Honda Motorcycle & Scooter
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Shortfall in teams can be overcome by identifying the root cause and implementing solutions such as training, hiring, or redistributing workload.
Identify the root cause of the shortfall
Implement solutions such as training, hiring, or redistributing workload
Communicate clearly with the team about the changes and expectations
Monitor progress and adjust solutions as necessary
I believe in transparency and disclosure to avoid conflicts of interest. If conflicts arise, I will recuse myself from decision-making.
Transparency and disclosure are key to avoiding conflicts of interest
Recusing oneself from decision-making is necessary if conflicts arise
Establishing clear policies and guidelines for handling conflicts of interest can also be helpful
Examples of conflicts of interest may include person...
Top trending discussions
posted on 4 Jul 2024
Project management and project planning
The NPD process with full project involves stages from idea generation to product launch.
Idea generation and screening
Concept development and testing
Business analysis
Prototype development
Market testing
Commercialization
Aptitude test was for 45 mins. General aptitude questions were there in the test.
There was a case study. Contrary views were also accepted by the panel.
posted on 24 Jan 2023
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Takt time is calculated by dividing the available production time by the customer demand.
Calculate the total available production time in a specified period (e.g. 1 day)
Determine the customer demand for the same period
Divide the total available production time by the customer demand to get the takt time
Takt Time = Total Production Time / Customer Demand
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Identify the tasks required to complete a process
Determine the cycle time for each task
Assign tasks to workstations based on cycle time and workload
Ensure that workstations are balanced to avoid bottlenecks
Regularly review and adjust the line balancing to optimize efficiency
Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.
Identify the key components of the system or process that contribute to its capacity
Collect data on the current workload or demand placed on the system
Use mathematical models or simulations to predict how the system will perform under different levels of workload
Consider factors such as resource ava...
There are three types of corner units: L-shaped, U-shaped, and diagonal. Sizes vary depending on the specific unit.
L-shaped corner units have two sides that meet at a right angle.
U-shaped corner units have three sides that meet at right angles.
Diagonal corner units are used to connect two non-adjacent sides at an angle.
Sizes can vary based on the specific unit and manufacturer.
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before Aug 2019. There was 1 interview round.
I have 3 years of experience in lean manufacturing, focusing on process improvement and waste reduction.
Implemented lean manufacturing principles to optimize production processes
Identified and eliminated non-value-added activities to improve efficiency
Led cross-functional teams to implement lean initiatives
Reduced lead times by 20% through the implementation of Kanban system
Implemented 5S methodology to improve workpla
Developing a lean system in the shop floor area involves identifying and eliminating waste to improve efficiency.
Identify the value stream and map out the current process
Identify and eliminate waste (muda) such as overproduction, waiting, defects, excess inventory, unnecessary motion, overprocessing, and unused talent
Implement a pull system to reduce inventory and improve flow
Standardize work processes and create a cul...
I'm sorry, but I don't have any information about KODAVARY system.
N/A
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
APQP has five stages: Planning, Product Design, Process Design, Product and Process Validation, and Launch, Assessment and Corrective Action.
Stage 1: Planning - Define the project scope, objectives, and requirements.
Stage 2: Product Design - Develop the product design and engineering specifications.
Stage 3: Process Design - Develop the manufacturing process and control plan.
Stage 4: Product and Process Validation - Ver...
Gate audit is a review process to ensure that a project has met specific criteria before proceeding to the next phase.
Gate audit is conducted at the end of each project phase to ensure that the project is on track and meets the predefined criteria.
It involves a review of project deliverables, budget, schedule, and risks to ensure that they are in line with the project plan.
The gate audit process helps to identify poten...
based on 1 review
Rating in categories
Manager
819
salaries
| ₹13.5 L/yr - ₹28.1 L/yr |
Assistant Manager
806
salaries
| ₹10.7 L/yr - ₹22 L/yr |
Senior Executive
774
salaries
| ₹9.1 L/yr - ₹17.8 L/yr |
Executive
639
salaries
| ₹5 L/yr - ₹15 L/yr |
Area Sales Manager
186
salaries
| ₹8 L/yr - ₹19.5 L/yr |
Hero MotoCorp
Bajaj Auto
TVS Motor
Royal Enfield