Filter interviews by
I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.
I have experience working in various types of construction including residential, commercial, and infrastructure projects.
Residential construction
Commercial construction
Infrastructure projects
Yes, there are codes for shuttering and concrete in civil engineering.
The Indian Standards Institution (ISI) has published codes for shuttering and concrete.
IS 456:2000 is the code for plain and reinforced concrete.
IS 3370:2009 is the code for concrete structures for storage of liquids.
IS 14687:1999 is the code for shuttering for reinforced concrete.
These codes provide guidelines for design, construction, and quality c
I applied via Referral and was interviewed before Aug 2020. There was 1 interview round.
Top trending discussions
posted on 11 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
Software or tool test
posted on 21 Mar 2023
I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.
Quantity of PQC can be calculated by multiplying area with thickness
PQC stands for Pavement Quality Concrete
Area is calculated by measuring length and width of the pavement
Thickness is usually 150 mm for highways
Quantity = Area x Thickness
Quantity of DBM can be calculated by using the formula: Volume of DBM = Area x Thickness
Calculate the area of the road surface to be covered with DBM
Determine the required thickness of the DBM layer
Multiply the area by the thickness to get the volume of DBM required
Consider the wastage factor while calculating the quantity of DBM
Use appropriate units of measurement for accuracy
based on 7 reviews
Rating in categories
Civil Site Engineer
33
salaries
| ₹1.6 L/yr - ₹6 L/yr |
Planning & Billing Engineer
7
salaries
| ₹3.8 L/yr - ₹9 L/yr |
Project Engineer
7
salaries
| ₹3.8 L/yr - ₹6.7 L/yr |
Site Engineer
7
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
Billing Engineer
6
salaries
| ₹3.6 L/yr - ₹4.2 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group