Premium Employer

i

This company page is being actively managed by Infosys Team. If you also belong to the team, you can get access from here

Infosys Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Infosys Performance Tester Interview Questions and Answers

Updated 1 Nov 2024

Infosys Performance Tester Interview Experiences

5 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. List down Loadrunner components
  • Ans. 

    Loadrunner components include Virtual User Generator, Controller, Load Generator, Analysis

    • Virtual User Generator (VUGen) - used to create and edit scripts

    • Controller - used to organize, execute, and monitor tests

    • Load Generator - used to simulate virtual users

    • Analysis - used to analyze test results

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your expected package

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell me about yourself?
  • Ans. 

    I am a dedicated performance tester with a strong background in software testing and a passion for ensuring high-quality performance of applications.

    • Experienced in creating and executing performance test plans

    • Skilled in identifying performance bottlenecks and recommending solutions

    • Proficient in using tools like JMeter and LoadRunner

    • Strong analytical and problem-solving skills

    • Excellent communication and teamwork abiliti

  • Answered by AI

Performance Tester Interview Questions Asked at Other Companies

asked in CitiusTech
Q1. Assertion in Jmeter. what protocol used in jmeter 3. what is hit ... read more
asked in Finastra
Q2. Explain the scenario where you have faced memory leak issue?
asked in Finastra
Q3. What is memory leak issue? And how do you handle this?
asked in HCL Group
Q4. What is the run time setting parameters?
asked in Cognizant
Q5. How to split a string into multiple strings and assign them to an ... read more

I applied via campus placement at Sri Venkateswara University College of Engineering, Tirupati

Round 1 - One-on-one 

(2 Questions)

  • Q1. LoadRunner and JMeter
  • Q2. JMeter and Load Runner

Interview Preparation Tips

Interview preparation tips for other job seekers - Performance tester Load Runner,JMeter,Grafana, Appdynamics

Interview Questionnaire 

1 Question

  • Q1. Process of performance testing.
  • Ans. 

    Performance testing involves testing the speed, stability, and scalability of a software application under various conditions.

    • Identify performance testing objectives and requirements

    • Create test scenarios and scripts

    • Execute tests and collect performance metrics

    • Analyze results and identify bottlenecks

    • Report findings and recommend improvements

  • Answered by AI

Skills evaluated in this interview

Infosys interview questions for designations

 Performance Testing

 (1)

 Performance Test Engineer

 (5)

 Software Tester

 (20)

 ETL Tester

 (11)

 Automation Tester

 (4)

 Manual Tester

 (4)

 QA Tester

 (2)

 Selenium Automation Tester

 (6)

I applied via LinkedIn and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Tell me about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Tell about yourself

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Protocols used while testing with Jmeter
  • Ans. 

    JMeter supports various protocols for performance testing including HTTP, FTP, JDBC, SOAP, and more.

    • HTTP protocol is commonly used for web applications

    • FTP protocol is used for file transfer testing

    • JDBC protocol is used for testing database connections

    • SOAP protocol is used for testing web services

  • Answered by AI
  • Q2. What is Distributed load testing
  • Ans. 

    Distributed load testing involves simulating multiple virtual users from different locations to test the performance of a system under heavy load.

    • Involves simulating virtual users from different locations

    • Tests the performance of a system under heavy load

    • Helps identify bottlenecks and performance issues

    • Commonly used in web applications and APIs

  • Answered by AI
  • Q3. How to send some post data from a file in Jmeter
  • Ans. 

    Use JMeter to send post data from a file

    • Use CSV Data Set Config to read data from a file

    • Add HTTP Request sampler to send post data

    • Reference variables from CSV file in HTTP Request body

  • Answered by AI
  • Q4. What is Ramp up and ramp down
  • Ans. 

    Ramp up and ramp down are performance testing terms referring to gradually increasing or decreasing the load on a system.

    • Ramp up is the process of gradually increasing the number of virtual users accessing a system over a period of time.

    • Ramp down is the opposite process of gradually decreasing the number of virtual users accessing a system over a period of time.

    • Ramp up and ramp down help in simulating real-world scenar...

  • Answered by AI
  • Q5. What is pacing? And how is calculated.
  • Ans. 

    Pacing in performance testing refers to controlling the rate at which virtual users execute transactions to simulate real-world user behavior.

    • Pacing helps in simulating realistic user behavior by controlling the rate of transactions executed by virtual users.

    • It is calculated by dividing the total test duration by the number of transactions to be executed.

    • For example, if a test is scheduled to run for 1 hour and 600 tra...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. What is the performance testing
  • Ans. 

    Performance testing is a type of testing to ensure software applications perform well under expected workload.

    • Performance testing evaluates the speed, responsiveness, and stability of an application under various load conditions.

    • It helps identify bottlenecks, performance issues, and areas for improvement in the application.

    • Types of performance testing include load testing, stress testing, and scalability testing.

    • Tools ...

  • Answered by AI
  • Q2. What is the correlation
  • Ans. 

    Correlation is a statistical measure that describes the strength and direction of a relationship between two variables.

    • Correlation values range from -1 to 1, with 0 indicating no correlation, 1 indicating a perfect positive correlation, and -1 indicating a perfect negative correlation.

    • Positive correlation means that as one variable increases, the other variable also increases. Negative correlation means that as one var...

  • Answered by AI
  • Q3. Performance testing is used for checking the application behavior in terms of speed stability and scalability under various of work load
  • Q4. Correlation : Means replacing dynamic value by a parameter.In Correlation handling Dynamic Data generated by Server side.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please send me the link

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Assignment 

Company basics personal data

Interview Preparation Tips

Interview preparation tips for other job seekers - Communication skills
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Brief about myself
  • Q2. NFR details, Correlation, Check points, Monitoring

Interview Questionnaire 

9 Questions

  • Q1. What is the run time setting parameters?
  • Ans. 

    Run time setting parameters are values that can be set during test execution to control the behavior of the test.

    • Run time setting parameters are used to modify the behavior of the test during execution.

    • They can be used to simulate different user loads, network conditions, and other variables.

    • Examples include setting the number of virtual users, the duration of the test, and the think time between requests.

  • Answered by AI
  • Q2. What is the process of Agile?
  • Ans. 

    Agile is an iterative and incremental approach to software development that emphasizes flexibility and customer satisfaction.

    • Agile involves breaking down the project into smaller, manageable chunks called sprints.

    • Each sprint involves planning, designing, coding, testing, and reviewing the work done.

    • The team works closely with the customer to ensure that the product meets their needs.

    • Agile encourages collaboration, comm...

  • Answered by AI
  • Q3. What is the different between Think time and Pacing
  • Ans. 

    Think time is the time taken by a user to think and perform an action, while pacing is the time interval between two consecutive user actions.

    • Think time is the time taken by a user to read and understand the content on the screen before performing an action.

    • Pacing is the time interval between two consecutive user actions, which is used to simulate real-world user behavior.

    • Think time is used to simulate the time taken b...

  • Answered by AI
  • Q4. What the different b/w Test plan and RTM?
  • Ans. 

    Test plan is a document that outlines the testing strategy while RTM is a document that maps requirements to test cases.

    • Test plan outlines the scope, objectives, resources, and schedule of testing.

    • RTM maps the requirements to test cases to ensure all requirements are covered.

    • Test plan is created before testing begins while RTM is created during testing.

    • Test plan is a high-level document while RTM is a detailed document...

  • Answered by AI
  • Q5. What is the challenge your facing while scripting?
  • Ans. 

    The challenge I am facing while scripting is identifying and handling dynamic elements.

