English, Quant, Analytical
I applied via Approached by Company and was interviewed before Mar 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.
I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.
The market rate of steel fluctuates based on supply and demand, global economic conditions, and trade policies.
Market rate of steel is influenced by factors such as supply and demand dynamics.
Global economic conditions, such as GDP growth and industrial output, impact steel prices.
Trade policies and tariffs can also affect the market rate of steel.
Steel prices can vary based on the type of steel (e.g. carbon steel, sta...
Yes, there are codes that need to be followed for BBS (Bar Bending Schedule) and steel cut lengths.
Codes such as IS 2502:1963 and IS 1786:2008 provide guidelines for BBS and steel cut lengths.
BBS includes details like bar mark, diameter, length, shape, and bending dimensions.
Steel cut lengths should be as per the required dimensions specified in the design drawings.
Following the codes ensures structural integrity and c
Rate for brickwork, formwork, and wardrobe dates are commonly used in construction projects to estimate costs.
Rate for brickwork is typically calculated per cubic meter (1cum)
Formwork is measured in square meters (sqm)
Wardrobe dates are measured in square feet (sft)
Rate analysis of Kota stone involves calculating the cost of materials, labor, and other expenses for a specific quantity of Kota stone work.
Calculate the cost of Kota stone per square foot or square meter.
Include the cost of transportation, labor, and other miscellaneous expenses.
Consider the wastage factor while calculating the total cost.
Compare the rates of different suppliers to get the best deal.
Use software or o
Rate analysis of granite involves calculating the cost of materials, labor, and equipment needed for a specific project.
Determine the quantity of granite required for the project
Calculate the cost of granite per unit
Estimate the cost of transportation, labor, and equipment
Factor in any additional costs such as taxes or overhead expenses
Compare quotes from different suppliers to get the best rate
To prepare the bbs, you need to marinate the meat, skewer it, and grill it to perfection.
Marinate the meat in a mixture of spices, yogurt, and lemon juice for at least 2 hours.
Skewer the marinated meat along with vegetables like bell peppers and onions.
Grill the skewers on a hot grill until the meat is cooked through and has a nice charred exterior.
Yes, I have knowledge of LISP commands in AutoCAD for QS works.
I have experience using LISP commands in AutoCAD for quantity surveying tasks.
I can create custom commands and automate repetitive tasks using LISP in AutoCAD.
For example, I have used LISP to generate reports, extract data, and streamline workflows in AutoCAD for QS projects.
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
I appeared for an interview before Jan 2021.
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.
Project is the overall task or objective to be completed within a specific timeframe.
Project engineering focuses on the technical aspects such as planning, designing, and executing the project.
Project management involves coordinating resources and tas...
Types of services in interior fitout include design, construction, project management, and installation.
Design services involve creating layouts, selecting materials, and creating 3D visualizations.
Construction services include building partitions, ceilings, and flooring.
Project management services involve coordinating schedules, budgets, and contractors.
Installation services include fitting furniture, fixtures, and eq...
Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.
Delays in material delivery can impact project timelines and budgets
Inclement weather can halt work progress and cause safety concerns
Coordination issues between different teams can lead to misunderstandings and errors
Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.
Agreement is a mutual understanding between two or more parties.
A bond is a legal document that guarantees the fulfillment of obligations.
Agreements are usually informal and may not always be legally binding.
Bonds are formal and legally enforceable documents.
Examples of agreements include contra...
Project Engineer
137
salaries
| ₹2.6 L/yr - ₹8.1 L/yr |
Assistant Project Manager
123
salaries
| ₹5.2 L/yr - ₹12.2 L/yr |
Project Manager
102
salaries
| ₹7 L/yr - ₹18.8 L/yr |
Assistant Facility Manager
94
salaries
| ₹2.9 L/yr - ₹7.2 L/yr |
Senior Project Engineer
85
salaries
| ₹4.1 L/yr - ₹9.5 L/yr |
CBRE
M3M India
R.S. Infraprojects
My Home Constructions