Upload Button Icon Add office photos

Filter interviews by

Kcc Buildcon Interview Questions, Process, and Tips

Updated 22 Jan 2025

Top Kcc Buildcon Interview Questions and Answers

View all 29 questions

Kcc Buildcon Interview Experiences

Popular Designations

28 interviews found

Interview Preparation Tips

Interview preparation tips for other job seekers - Store managment, sap knowledge,MRN,GRN, PO,PR, And Weigh Bridge managment

Store Executive Interview Questions asked at other Companies

Q1. How to measure the materials like steel and metal
View answer (10)

quality assurance pilling engineer Interview Questions & Answers

user image Abhishek Kumar

posted on 12 Apr 2021

I applied via Job Portal and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About site execution

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Quality questions asked by hr representative

Interview Questionnaire 

5 Questions

  • Q1. Describe the test of impact value what are its limit for wearing course and base course
  • Ans. 

    The impact value test measures the toughness of aggregates used in road construction.

    • The test involves dropping a steel ball from a specified height onto a sample of the aggregate.

    • The amount of impact energy absorbed by the sample is measured and recorded as the impact value.

    • For wearing course, the limit of impact value is 30 percent, while for base course, it is 45 percent.

    • Aggregates with higher impact values are cons...

  • Answered by AI
  • Q2. What is the relationship between unconsolidated compressive strength and CBR value
  • Ans. 

    Unconsolidated compressive strength and CBR value are inversely related.

    • Unconsolidated compressive strength is the strength of soil when it is not compacted.

    • CBR value is the ratio of the force required to penetrate a soil sample to the force required to penetrate a standard material.

    • As the unconsolidated compressive strength of soil increases, the CBR value decreases.

    • This is because a stronger soil requires more force

  • Answered by AI
  • Q3. What is CBR how it is performed
  • Ans. 

    CBR stands for California Bearing Ratio. It is a test to determine the strength of a soil subgrade or base course.

    • CBR is performed by measuring the pressure required to penetrate a soil sample with a standard piston.

    • The test is conducted by applying loads to the piston and measuring the penetration at each load increment.

    • The CBR value is calculated as the ratio of the measured penetration to the penetration of a standa...

  • Answered by AI
  • Q4. What is mdd and omc what is the minimum limit of mdd omc
  • Ans. 

    MDD and OMC are terms used in soil compaction testing. MDD is maximum dry density and OMC is optimum moisture content.

    • MDD is the maximum dry density of soil achieved through compaction testing.

    • OMC is the optimum moisture content of soil achieved through compaction testing.

    • The minimum limit of MDD and OMC varies depending on the type of soil being tested.

    • For example, the minimum MDD for a clay soil may be 1.6 g/cm³, whi...

  • Answered by AI
  • Q5. What is your salary expectation

Skills evaluated in this interview

Assistant Engineer Interview Questions asked at other Companies

Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
View answer (9)

HR Officer Interview Questions & Answers

user image Anonymous

posted on 27 Feb 2021

Interview Questionnaire 

2 Questions

  • Q1. What is manpower?
  • Ans. 

    Manpower refers to the total number of people available or required for a particular job, project, or organization.

    • Manpower is a term commonly used in HR and management.

    • It can refer to the total number of employees in an organization.

    • It can also refer to the number of employees required for a particular project or job.

    • Manpower planning is an important aspect of HR management.

    • Examples of industries that heavily rely on ...

  • Answered by AI
  • Q2. Pf

HR Officer Interview Questions asked at other Companies

Q1. Do you have prior knowledge to work in SAP modules?
View answer (3)

Kcc Buildcon interview questions for popular designations

 QA QC Engineer

 (2)

 Store Executive

 (2)

 Accountant

 (1)

 Assistant Engineer

 (1)

 Assistant General Manager

 (1)

 Assistant Officer

 (1)

 Bridge Design Engineer

 (1)

 Computer Operator

 (1)

I applied via Company Website and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. About myself
  • Q2. Tell me also my experience

Interview Preparation Tips

Interview preparation tips for other job seekers - always be positive

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (2)

Get interview-ready with Top Kcc Buildcon Interview Questions

Assistant Manager - Planning, Billing Interview Questions & Answers

user image Anonymous

posted on 19 Dec 2020

Interview Questionnaire 

1 Question

  • Q1. Do you know road estimator?

QC Engineer Interview Questions & Answers

user image Gaurav Mishra

posted on 21 Dec 2019

Interview Questionnaire 

13 Questions

  • Q1. Sulamb IS code
  • Q2. What is AIV test
  • Ans. 

    AIV test stands for Acceptance Inward Verification test.

    • AIV test is performed to verify the quality and functionality of incoming materials or components.

    • It ensures that the received materials meet the specified requirements and standards.

    • The test may involve visual inspection, measurements, functional testing, or other relevant checks.

    • AIV test helps in preventing the use of defective or substandard materials in produc...

  • Answered by AI
  • Q3. AIV test is a strength test of Corase Aggregate
  • Q4. What is density of cement
  • Ans. 

