Upload Button Icon Add office photos

Filter interviews by

Krishna Infrastructure Civil Engineer Interview Questions and Answers

Updated 28 Jul 2022

Krishna Infrastructure Civil Engineer Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed in Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about About your self
  • Q2. Tell me about your site works witch is doing by you.
  • Q3. Is codes & quality related
Round 3 - HR 

(1 Question)

  • Q1. Telle about your current CTC

Interview Preparation Tips

Topics to prepare for Krishna Infrastructure Civil Engineer interview:
  • Quality Control
Interview preparation tips for other job seekers - If you got a lucky chance than you will get a telephonic interview and it's the best opportunity for you,you can prepare for your interview and write down all details in a note book after that give your interview.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Field of your work
  • Ans. 

    I work in the field of software engineering.

    • Developing and maintaining software applications

    • Designing and implementing software solutions

    • Collaborating with cross-functional teams

    • Troubleshooting and debugging software issues

    • Ensuring code quality and adherence to best practices

  • Answered by AI
  • Q2. What about your work
  • Q3. Complete plumbing and firefighting work including STP,WTP,S.POOL, and external sewerage system and storm water and firefighting work and water supply too
  • Q4. Tell about pipes you used at project
  • Q5. GI in water supply and ci ln soil and waste, glazed stoneware in external sewerage system and RCC in storm water,MS in firefighting

Interview Preparation Tips

Interview preparation tips for other job seekers - Well and good

I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is your daily work and responsibilities in current project?
  • Q2. What is your current project all about?

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for technical questions I.e. mep related question and software like autocad ms excel etc

I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About your self
  • Q2. My experience as an engineer
  • Q3. How to execute work on site
  • Ans. 

    Execution of work on site involves planning, coordination, and management of resources to ensure timely completion of the project.

    • Develop a detailed project plan and schedule

    • Allocate resources effectively and efficiently

    • Ensure safety measures are in place

    • Regularly monitor and report progress

    • Address any issues or challenges that arise

    • Maintain good communication with stakeholders

    • Ensure quality control and adherence to sp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE polite. And humble and be in confidence
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Discussion about College time studies
  • Q2. Hobbies and Managing

Interview Preparation Tips

Topics to prepare for Maxinfra QA QC Engineer interview:
  • Construction knowledge
  • Concrete technology
  • IS CODES

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are you doing this company is looking for an interview.

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is good working condition and new income certificate 👍
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. About civil engineering for site and billing Quantity surveying and rate analysis .actual site quantity measurements and check contractor bill and certification
  • Q2. Concrete quantity calculations
  • Q3. As per site and as per drawing calculated

Interview Preparation Tips

Interview preparation tips for other job seekers - No future and no skill and no development and no life balance
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. How is stone/Tile flooring /Cladding is measured
  • Ans. 

    Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.

    • Measure the length and width of the area to be covered with stone/tile flooring/cladding

    • Multiply the length by the width to get the total square meters or square feet

    • Account for any cuts or wastage in the calculation

    • Consider the pattern or design of the flooring/cladding when measuring

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join their Site billing profile.They suck at their system and there is nothing such Client approach towards the project.It's kind of In-house and chosen vendors for their projects are so bad that site billing will suffer and you will be blamed.

Krishna Infrastructure Interview FAQs

How many rounds are there in Krishna Infrastructure Civil Engineer interview?
Krishna Infrastructure interview process usually has 3 rounds. The most common rounds in the Krishna Infrastructure interview process are Resume Shortlist, Technical and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

Sunteck Realty Interview Questions
3.3
 • 23 Interviews
ASSA ABLOY Interview Questions
3.6
 • 17 Interviews
Pittie Group Interview Questions
2.7
 • 16 Interviews
Ambience Group Interview Questions
3.4
 • 16 Interviews
Alpha Corp Interview Questions
4.4
 • 13 Interviews
Pin Click Interview Questions
3.2
 • 12 Interviews
Maxinfra Interview Questions
4.2
 • 11 Interviews
View all
QA QC Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Billing Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Highway Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Krishna Infrastructure with

Lulu International Shopping Mall

3.9
Compare

Signature Global

4.0
Compare

Sunteck Realty

3.3
Compare

Pittie Group

2.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview