Filter interviews by
The lead of OB dump is responsible for overseeing the operations and management of the OB dump area.
Ensure proper disposal of waste materials in the OB dump area
Supervise and coordinate the activities of the OB dump team
Maintain cleanliness and safety standards in the OB dump area
Monitor inventory of waste materials and report any discrepancies
Implement and enforce proper waste disposal procedures
Train and educate team
The production output of one 480 machine per day depends on various factors such as machine efficiency, operator skill, raw material quality, etc.
The production output of a machine is typically measured in units such as pieces, kilograms, liters, etc.
Factors like machine downtime, maintenance, and operator breaks can affect daily production.
For example, if a 480 machine produces 100 units per hour and operates for 8 ho...
Powder factor is the amount of explosive required to break a certain amount of rock in blasting operations.
Powder factor is calculated by dividing the total amount of explosives used by the volume of rock blasted.
It is typically measured in units of kilograms or pounds of explosives per cubic meter or cubic yard of rock.
A higher powder factor indicates more explosives are needed to break the same amount of rock, while ...
Detonator factor is a term used in explosives industry to describe the sensitivity of a detonator to initiate an explosion.
Detonator factor refers to the amount of energy required to set off a detonator.
It is important to consider the detonator factor when handling explosives to ensure safety.
Different types of detonators have different detonator factors.
For example, a high explosive detonator may have a lower detonato
The bucket capacity of our machine is 1.5 cubic meters.
The bucket capacity of the machine is 1.5 cubic meters.
It is important to know the bucket capacity for efficient operation.
The bucket capacity determines how much material the machine can handle at once.
I applied via Approached by Company and was interviewed in Jan 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.
I work in the field of software engineering.
Developing and maintaining software applications
Designing and implementing software solutions
Collaborating with cross-functional teams
Troubleshooting and debugging software issues
Ensuring code quality and adherence to best practices
I applied via Job Portal
Triggers are actions that are automatically performed when a certain event occurs in a database. Async operations are tasks that run independently of the main program flow.
Triggers in databases are used to maintain data integrity and automate tasks based on specified conditions.
Async operations in programming allow tasks to be executed concurrently without blocking the main program flow.
Examples of async operations inc...
Create a trigger on an object related to Account and Contact
Use the 'trigger' keyword to start the trigger
Specify the object you want to create the trigger on (e.g. Account)
Include logic to handle the related Contact object (e.g. querying related contacts)
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
I appeared for an interview in Jun 2019.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Effective project handling involves planning, communication, and adaptability to ensure successful outcomes.
Define clear project goals and objectives to align the team.
Utilize project management tools like Jira or Trello for tracking progress.
Conduct regular team meetings to discuss updates and challenges.
Implement Agile methodologies to adapt to changes quickly.
Document all processes and decisions for future reference
The steps in the sales process include prospecting, qualifying, presenting, handling objections, closing, and follow-up.
Prospecting: Identifying potential customers or leads.
Qualifying: Determining if the prospect is a good fit for the product or service.
Presenting: Demonstrating the features and benefits of the product or service.
Handling objections: Addressing any concerns or doubts the prospect may have.
Closing: Ask...
By highlighting the benefits, addressing concerns, providing evidence of quality, and offering incentives.
Highlight the unique benefits of the product
Address any concerns or objections the customer may have
Provide evidence of the quality and effectiveness of the product
Offer incentives such as discounts or promotions to encourage purchase
I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 16 reviews
Rating in categories
QA QC Engineer
5
salaries
| ₹2.7 L/yr - ₹3 L/yr |
Civil Site Engineer
5
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Site Engineer
4
salaries
| ₹1.9 L/yr - ₹4.2 L/yr |
Billing Engineer
4
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Highway Engineer
4
salaries
| ₹2 L/yr - ₹3 L/yr |
Signature Global
Sunteck Realty
Pittie Group
Pin Click