Filter interviews by
To work in a metro city with an EPB machine, one must be familiar with its operation and maintenance.
Understand the operation of the EPB machine and follow safety protocols
Regularly maintain and inspect the EPB machine to ensure proper functioning
Coordinate with other team members and stakeholders for efficient project execution
Stay updated on the latest technology and advancements in EPB machines
I appeared for an interview before Mar 2024, where I was asked the following questions.
Construction activities encompass planning, designing, and building structures, ensuring safety and compliance with regulations.
Site Preparation: Clearing and leveling land before construction begins.
Foundation Work: Pouring concrete and laying the groundwork for stability.
Framing: Constructing the skeleton of the building using wood or steel.
Roofing: Installing the roof structure to protect the building from elements.
...
Mivan shuttering is an aluminum formwork system used for rapid construction of concrete structures.
1. Preparation: Site is cleared and foundation is laid before shuttering installation.
2. Assembly: Aluminum panels are assembled on-site to create the desired shape of walls and slabs.
3. Alignment: Panels are aligned and secured to ensure accuracy in dimensions.
4. Concrete Pouring: Concrete is poured into the formwork, fi...
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The productivity of plaster work and tiles is an important factor in construction projects.
Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.
Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.
For example, experienced plasterers may be able to apply plaster m...
Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.
Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.
The section modulus is then used to select the appropriate beam size from standard steel beam tables.
Factors such as the type of load, material properties, and safety factors a...
The density of steel is a measure of its mass per unit volume.
Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel.
For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.
The density of steel is an impo...
AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.
AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.
The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.
The prices of AAC blocks depend on factors such as the brand, quality, and qu...
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
L&T Construction interview questions for designations
I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 3 interview rounds.
Get interview-ready with Top L&T Construction Interview Questions
I appeared for an interview before Aug 2022.
All technical questions and taken interview 45 minutes i am fail to answer 3 from 50 but my performance good. 10 giants take interview.after all interview complited one list on notice board select 3 from 200 candidaye at L&T office andheri bombay.
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
Top trending discussions
posted on 14 Feb 2021
Some of the top questions asked at the L&T Construction Assistant Manager interview for experienced candidates -
based on 6 interviews
2 Interview rounds
based on 307 reviews
Rating in categories
Assistant Manager
1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
706
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
491
salaries
| ₹5.4 L/yr - ₹17 L/yr |
Civil Site Engineer
469
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
327
salaries
| ₹6 L/yr - ₹17 L/yr |
Larsen & Toubro Limited
Dilip Buildcon
Simplex Infrastructures
Power Mech Projects