Filter interviews by
I applied via Referral and was interviewed in Sep 2023.ย There was 1 interview round.
I applied via Naukri.com and was interviewed in Dec 2024.ย There were 2 interview rounds.
I have over 10 years of experience in civil engineering, managing projects, coordinating with stakeholders, and ensuring compliance with regulations.
Managed multiple civil engineering projects from conception to completion
Coordinated with architects, contractors, and government agencies to ensure project success
Ensured compliance with building codes and regulations
Led a team of engineers and technicians to deliver high...
My area of expertise is in project management, specifically in civil engineering projects.
Extensive experience in managing civil engineering projects from conception to completion
Strong knowledge of construction methods, materials, and regulations
Skilled in budgeting, scheduling, and coordinating with various stakeholders
Proficient in using project management software such as Primavera P6 and Microsoft Project
Certified
I have over 8 years of experience in civil engineering, with a focus on project management and team leadership.
Managed multiple civil engineering projects from conception to completion
Led a team of engineers and contractors to ensure project deadlines were met
Collaborated with architects and clients to design and implement innovative solutions
Performed site inspections and quality control checks to ensure compliance wi...
I applied via Naukri.com and was interviewed in Jul 2024.ย There were 3 interview rounds.
My expectation is to contribute my skills and knowledge to the team, learn and grow professionally, and make a positive impact on the mining industry.
Expectation to contribute skills and knowledge to the team
Desire to learn and grow professionally
Goal of making a positive impact on the mining industry
Optimum utilisation of heavy earth moving machinery (HEMM) involves efficient planning, maintenance, and operation.
Regular maintenance schedules to prevent breakdowns and maximize uptime
Proper training for operators to ensure safe and efficient operation
Utilizing advanced technologies like GPS and telematics for real-time monitoring and optimization
Implementing effective fleet management strategies to minimize idle tim
Water management in opencast mining involves controlling water flow, preventing pollution, and ensuring proper drainage.
Implementing proper drainage systems to prevent water accumulation in the mining area
Using sedimentation ponds to treat water before releasing it back into the environment
Regular monitoring of water quality to ensure compliance with regulations
Implementing erosion control measures to prevent soil and ...
I applied via Approached by Company and was interviewed in Jun 2024.ย There were 5 interview rounds.
Share group profile and Up coming projects.
1400MW Bikaner Rajasthan project commissioning targets Nov. 2025.
Jindal Power interview questions for popular designations
Experienced General Manager with a proven track record in leading teams and driving business growth.
Over 10 years of experience in management roles
Strong leadership skills with a focus on team development
Successful track record in increasing revenue and profitability
Effective communicator with a strategic mindset
Previous experience in implementing process improvements and cost-saving initiatives
My area of expertise is in operations management, strategic planning, and team leadership.
Over 10 years of experience in managing operations and leading teams
Skilled in developing and implementing strategic plans to drive business growth
Proven track record of improving efficiency and productivity in various organizations
One can effectively tackle problems and enhance profitability through optimal resource utilization by identifying key issues, prioritizing tasks, delegating responsibilities, and continuously monitoring performance.
Identify key issues and prioritize tasks based on their impact on profitability.
Delegate responsibilities to team members based on their strengths and expertise.
Continuously monitor performance and adjust st...
Get interview-ready with Top Jindal Power Interview Questions
I was interviewed in Dec 2024.
Land acquisition and govt liaison purpose
I applied via Campus Placement and was interviewed in Jun 2024.ย There was 1 interview round.
DM PLANTS MECHANICAL DIPTMENT
I applied via Company Website and was interviewed in Sep 2023.ย There was 1 interview round.
I applied via Approached by Company and was interviewed in Apr 2023.ย There were 4 interview rounds.
Exemptions from statutory bodies in an opencast mine include environmental clearances, land acquisition permissions, and mining lease approvals.
Environmental clearances are required from bodies like the Ministry of Environment, Forest and Climate Change.
Land acquisition permissions may be needed from local government bodies or landowners.
Mining lease approvals are typically obtained from the relevant state government d...
I ensure proper safety measures are in place, including securing the area, using appropriate equipment, and following all regulations.
Securing the blasting area to prevent unauthorized access
Using appropriate personal protective equipment (PPE) such as helmets, goggles, and ear protection
Following all safety regulations and guidelines set by the company and relevant authorities
Conducting regular safety inspections and ...
Top trending discussions
Some of the top questions asked at the Jindal Power interview -
The duration of Jindal Power interview process can vary, but typically it takes about 2-4 weeks to complete.
based on 56 interviews
Interview experience
based on 324 reviews
Rating in categories
Botswana
5-10 Yrs
โน 15-30 LPA
Botswana
10-15 Yrs
โน 18-30 LPA
Assistant Manager
170
salaries
| โน0 L/yr - โน0 L/yr |
Deputy Manager
87
salaries
| โน0 L/yr - โน0 L/yr |
Manager
83
salaries
| โน0 L/yr - โน0 L/yr |
Assistant Engineer
61
salaries
| โน0 L/yr - โน0 L/yr |
Junior Engineer
30
salaries
| โน0 L/yr - โน0 L/yr |
Tata Power
Adani Power
NTPC
Reliance Power