    The density of cement is a measure of its mass per unit volume.

    • Density is typically expressed in kilograms per cubic meter (kg/m³).

    • The density of cement can vary depending on factors such as the type of cement and its composition.

    • For example, the density of ordinary Portland cement is around 1440 kg/m³.

    • The density of cement is an important parameter in construction and engineering as it affects the strength and durabil...

  • Answered by AI
  • Q5. 1440kg/mm2
  • Q6. Cube density
  • Q7. Soil IS code
  • Ans. 

    The IS code for soil is IS 2720.

    • IS 2720 is the Indian Standard code for soil testing.

    • It provides guidelines for various tests to be conducted on soil.

    • The tests include determination of moisture content, specific gravity, and particle size distribution.

    • The code also covers tests for shear strength, compressibility, and permeability of soil.

    • IS 2720 is regularly updated to incorporate new testing methods and standards.

  • Answered by AI
  • Q8. Bitumine density
  • Q9. 1040kg/\mm2
  • Q10. Full name of FDD
  • Ans. 

    FDD stands for Functional Design Document.

    • FDD is a document that outlines the functional requirements of a system or product.

    • It includes details about the features, user interface, data flow, and other functional aspects of the system.

    • FDD is used by developers, testers, and other stakeholders to understand the requirements and design of the system.

    • It is often created during the software development life cycle (SDLC) an...

  • Answered by AI
  • Q11. Field Dry Density
  • Q12. What is initial final setting of cement
  • Ans. 

    Initial and final setting of cement are the stages when the cement changes from a plastic state to a solid state.

    • Initial setting time is the time taken by the cement to lose its plasticity and become rigid enough to withstand some pressure.

    • Final setting time is the time taken by the cement to completely lose its plasticity and become completely rigid.

    • The initial setting time of cement should not be less than 30 minutes...

  • Answered by AI
  • Q13. Initial and final setting testing of cement initalafter 30minfinal 600min under setting time
  • Ans. 

    Initial and final setting time of cement is tested after 30 and 600 minutes respectively.

    • Initial setting time is the time taken by cement to harden enough to resist certain pressure.

    • Final setting time is the time taken by cement to harden completely and attain its full strength.

    • The standard initial setting time for ordinary Portland cement is 30 minutes and final setting time is 600 minutes.

    • The setting time can be affe...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - work

Skills evaluated in this interview

Top Kcc Buildcon QC Engineer Interview Questions and Answers

Q1. initial and final setting testing of cement initalafter 30minfinal 600min under setting time
View answer (2)

QC Engineer Interview Questions asked at other Companies

Q1. What is heat exchanger? What is pressure vessel? Function of he/pv? Mechanical properties with codes and standards? Material grade and difference? ASME codes and standards? NDT test? WPS pqr wpq? P no. F no. A no? ITP stage?
View answer (1)

I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Profile related questions
  • Q2. Productivity of equipment
  • Ans. 

    Productivity of equipment is crucial for efficient operations.

    • Regular maintenance and upkeep can improve equipment productivity.

    • Investing in newer and more advanced equipment can also increase productivity.

    • Proper training of employees on equipment usage can prevent downtime and improve productivity.

    • Monitoring and analyzing equipment performance data can identify areas for improvement.

    • Implementing lean manufacturing pri...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare to do work pan india. Plant productivity, maintenance related questions.

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

Kcc Buildcon Interview FAQs

How many rounds are there in Kcc Buildcon interview?
Kcc Buildcon interview process usually has 2-3 rounds. The most common rounds in the Kcc Buildcon interview process are Technical, HR and Resume Shortlist.
How to prepare for Kcc Buildcon interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Kcc Buildcon. The most common topics and skills that interviewers at Kcc Buildcon expect are Material Procurement, Procurement, Purchase, Quantity Surveying and Rate Analysis.
What are the top questions asked in Kcc Buildcon interview?

Some of the top questions asked at the Kcc Buildcon interview -

  1. What is the difference between Batching Plant and Hot Mixing Pl...read more
  2. Describe the test of impact value what are its limit for wearing course and bas...read more
  3. What is the relationship between unconsolidated compressive strength and CBR va...read more
How long is the Kcc Buildcon interview process?

The duration of Kcc Buildcon interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Kcc Buildcon Interview Process

based on 22 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 414 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Kcc Buildcon Reviews and Ratings

based on 335 reviews

4.0/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.7

Salary

3.7

Job security

3.8

Company culture

3.5

Promotions

3.8

Work satisfaction

Explore 335 Reviews and Ratings
Assistant Manager
42 salaries
unlock blur

₹4.6 L/yr - ₹8.7 L/yr

Highway Engineer
35 salaries
unlock blur

₹2 L/yr - ₹5.6 L/yr

Senior Engineer
29 salaries
unlock blur

₹4.5 L/yr - ₹9.5 L/yr

Accountant
27 salaries
unlock blur

₹2.6 L/yr - ₹7.8 L/yr

Site Engineer
22 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Kcc Buildcon with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview