I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.
I have experience working in various types of construction including residential, commercial, and infrastructure projects.
Residential construction
Commercial construction
Infrastructure projects
Yes, there are codes for shuttering and concrete in civil engineering.
The Indian Standards Institution (ISI) has published codes for shuttering and concrete.
IS 456:2000 is the code for plain and reinforced concrete.
IS 3370:2009 is the code for concrete structures for storage of liquids.
IS 14687:1999 is the code for shuttering for reinforced concrete.
These codes provide guidelines for design, construction, and quality c
I applied via Walk-in and was interviewed in Sep 2024. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Different types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.
Portland cement is the most common type used in construction.
White cement is used for architectural purposes and to create colored concrete.
Rapid hardening cement is used in projects that require quick setting time.
Low heat cement is used in massive concrete structures to reduce heat generation during hydration.
Laps is a unit of length measurement used in textile industry while LD stands for Lateral Diffusion.
Laps is used to measure the length of yarn or fabric in textile industry.
LD is a term used in semiconductor physics to describe the movement of electrons or holes in a material.
Laps is measured in yards or meters while LD is measured in micrometers or nanometers.
Laps is a physical object while LD is a phenomenon.
Examples...
KAMLADITYYA CONSTRUCTION interview questions for popular designations
I applied via Referral and was interviewed before Aug 2020. There was 1 interview round.
posted on 11 Feb 2021
I applied via Campus Placement and was interviewed before Feb 2020. There were 5 interview rounds.
Cube mould size is a standard size used for testing the compressive strength of concrete.
Cube moulds are typically made of steel or cast iron.
The standard size for cube moulds is 150mm x 150mm x 150mm.
Other sizes such as 100mm x 100mm x 100mm and 200mm x 200mm x 200mm are also used.
The moulds are filled with concrete and left to cure before being tested for compressive strength.
Cube moulds are used to ensure that the c...
To calculate the weight of an 8mm diameter steel rod, use the formula: weight = volume x density.
Calculate the volume of the rod using the formula: volume = π x (diameter/2)^2 x length
Find the density of steel, which is typically around 7850 kg/m^3
Multiply the volume by the density to get the weight of the rod
posted on 7 Sep 2022
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.
posted on 25 Jun 2021
I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.
posted on 14 Nov 2017
I was interviewed before Nov 2016.
Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.
Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.
It involves the use of leveling instruments such as a level, theodolite, or laser level.
The process typically includes setting up benchmarks or reference points, taking readings at different...
The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.
The diameter is the distance across the center of a circle, passing through the circumference.
A six mm diameter can be visualized as a circle with a width of six millimeters.
It is a common measurement used in various industries, including engineering and manufacturing.
For example, a six mm diameter steel rod w...
LEP stands for Load Equivalent Factor for Pavement design.
LEP is used in pavement design to determine the load-carrying capacity of the pavement.
The formula for LEP depends on the specific design method being used.
For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))
Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...
I applied via Company Website and was interviewed in Aug 2020. There was 1 interview round.
based on 5 interviews
Interview experience
based on 61 reviews
Rating in categories
Civil Site Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Planning & Billing Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Billing Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group