Filter interviews by
I applied via Approached by Company and was interviewed in Jan 2022. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.
I work in the field of software engineering.
Developing and maintaining software applications
Designing and implementing software solutions
Collaborating with cross-functional teams
Troubleshooting and debugging software issues
Ensuring code quality and adherence to best practices
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Effective project handling involves planning, communication, and adaptability to ensure successful outcomes.
Define clear project goals and objectives to align the team.
Utilize project management tools like Jira or Trello for tracking progress.
Conduct regular team meetings to discuss updates and challenges.
Implement Agile methodologies to adapt to changes quickly.
Document all processes and decisions for future reference
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.
Deduction in shuttering criteria is done to reduce the cost of construction.
It is also done to reduce the time taken for construction.
The deduction is usually done based on the strength of the concrete being used.
For example, if the concrete strength is high, less shuttering material is required.
The deduct...
I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.
Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.
Measure the length and width of the area to be covered with stone/tile flooring/cladding
Multiply the length by the width to get the total square meters or square feet
Account for any cuts or wastage in the calculation
Consider the pattern or design of the flooring/cladding when measuring
posted on 24 Dec 2024
The proportion of materials used in M25 grade concrete is 1:1:2 (cement:sand:aggregate).
M25 grade concrete consists of 1 part cement, 1 part sand, and 2 parts aggregate.
For example, if you have 1 kg of cement, you would need 1 kg of sand and 2 kg of aggregate to make M25 grade concrete.
I have 2 years of experience working as a Junior Engineer at XYZ Company.
Worked on various engineering projects under the guidance of senior engineers
Assisted in designing and testing new products
Collaborated with cross-functional teams to troubleshoot and resolve technical issues
QA QC Engineer
5
salaries
| ₹2.7 L/yr - ₹3 L/yr |
Civil Site Engineer
5
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Site Engineer
4
salaries
| ₹1.9 L/yr - ₹4.2 L/yr |
Billing Engineer
4
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Highway Engineer
4
salaries
| ₹2 L/yr - ₹3 L/yr |
Signature Global
Sunteck Realty
Pittie Group
Pin Click