APQP has five stages: Planning, Product Design, Process Design, Product and Process Validation, and Launch, Assessment and Corrective Action.
Stage 1: Planning - Define the project scope, objectives, and requirements.
Stage 2: Product Design - Develop the product design and engineering specifications.
Stage 3: Process Design - Develop the manufacturing process and control plan.
Stage 4: Product and Process Validation - Ver...
Gate audit is a review process to ensure that a project has met specific criteria before proceeding to the next phase.
Gate audit is conducted at the end of each project phase to ensure that the project is on track and meets the predefined criteria.
It involves a review of project deliverables, budget, schedule, and risks to ensure that they are in line with the project plan.
The gate audit process helps to identify poten...
Top trending discussions
posted on 4 Jul 2024
Project management and project planning
The NPD process with full project involves stages from idea generation to product launch.
Idea generation and screening
Concept development and testing
Business analysis
Prototype development
Market testing
Commercialization
There are three types of corner units: L-shaped, U-shaped, and diagonal. Sizes vary depending on the specific unit.
L-shaped corner units have two sides that meet at a right angle.
U-shaped corner units have three sides that meet at right angles.
Diagonal corner units are used to connect two non-adjacent sides at an angle.
Sizes can vary based on the specific unit and manufacturer.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Takt time is calculated by dividing the available production time by the customer demand.
Calculate the total available production time in a specified period (e.g. 1 day)
Determine the customer demand for the same period
Divide the total available production time by the customer demand to get the takt time
Takt Time = Total Production Time / Customer Demand
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Identify the tasks required to complete a process
Determine the cycle time for each task
Assign tasks to workstations based on cycle time and workload
Ensure that workstations are balanced to avoid bottlenecks
Regularly review and adjust the line balancing to optimize efficiency
Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.
Identify the key components of the system or process that contribute to its capacity
Collect data on the current workload or demand placed on the system
Use mathematical models or simulations to predict how the system will perform under different levels of workload
Consider factors such as resource ava...
I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
posted on 4 Jul 2024
Project management and project planning
The NPD process with full project involves stages from idea generation to product launch.
Idea generation and screening
Concept development and testing
Business analysis
Prototype development
Market testing
Commercialization
I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.
based on 8 reviews
Rating in categories
Deputy Manager
1k
salaries
| ₹6 L/yr - ₹21 L/yr |
Assistant Manager
691
salaries
| ₹5.6 L/yr - ₹19 L/yr |
Associate Manager
647
salaries
| ₹10.4 L/yr - ₹25.1 L/yr |
Territory Sales Manager
369
salaries
| ₹7.3 L/yr - ₹16 L/yr |
Manager
332
salaries
| ₹12 L/yr - ₹30.8 L/yr |
Bajaj Auto
TVS Motor
Royal Enfield
Suzuki Motorcycle