Filter interviews by
I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.
RCC structure is a reinforced concrete structure that uses steel bars to reinforce concrete.
RCC structures are commonly used in buildings, bridges, and other structures.
The design of RCC structures is governed by various codes such as IS 456:2000.
RCC structures are designed to withstand various loads such as dead load, live load, wind load, and earthquake load.
The construction of an RCC structure involves various steps...
I would troubleshoot the issue, communicate with the team, and implement temporary solutions if necessary.
Check network connections and equipment for any issues
Restart routers and modems to refresh the connection
Prioritize essential tasks and postpone non-critical activities
Communicate with team members about the situation and potential delays
Implement temporary solutions such as using a backup internet connection or m
Two-factor authentication is a security process that requires two forms of identification to access an account or system.
Requires two different types of credentials for authentication
Common factors include something you know (password) and something you have (smartphone)
Provides an extra layer of security to prevent unauthorized access
Examples include receiving a code on your phone after entering your password
I applied via Referral and was interviewed in Dec 2024. There were 3 interview rounds.
The company currently has 150 employees working.
The company has a total of 150 employees currently working.
The number of employees may vary due to hiring or resignations.
It is important to keep track of the current employee count for reporting purposes.
The project is working in multiple countries.
The project is currently active in 10 countries.
Each country has its own team of workers.
The project requires coordination between different countries for smooth operation.
What people are saying about Kalpataru Projects International
I applied via Walk-in
Overseeing all environmental, health, and safety aspects at the site.
Developing and implementing EHS programs and policies
Conducting regular safety inspections and audits
Training employees on safety procedures and regulations
Ensuring compliance with local, state, and federal regulations
Investigating accidents and incidents to determine root causes
Kalpataru Projects International interview questions for popular designations
Steel is used along with concrete for RCC to provide tensile strength and prevent cracking.
Steel has high tensile strength, while concrete has high compressive strength, so combining them creates a material that can withstand both tension and compression forces.
Steel helps to prevent cracking in concrete structures by providing reinforcement against tensile stresses.
Steel also helps to increase the ductility of the str...
The weight of 1 bag of cement varies depending on the type and brand, but it is typically around 50-100 pounds.
The weight of a bag of cement can range from 40 to 94 pounds.
Different types of cement, such as Portland cement or masonry cement, may have different weights per bag.
Some brands may offer larger bags of cement that weigh more than the standard 50-94 pounds.
Get interview-ready with Top Kalpataru Projects International Interview Questions
I applied via Company Website and was interviewed in Sep 2024. There were 3 interview rounds.
Handle critical situations by staying calm, assessing the situation, making a plan, and executing it effectively.
Stay calm and composed to think clearly
Assess the situation to understand the severity and impact
Make a plan of action to address the critical situation
Execute the plan effectively while keeping communication open
Material SAP entries
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
The goal of an aptitude test is to predict the ability to learn new skills
To crash a program in Primavera P6 with resource loading and assigning, you can overload resources, assign more resources than available, or level resources improperly.
Overload resources by assigning more work to a resource than they can handle
Assign more resources to a task than are available in the resource pool
Level resources improperly by not considering resource availability and constraints
Project life cycle involves initiation, planning, execution, monitoring & controlling, and closure stages with management processes ensuring successful completion.
Initiation stage involves defining project scope, objectives, and feasibility.
Planning stage includes creating a detailed project plan, schedule, and budget.
Execution stage involves carrying out the project activities as per the plan.
Monitoring & controlling ...
I applied via Company Website and was interviewed in Jun 2024. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, building erection, finishing, and inspection.
Planning: Develop project scope, schedule, and budget.
Designing: Create detailed plans and blueprints.
Obtaining permits: Obtain necessary approvals from local authorities.
Site preparation: Clearing, grading, and leveling the construction site.
Foundation construc...
Different activities in project execution involve planning, scheduling, monitoring, controlling, and closing.
Planning involves defining project scope, objectives, and deliverables.
Scheduling includes creating timelines, assigning resources, and setting milestones.
Monitoring involves tracking progress, identifying issues, and making adjustments.
Controlling focuses on ensuring project stays on track and within budget.
Clo...
Some of the top questions asked at the Kalpataru Projects International interview -
The duration of Kalpataru Projects International interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 246 interviews
Interview experience
based on 4k reviews
Rating in categories
12-15 Yrs
Not Disclosed
Assistant Manager
551
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
548
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
523
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
276
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
242
salaries
| ₹0 L/yr - ₹0 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power