Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
The test was based on aptitude section and core section(mine was chemical).
Heat transfer is the movement of thermal energy from one object to another due to a temperature difference.
Heat can be transferred through conduction, convection, and radiation.
Conduction is the transfer of heat through a material without any movement of the material itself.
Convection is the transfer of heat through the movement of fluids.
Radiation is the transfer of heat through electromagnetic waves.
Examples of heat ...
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I was interviewed before Jul 2023.
Jacobs Engineering Group interview questions for popular designations
I applied via Referral and was interviewed in Apr 2022. There were 2 interview rounds.
Get interview-ready with Top Jacobs Engineering Group Interview Questions
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
I applied via LinkedIn and was interviewed in Dec 2021. There were 6 interview rounds.
I applied via Company Website and was interviewed in Oct 2021. There were 2 interview rounds.
The parameters for fixing pump foundation height include soil conditions, pump type, vibration analysis, and accessibility.
Soil conditions: The foundation height should be determined based on the soil's bearing capacity and settlement characteristics.
Pump type: Different pump types have different requirements for foundation height to ensure proper operation and maintenance.
Vibration analysis: The foundation height shou...
PSV installation for open and closed systems involves different methods.
For open systems, the PSV is typically installed directly on the vent line, allowing the excess pressure to be released to the atmosphere.
For closed systems, the PSV is installed on a closed vessel or piping system and is connected to a discharge line that leads to a safe location or a flare system.
The PSV installation for closed systems requires c...
P&ID is made by identifying process equipment and connecting them with pipes. Line sizing is done based on process requirements.
Identify process equipment and their connections
Determine process requirements such as flow rate and pressure drop
Select appropriate pipe size based on process requirements
Consider factors such as fluid properties, pipe material, and layout
Use software tools such as AutoCAD or SmartPlant P&ID
I applied via Referral and was interviewed in Dec 2021. There was 1 interview round.
Top trending discussions
The duration of Jacobs Engineering Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 81 interviews
Interview experience
based on 921 reviews
Rating in categories
Design Engineer
272
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
152
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Designer
100
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Design Engineer
98
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
73
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Bechtel
Fluor Corporation
Worley