I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Different types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.
Portland cement is the most common type used in construction.
White cement is used for architectural purposes and to create colored concrete.
Rapid hardening cement is used in projects that require quick setting time.
Low heat cement is used in massive concrete structures to reduce heat generation during hydration.
Top trending discussions
posted on 23 Jul 2024
posted on 11 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 21 Mar 2023
I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.
Quantity of PQC can be calculated by multiplying area with thickness
PQC stands for Pavement Quality Concrete
Area is calculated by measuring length and width of the pavement
Thickness is usually 150 mm for highways
Quantity = Area x Thickness
Quantity of DBM can be calculated by using the formula: Volume of DBM = Area x Thickness
Calculate the area of the road surface to be covered with DBM
Determine the required thickness of the DBM layer
Multiply the area by the thickness to get the volume of DBM required
Consider the wastage factor while calculating the quantity of DBM
Use appropriate units of measurement for accuracy
posted on 26 Apr 2023
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Civil Site Engineer
33
salaries
| ₹1.6 L/yr - ₹6 L/yr |
Planning & Billing Engineer
7
salaries
| ₹3.8 L/yr - ₹9 L/yr |
Project Engineer
7
salaries
| ₹3.8 L/yr - ₹6.7 L/yr |
Site Engineer
7
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
Billing Engineer
6
salaries
| ₹3.6 L/yr - ₹4.2 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group