Free length of pile can be calculated by subtracting the embedment depth from the total length of the pile.
Calculate the total length of the pile
Determine the embedment depth of the pile
Subtract the embedment depth from the total length to get the free length
Torsion in pier cap and girder design is considered by analyzing the distribution of torsional forces and designing the elements to resist them.
Consider the distribution of torsional forces along the length of the pier cap and girder.
Design the pier cap and girder to resist torsional forces by providing adequate reinforcement.
Use software tools like STAAD.Pro or SAP2000 to analyze the torsional effects and optimize the...
Top trending discussions
posted on 25 Jun 2021
I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.
posted on 2 Jul 2022
I applied via Walk-in and was interviewed before Jul 2021. There were 2 interview rounds.
Arithmetic and logical reasoning
posted on 14 Nov 2017
I was interviewed before Nov 2016.
Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.
Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.
It involves the use of leveling instruments such as a level, theodolite, or laser level.
The process typically includes setting up benchmarks or reference points, taking readings at different...
The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.
The diameter is the distance across the center of a circle, passing through the circumference.
A six mm diameter can be visualized as a circle with a width of six millimeters.
It is a common measurement used in various industries, including engineering and manufacturing.
For example, a six mm diameter steel rod w...
LEP stands for Load Equivalent Factor for Pavement design.
LEP is used in pavement design to determine the load-carrying capacity of the pavement.
The formula for LEP depends on the specific design method being used.
For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))
Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...
posted on 22 Jul 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.
The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.
The ratio indicates the compressive strength of the concrete after 28 days of curing.
For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.
T...
posted on 22 Feb 2023
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 3 interview rounds.
Populations forcasting in detail
Tipcall question mostly available to in ner
I applied via Company Website and was interviewed in Aug 2020. There was 1 interview round.
posted on 19 Feb 2021
I applied via Walk-in and was interviewed in Sep 2020. There was 1 interview round.
posted on 8 Jan 2015
Discussion on soil mechanics starting from modulus of elasticity to liquifaction
Modulus of elasticity is a measure of soil stiffness
Soil strength is important in determining its ability to withstand loads
Liquifaction occurs when soil loses strength and behaves like a liquid
Factors affecting soil strength include soil type, moisture content, and stress history
Liquifaction can lead to soil failure and damage to structure
posted on 19 Jul 2017
based on 1 interview
Interview experience
Assistant Manager
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd