Highway Construction Co.pvt.ltd Senior Project Manager Interview Questions and Answers

Updated 21 Aug 2022

Highway Construction Co.pvt.ltd Senior Project Manager Interview Experiences

1 interview found

Round 1 - Technical 

(14 Questions)

  • Q1. Component of flexible pavements. Embankment, subgrade, GSB,Confinement layer and new blanket, wmm, prime coat,tackcoat,DBM,tack coat Bc, wear coat Thickness 3m,500mm,300mm,300mm,150mm,50mm 6to 8mm
  • Q2. Compare flexible pavements rigid pavement. Flexible pavement less castier. and maintenance coast ie more.rigid pavement much castiler and low maintenance coast.
  • Ans. 

    Flexible pavements are less costly but require more maintenance, while rigid pavements are more expensive but have lower maintenance costs.

    • Flexible pavements are made of asphalt and are more flexible, allowing them to better withstand heavy traffic and temperature changes.

    • Rigid pavements are made of concrete and are more durable, with a longer lifespan and lower maintenance costs.

    • Flexible pavements are easier and cheap...

  • Answered by AI
  • Q3. Sub grade tolerance. Plus,minus,20mm
  • Q4. GSB It mixture aggregate and stone dust large size of grains 65mm to 75mm, GSB is crushed 50%,, cbr>30% plastic index<8% watercontent<2% ,impact valve<40%
  • Ans. 

    GSB is a mixture of aggregate and stone dust with large grains, crushed 50%, and specific requirements for cbr, plastic index, water content, and impact value.

    • GSB is a type of construction material made from a mixture of aggregate and stone dust.

    • The grains in GSB are large, ranging from 65mm to 75mm in size.

    • GSB is crushed to a 50% ratio.

    • To meet specifications, GSB must have a cbr value of over 30%.

    • GSB must also have a ...

  • Answered by AI
  • Q5. Embankment3m, large size of soil particles 70mm lumps and clouds.liqid limits <50% plastic limit <25%, swelling and shrinkage 50%, effective cbr as per design
  • Q6. Subgrade 500mm, large size of soil particles 50mm lumps and cloud. effective cbr as per design.
  • Ans. 

    The question is asking about the effective CBR of a subgrade with 500mm depth and large soil particles of 50mm lumps and cloud.

    • Subgrade depth is 500mm

    • Soil particles are large with 50mm lumps and cloud

    • The question is asking about the effective CBR as per design

  • Answered by AI
  • Q7. Wmm 300mm, it is mixture aggregate 4.75mm to 20mm stone dust morum,fly ash.it mix in premixed batching plant homogeneous and uniform.
  • Q8. GSB and WMM between confinement layer and blamket
  • Ans. 

    GSB and WMM are layers used for road construction between the confinement layer and blanket.

    • GSB stands for Granular Sub Base and WMM stands for Wet Mix Macadam.

    • These layers are used to provide a stable base for the road and prevent water from seeping into the subgrade.

    • GSB is made up of crushed rock and WMM is a mixture of stone aggregates and water.

    • The thickness of these layers depends on the type of road and the traff...

  • Answered by AI
  • Q9. Wmm on prime coat, it low viscous cut back bitumen on sub base surfaces area pores and void fill up.Tack coat ,it is light application bitumen, asphalt, emulsion
  • Ans. 

    Wmm on prime coat uses low viscous cut back bitumen to fill pores and voids on sub base surfaces. Tack coat is a light application of bitumen, asphalt, emulsion.

    • Wmm on prime coat is used to fill pores and voids on sub base surfaces

    • It uses low viscous cut back bitumen for this purpose

    • Tack coat is a light application of bitumen, asphalt, emulsion

    • Tack coat is used to ensure proper bonding between the layers of asphalt

    • Both...

  • Answered by AI
  • Q10. Provided DBM thicknesses 150mm above DBM Tack coat Provided . Aggregate size 20 to 28mm VG 30 grade bitumen. It is load bearing surface area.
  • Q11. BC 50MM it is mixture of 13.2 mm aggregate VG 30 GRADE BITUMEN.
  • Q12. Seal coat provide 6to8mm bitumen mix coarse sand.
  • Q13. Rigid pavement dlc 150 mm thickness provided aggregate size 26.5mm min water content2%, soundenss tesr Naso4 12% Mgso418%, angle of abrasion <35% Max FI&EI<35%, equivalent weight of sand <50% workabilit...
  • Q14. Pqc ,thicknesses 300mm aggregate size 31.5mm use M40 grade concrete. Minimum cement content 360 kg per cum. Pqc layer their two types of joint expension ijoint ,longitudinal joint. Expension jiont dow...

Interview Preparation Tips

Interview preparation tips for other job seekers - As per site situation other function of work to be required.

Skills evaluated in this interview

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Highway Construction Co.pvt.ltd?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mostly technical related to the job position and expectancy of the organisation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Value proposition to the organisation should be taken care of.

Senior Project Manager Interview Questions Asked at Other Companies

Q1. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concr ... read more
Q2. Design procedure of PQC:- Use M40 grade concrete. 1:- The minimum ... read more
Q3. Design procedure :- 1 :- The minimum cement content 360 kg per cu ... read more
Q4. DESINGN PROCEDURE:- 1:- The minimum cement content 360 kg/ cum, i ... read more
Q5. DESINGN PROCEDURE :- 1:- Use M15 grade concrete. Aggregate and ce ... read more

I applied via Naukri.com and was interviewed before Dec 2019. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. You ask my site experience
  • Q2. Job responsibilities and working status

Interview Preparation Tips

Interview preparation tips for other job seekers - Firsthours
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Why we are use lap in centre of column or Zone B?
  • Ans. 

    Lap is used in the center of a column or Zone B for structural stability and reinforcement.

    • Lap joints provide additional strength and stability to the column.

    • They help in distributing the load evenly across the column.

    • Lap joints prevent the column from cracking or failing under heavy loads.

    • Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.

    • By using lap in the...

  • Answered by AI
  • Q2. Where are construction joint is provide in simply supported slab?
  • Ans. 

    Construction joints are provided at mid-span of simply supported slabs.

    • Construction joints are provided to allow for differential movement between adjacent sections of the slab.

    • They are typically located at mid-span of the slab, where the bending moment is zero.

    • The joint should be designed to transfer shear and moment between the two sections of the slab.

    • Proper reinforcement detailing is necessary to ensure the joint f...

  • Answered by AI
  • Q3. L/6 or L/ 3 where L is sapan of slab
  • Ans. 

    L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.

    • L/6 is used for residential buildings while L/3 is used for commercial buildings.

    • The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.

    • For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6)...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are doing your job with practical experience then no worries about any interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Procedure of project start up.
  • Ans. 

    Project start up involves defining project scope, setting objectives, assembling team, creating project plan, and securing resources.

    • Define project scope to outline goals and deliverables

    • Set project objectives to establish clear direction

    • Assemble project team with necessary skills and expertise

    • Create project plan with timelines, milestones, and tasks

    • Secure resources such as budget, equipment, and materials

  • Answered by AI
Round 2 - Cost Estimate 

(1 Question)

  • Q1. Preparation of CTC
  • Ans. 

    Preparation of CTC involves calculating total cost of employment including salary, benefits, and taxes.

    • Calculate base salary of employee

    • Include benefits such as health insurance, retirement plans, and bonuses

    • Factor in taxes and other employer contributions

    • Consider any additional costs like training or equipment

    • Review and adjust CTC periodically to stay competitive

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Benefit and pakage
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Nov 2024, where I was asked the following questions.

  • Q1. Labour mobilization
  • Q2. How to deal Execution
  • Ans. 

    Effective execution involves planning, communication, monitoring, and adapting to ensure project success.

    • Establish clear objectives: Define what success looks like for the project.

    • Develop a detailed project plan: Include timelines, resources, and milestones.

    • Communicate regularly: Keep stakeholders informed and engaged throughout the project.

    • Monitor progress: Use KPIs to track performance and identify issues early.

    • Adapt...

  • Answered by AI
  • Q3. Budgeting process

I applied via Company Website and was interviewed before Sep 2021. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Your profile and your experience Family background
  • Ans. 

    I have a strong profile and extensive experience in project management.

    • Over 10 years of experience in leading and delivering successful projects

    • Proven track record of managing large cross-functional teams

    • Expertise in budgeting, resource allocation, and risk management

    • Strong communication and stakeholder management skills

    • Experience in various industries including technology, construction, and healthcare

  • Answered by AI
  • Q2. Aptitude test It is your mental ability test
Round 2 - Technical 

(3 Questions)

  • Q1. About your technical knowledge
  • Q2. Like your discipline knowledge
  • Q3. Say electrical engineering
  • Ans. 

    Electrical engineering involves the study and application of electricity, electronics, and electromagnetism.

    • Designing and testing electrical systems and equipment

    • Developing and implementing electrical projects

    • Troubleshooting and repairing electrical issues

    • Collaborating with other engineers and professionals

    • Examples: designing power grids, developing renewable energy sources, creating electronic devices

  • Answered by AI
Round 3 - Medical 

(1 Question)

  • Q1. Have positive attitude and confidence
Round 4 - Salary negotiation 

(1 Question)

  • Q1. As per your designation

Interview Preparation Tips

Interview preparation tips for other job seekers - Best place to work
Give technical interview
Then apptitude test
HR interview
Finally medical test
Are these interview questions helpful?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. How to improve profitability
  • Ans. 

    To improve profitability, focus on cost reduction, increasing revenue, and optimizing processes.

    • Identify and eliminate unnecessary expenses

    • Increase sales through marketing strategies or expanding product offerings

    • Streamline operations to reduce waste and improve efficiency

  • Answered by AI

I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Different construction activities rates, like plinth area, individual rates for shuttering, reinforcement works, how to cost control in major items in the project etc
  • Ans. 

    Cost control in construction activities through effective management of major items

    • Develop a detailed cost estimate for the project

    • Monitor and track actual costs against the estimate

    • Identify major cost drivers and implement cost-saving measures

    • Regularly review and update the project budget

    • Ensure effective communication and collaboration between all stakeholders

    • Use technology and software to streamline cost control proc...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - He was asked in project topic related new project, previous work experience and brief description of works, previous working team strength and capabilities and how to execute a project in brief from starting to closing of project in-sequence etc.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. How to handle project with team
  • Ans. 

    Effective project handling involves clear communication, defined roles, and fostering collaboration within the team.

    • Establish clear goals: Define project objectives and ensure everyone understands their role in achieving them.

    • Foster open communication: Encourage team members to share ideas and concerns regularly, using tools like Slack or weekly meetings.

    • Utilize project management tools: Implement software like Trello ...

  • Answered by AI
  • Q2. Electrical residential projects

Highway Construction Co.pvt.ltd Interview FAQs

How many rounds are there in Highway Construction Co.pvt.ltd Senior Project Manager interview?
Highway Construction Co.pvt.ltd interview process usually has 1 rounds. The most common rounds in the Highway Construction Co.pvt.ltd interview process are Technical.
What are the top questions asked in Highway Construction Co.pvt.ltd Senior Project Manager interview?

Some of the top questions asked at the Highway Construction Co.pvt.ltd Senior Project Manager interview -

  1. Compare flexible pavements rigid pavement. Flexible pavement less castier....read more
  2. Wmm on prime coat, it low viscous cut back bitumen on sub base surfaces area ...read more
  3. Subgrade 500mm, large size of soil particles 50mm lumps and cloud. effective ...read more