Filter interviews by
I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
I applied via LinkedIn and was interviewed before Mar 2019. There were 3 interview rounds.
I have over 10 years of experience in sales, with a proven track record of exceeding targets and building strong client relationships.
Managed a portfolio of key accounts, consistently meeting and exceeding sales targets
Developed and implemented strategic sales plans to drive revenue growth
Built and maintained strong relationships with clients, resulting in repeat business and referrals
Utilized CRM systems to track sale...
With sales head and site head
I was interviewed in Apr 2024.
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Nov 2023. There were 3 interview rounds.
Math, GK, Real Estates related questions
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
Site engineers are responsible for overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with various stakeholders.
Managing construction projects from start to finish
Supervising and coordinating construction workers
Ensuring safety regulations and building codes are followed
Collaborating with architects, engineers, and subcontractors
Preparing and presenting progre
I applied via Walk-in
RCC structure is a reinforced concrete structure commonly used in construction.
RCC structures consist of concrete reinforced with steel bars for added strength
Common types of RCC structures include beams, columns, slabs, and walls
RCC structures are designed to withstand heavy loads and provide durability
Proper reinforcement detailing is crucial for the structural integrity of RCC structures
MEP drawings are detailed plans that show the mechanical, electrical, and plumbing systems of a building.
MEP drawings include layouts for HVAC systems, electrical wiring, plumbing fixtures, and fire protection systems.
They are essential for coordinating the installation of these systems during construction.
MEP drawings also indicate the location of equipment, materials, and connections needed for the systems to functio...
A section of plumbing typically includes pipes, fittings, and fixtures for water supply and drainage systems.
Include pipes for both water supply and drainage systems
Show fittings such as elbows, tees, and couplings
Include fixtures like sinks, toilets, and showers
based on 66 reviews
Rating in categories
Legal Associate
7
salaries
| ₹4 L/yr - ₹5 L/yr |
Assistant Manager
6
salaries
| ₹3.6 L/yr - ₹7.6 L/yr |
Accountant
4
salaries
| ₹2.8 L/yr - ₹5 L/yr |
Deputy Manager
4
salaries
| ₹5.4 L/yr - ₹5.5 L/yr |
HR Executive
4
salaries
| ₹2.5 L/yr - ₹3.2 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group