    • Dynamic elements such as timestamps and session IDs require unique handling

    • Identifying and correlating dynamic values across multiple requests can be time-consuming

    • Using regular expressions and functions can help in handling dynamic elements

  • Answered by AI
  • Q6. What are the parameter in result table?
  • Ans. 

    Parameters in result table are the values that are measured during performance testing.

    • Parameters can include response time, throughput, error rate, and resource utilization.

    • These values are used to analyze the performance of the system under test.

    • They can be compared against performance requirements or industry benchmarks.

    • Parameter values can be displayed in graphs or charts for easy analysis.

    • Examples of parameter val...

  • Answered by AI
  • Q7. What the process of Non functional testing ? Process?
  • Ans. 

    Non-functional testing is the process of testing the performance, reliability, and usability of a system.

    • Identify the non-functional requirements

    • Design test scenarios and test cases

    • Execute tests and collect data

    • Analyze the results and report findings

    • Repeat the process until the system meets the non-functional requirements

  • Answered by AI
  • Q8. Monitoring Tool ?
  • Q9. Perfmon?

Skills evaluated in this interview

Infosys Interview FAQs

How many rounds are there in Infosys Performance Tester interview?
Infosys interview process usually has 1-2 rounds. The most common rounds in the Infosys interview process are Technical, One-on-one Round and HR.
How to prepare for Infosys Performance Tester interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Infosys. The most common topics and skills that interviewers at Infosys expect are Performance Testing, JMeter, Load Runner, Load Testing and Performance Engineering.
What are the top questions asked in Infosys Performance Tester interview?

Some of the top questions asked at the Infosys Performance Tester interview -

  1. Process of performance testi...read more
  2. list down Loadrunner compone...read more
  3. LoadRunner and JMe...read more

Tell us how to improve this page.

Infosys Performance Tester Interview Process

based on 2 interviews

1 Interview rounds

  • Technical Round
View more
Join Infosys Creating the next opportunity for people, businesses & communities

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Accenture Interview Questions
3.8
 • 8.2k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Cognizant Interview Questions
3.8
 • 5.6k Interviews
Capgemini Interview Questions
3.7
 • 4.8k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
Genpact Interview Questions
3.8
 • 3.1k Interviews
LTIMindtree Interview Questions
3.8
 • 3k Interviews
IBM Interview Questions
4.0
 • 2.4k Interviews
View all
Infosys Performance Tester Salary
based on 129 salaries
₹2 L/yr - ₹10.5 L/yr
At par with the average Performance Tester Salary in India
View more details

Infosys Performance Tester Reviews and Ratings

based on 7 reviews

4.8/5

Rating in categories

4.8

Skill development

4.5

Work-life balance

3.2

Salary

4.7

Job security

4.1

Company culture

3.8

Promotions

4.6

Work satisfaction

Explore 7 Reviews and Ratings
Performance Tester - Infosys

Hyderabad / Secunderabad,

Pune

+1

4-9 Yrs

Not Disclosed

Performance Tester_ Chennai/Pune/Bangalore

Hyderabad / Secunderabad,

Chennai

+1

3-8 Yrs

Not Disclosed

Performance Tester - @Infosys

Hyderabad / Secunderabad,

Pune

+1

3-8 Yrs

Not Disclosed

Explore more jobs
Technology Analyst
55.9k salaries
unlock blur

₹3 L/yr - ₹11 L/yr

Senior Systems Engineer
50.4k salaries
unlock blur

₹2.8 L/yr - ₹8 L/yr

System Engineer
39.5k salaries
unlock blur

₹2.5 L/yr - ₹5.5 L/yr

Technical Lead
30.8k salaries
unlock blur

₹5.2 L/yr - ₹19.5 L/yr

Senior Associate Consultant
27.7k salaries
unlock blur

₹6.2 L/yr - ₹16.8 L/yr

Explore more salaries
Compare Infosys with

TCS

3.7
Compare

Wipro

3.7
Compare

Cognizant

3.8
Compare

Accenture

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview