Manager interview:
  • Core subject
  • Safety Management
  • Management
Interview preparation tips for other job seekers - L&T focused on quality & safety with progress of the project.

L&T Construction interview questions for designations

 Assistant Manager Operations

 (1)

 Assistant Store Manager

 (1)

 Assistant Manager/Manager -(Technical)

 (1)

 Assistant Construction Manager

 (10)

 Assistant Manager - EHS

 (3)

 Assistant Engineering Manager

 (3)

 Assistant Manager Civil

 (3)

 Assistant Manager Planning

 (1)

I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Aluminium formwork slab cycle, components, sqm work for per carpenters
  • Q2. How much sqm plastering done by Mason per day, concrete blocks sizes, workability, painting, gypsum work
  • Q3. Conventional shuttering, BBS, steel weight per metre, field test for steel
  • Q4. Field concrete tests, cement, grade of concrete
Round 3 - HR 

(1 Question)

  • Q1. Reason for job change, why should we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil basics and site execution work to be have good knowledge

Get interview-ready with Top L&T Construction Interview Questions

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Aug 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Group Discussion 

All technical questions and taken interview 45 minutes i am fail to answer 3 from 50 but my performance good. 10 giants take interview.after all interview complited one list on notice board select 3 from 200 candidaye at L&T office andheri bombay.

Round 3 - HR 

(5 Questions)

  • Q1. You think what your position in company. Fix my position officer cader.suggest by hr and i agree. As per position seen my sellary structure and i say yes he will tell to me please submit your interview cos...
  • Q2. Yes officer cader
  • Q3. There is officer and manager both cader
  • Q4. What you want responsibility
  • Q5. You are take now officer

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to job in L&T prepare site problem and there fore you required some site experience and deep intrest in construction field number one company select number one employee only
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Your previous experience
  • Q2. Describe about yourself
  • Q3. Asked about my management skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be confident on, what you have done in your previous job.

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Salary negotiation
  • Q2. Job specific questions
  • Q3. Job specific questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give to the point answers. Most of the questions will be from your expertise only.

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Preparation basic of pipeline and job procedures.

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Assistant Manager interview for experienced candidates?
L&T Construction interview process for experienced candidates usually has 1-2 rounds. The most common rounds in the L&T Construction interview process for experienced candidates are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction Assistant Manager interview for experienced candidates?

Some of the top questions asked at the L&T Construction Assistant Manager interview for experienced candidates -

  1. How much sqm plastering done by Mason per day, concrete blocks sizes, workabili...read more
  2. How to work in metro city with EPB mach...read more
  3. Productivity of plaster work and ti...read more

Tell us how to improve this page.

L&T Construction Assistant Manager Interview Process for Experienced

based on 6 interviews

2 Interview rounds

  • Resume Shortlist Round
  • Technical Round
View more
L&T Construction Assistant Manager Salary
based on 1k salaries
₹6 L/yr - ₹18.2 L/yr
34% more than the average Assistant Manager Salary in India
View more details

L&T Construction Assistant Manager Reviews and Ratings

based on 307 reviews

3.8/5

Rating in categories

3.8

Skill development

2.8

Work-life balance

3.7

Salary

4.2

Job security

3.2

Company culture

3.2

Promotions

3.3

Work satisfaction

Explore 307 Reviews and Ratings
Assistant Manager
1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
706 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
491 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Civil Site Engineer
469 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
327 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.4
Compare

Power Mech Projects

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview