Round 1 - Technical 

(14 Questions)

  • Q1. Component of flexible pavements. Embankment, subgrade, GSB,Confinement layer and new blanket, wmm, prime coat,tackcoat,DBM,tack coat Bc, wear coat Thickness 3m,500mm,300mm,300mm,150mm,50mm 6to 8mm
  • Q2. Compare flexible pavements rigid pavement. Flexible pavement less castier. and maintenance coast ie more.rigid pavement much castiler and low maintenance coast.
  • Ans. 

    Flexible pavements are less costly but require more maintenance, while rigid pavements are more expensive but have lower maintenance costs.

    • Flexible pavements are made of asphalt and are more flexible, allowing them to better withstand heavy traffic and temperature changes.

    • Rigid pavements are made of concrete and are more durable, with a longer lifespan and lower maintenance costs.

    • Flexible pavements are easier and cheap...

  • Answered by AI
  • Q3. Sub grade tolerance. Plus,minus,20mm
  • Q4. GSB It mixture aggregate and stone dust large size of grains 65mm to 75mm, GSB is crushed 50%,, cbr>30% plastic index<8% watercontent<2% ,impact valve<40%
  • Ans. 

    GSB is a mixture of aggregate and stone dust with large grains, crushed 50%, and specific requirements for cbr, plastic index, water content, and impact value.

    • GSB is a type of construction material made from a mixture of aggregate and stone dust.

    • The grains in GSB are large, ranging from 65mm to 75mm in size.

    • GSB is crushed to a 50% ratio.

    • To meet specifications, GSB must have a cbr value of over 30%.

    • GSB must also have a ...

  • Answered by AI
  • Q5. Embankment3m, large size of soil particles 70mm lumps and clouds.liqid limits <50% plastic limit <25%, swelling and shrinkage 50%, effective cbr as per design
  • Q6. Subgrade 500mm, large size of soil particles 50mm lumps and cloud. effective cbr as per design.
  • Ans. 

    The question is asking about the effective CBR of a subgrade with 500mm depth and large soil particles of 50mm lumps and cloud.

    • Subgrade depth is 500mm

    • Soil particles are large with 50mm lumps and cloud

    • The question is asking about the effective CBR as per design

  • Answered by AI
  • Q7. Wmm 300mm, it is mixture aggregate 4.75mm to 20mm stone dust morum,fly ash.it mix in premixed batching plant homogeneous and uniform.
  • Q8. GSB and WMM between confinement layer and blamket
  • Ans. 

    GSB and WMM are layers used for road construction between the confinement layer and blanket.

    • GSB stands for Granular Sub Base and WMM stands for Wet Mix Macadam.

    • These layers are used to provide a stable base for the road and prevent water from seeping into the subgrade.

    • GSB is made up of crushed rock and WMM is a mixture of stone aggregates and water.

    • The thickness of these layers depends on the type of road and the traff

  • Answered by AI
  • Q9. Wmm on prime coat, it low viscous cut back bitumen on sub base surfaces area pores and void fill up.Tack coat ,it is light application bitumen, asphalt, emulsion
  • Ans. 

    Wmm on prime coat uses low viscous cut back bitumen to fill pores and voids on sub base surfaces. Tack coat is a light application of bitumen, asphalt, emulsion.

    • Wmm on prime coat is used to fill pores and voids on sub base surfaces

    • It uses low viscous cut back bitumen for this purpose

    • Tack coat is a light application of bitumen, asphalt, emulsion

    • Tack coat is used to ensure proper bonding between the layers of asphalt

    • Both...

  • Answered by AI
  • Q10. Provided DBM thicknesses 150mm above DBM Tack coat Provided . Aggregate size 20 to 28mm VG 30 grade bitumen. It is load bearing surface area.
  • Q11. BC 50MM it is mixture of 13.2 mm aggregate VG 30 GRADE BITUMEN.
  • Q12. Seal coat provide 6to8mm bitumen mix coarse sand.
  • Q13. Rigid pavement dlc 150 mm thickness provided aggregate size 26.5mm min water content2%, soundenss tesr Naso4 12% Mgso418%, angle of abrasion <35% Max FI&EI<35%, equivalent weight of sand <50% workabilit...
  • Q14. Pqc ,thicknesses 300mm aggregate size 31.5mm use M40 grade concrete. Minimum cement content 360 kg per cum. Pqc layer their two types of joint expension ijoint ,longitudinal joint. Expension jiont dow...

Interview Preparation Tips

Interview preparation tips for other job seekers - As per site situation other function of work to be required.

Skills evaluated in this interview

Senior Project Manager Interview Questions asked at other Companies

Q1. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than &gt;20% the mini.mum cement content. 120kg pet cum 3:- The 5 no sample... read more
View answer (3)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Your Current Sallary.
  • Ans. 

    I am currently earning $60,000 per year.

    • My current salary is $60,000 per year.

    • I am satisfied with my current salary.

    • I believe my salary reflects my experience and qualifications.

  • Answered by AI
  • Q2. Expected salary
  • Q3. Negotiable sallary how much you negotiate.
  • Q4. Yourself Introduction.
  • Q5. About Your projects, experience and some technical question . I.e. procedure of work , productivity of workman and how to start your activities etc.

Interview Preparation Tips

You should be confident don't be nervous and Give your best.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before May 2017.

Interview Questionnaire 

4 Questions

  • Q1. Good discussion with accounts team
  • Q2. Having good discussion with team
  • Q3. Good discussion for salary and others
  • Q4. Good company for working
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Type of pile , why we provide pile,pile dia , lvup vup svup type questions
  • Ans. 

    Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.

    • Types of piles include driven piles, bored piles, and screw piles.

    • Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.

    • The diameter of a pile is determined based on the load it needs to support and the soil conditions.

    • LVUP (Large...

  • Answered by AI
  • Q2. Mostly we use two types of pile (1) friction pile (2)end bearing pile

Interview Preparation Tips

Interview preparation tips for other job seekers - Please read MORTH AN

Senior Designer Bim Interview Questions & Answers

AECOM user image Anonymous

posted on 10 Feb 2021

Interview Questionnaire 

2 Questions

  • Q1. Why do you want to join Aecom.
  • Q2. What kind of projects have you done? And what is the probem face of them. And how to resolve.

Interview Preparation Tips

Interview preparation tips for other job seekers - Aecom is a big name in the engineering field, here we will get a lot to learn so that our future will grow well. Tell the truth about what you know or else you will face problems. Because next you have to do all the work yourself. Because of the high work load, no one can help you much. I worked at Aecom for seven years. I have learned a lot there. Salary always comes on time. Due to pendamic we had to leave the job due to lack of work. But the Aecom company had done our full and final settelement within a month. Aecom is a very good company. If I get a chance to work in the company again, I would definitely like to join. Workload is very high. Deadline is very less, which affects its quality of work.

I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. *How many year experience do have
  • Q2. How long did you work in your previous company and what did you do?
  • Q3. What do you expect For your next job

Interview Preparation Tips

Interview preparation tips for other job seekers - This is MNC company, after sales service are a bit low,

Interview Questionnaire 

6 Questions

  • Q1. Percentage of steel in pile
  • Ans. 

    The percentage of steel in a pile varies depending on the type and design of the pile.

    • The percentage of steel in a pile can range from 0% to over 90%.

    • The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.

    • Steel piles typically have a higher percentage of steel than other types of piles.

    • The percentage of steel in a pile can also affect its

  • Answered by AI
  • Q2. Pile built-up above cut off level as per IS code
  • Ans. 

    Pile built-up above cut off level as per IS code

    • IS code specifies the maximum allowable pile length above cut off level

    • Pile length above cut off level should not exceed 3 times the pile diameter

    • Built-up pile above cut off level can cause structural instability and failure

  • Answered by AI
  • Q3. Pile vertical tolerance as per IS code
  • Ans. 

    Vertical tolerance for piles as per IS code

    • As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm

    • This tolerance is applicable for both driven and cast-in-situ piles

    • The tolerance is measured at the top of the pile and at intervals of 3m along the length

    • If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken

  • Answered by AI
  • Q4. Pile concrete consumption +- tolerance
  • Ans. 

    Pile concrete consumption tolerance depends on various factors.

    • Pile diameter and length

    • Concrete mix design

    • Placement method

    • Quality control measures

    • Environmental conditions

    • Tolerance typically ranges from 5-10% of estimated consumption

    • Regular monitoring and adjustment of concrete consumption is necessary

  • Answered by AI
  • Q5. Unit weight of steel
  • Ans. 

    Unit weight of steel is 7850 kg/m³

    • The unit weight of steel is the weight of a specific volume of steel

    • It is measured in kilograms per cubic meter (kg/m³)

    • The unit weight of steel is 7850 kg/m³

    • This value may vary slightly depending on the composition and manufacturing process of the steel

  • Answered by AI
  • Q6. Contractor MB related

I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How much cement used for making 1m³ concrete
  • Ans. 

    The amount of cement used for making 1m³ of concrete varies depending on the desired strength and type of concrete.

    • The cement content typically ranges from 300 to 400 kg/m³ for general-purpose concrete.

    • For high-strength concrete, the cement content can be as high as 500 kg/m³ or more.

    • The water-cement ratio also affects the amount of cement required.

    • Admixtures and additives may be used to modify the properties of the co...

  • Answered by AI
  • Q2. 360 kg
  • Q3. How much steel used for 1m³ concreting
  • Ans. 

    The amount of steel used for 1m³ concreting varies depending on the type of concrete and the structural requirements.

    • The steel used in concrete is typically in the form of reinforcing bars (rebar) or welded wire mesh.

    • The amount of steel required for 1m³ of concrete depends on the structural requirements and the type of concrete being used.

    • For example, a standard reinforced concrete slab may require 70-100 kg of steel p...

  • Answered by AI
  • Q4. This answer given by a formula & some thumbrules of this answer

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge is the best knowledge.....interviewer asked so much questions to ask but I'm ready to give his answers .It lasted for about 30 minutes.Luckily I was able to answer most of the questions correctly. I tried to give my best. My advice is to stay calm & should apply presence of mind.

Interview Questionnaire 

11 Questions

  • Q1. Structural welding codes, Bridge welding codes
  • Q2. Process piping works
  • Ans. 

    Process piping works involve the installation, inspection, and maintenance of pipes used in industrial processes.

    • Process piping works include the design, fabrication, and installation of pipes for conveying fluids or gases in industrial settings.

    • QA QC engineers ensure that the piping systems meet the required standards and specifications.

    • Inspection and testing of process piping is done to check for leaks, pressure, and...

  • Answered by AI
  • Q3. Bolts tightening procedure
  • Ans. 

    Bolts tightening procedure involves following a specific torque value and sequence to ensure proper fastening of bolts.

    • Check the torque value specified in the design or manual

    • Use a torque wrench to tighten the bolts to the specified value

    • Tighten the bolts in a specific sequence to ensure even distribution of load

    • Recheck the torque value after tightening all bolts

    • Record the torque value and sequence for future reference

  • Answered by AI
  • Q4. Bolts testing and torqueing sequences.
  • Q5. Hydrotest and pneumatic test for piping
  • Ans. 

    Hydrotest and pneumatic test are methods used to test the integrity of piping systems.

    • Hydrotest involves filling the piping system with water and pressurizing it to a specified level for a set duration.

    • Pneumatic test involves filling the piping system with compressed air or nitrogen and pressurizing it to a specified level for a set duration.

    • Both tests are used to ensure that the piping system can withstand the expecte...

  • Answered by AI
  • Q6. Able to refer codes and procedures.
  • Q7. Painting knowledge
  • Q8. Able to repair painted surface area.
  • Q9. Clients and inspection agency
  • Q10. Clients faced interviews.
  • Q11. Job training

Electrical OHE Engineer Interview Questions & Answers

KEC International user image Mahesh Meena

posted on 9 Sep 2020

I applied via Company Website and was interviewed in Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. Da eraction. Bracket
  • Q2. Earth eraction bracket eraction
  • Q3. Goyrod eraction
  • Q4. Bracket adjustment
  • Q5. Torlly chaking
  • Q6. Mast eraction
  • Q7. Acc wair
  • Q8. Conterwate

Interview Preparation Tips

Interview preparation tips for other job seekers - Da bracket goyrod counterwate erection

Highway Construction Co.pvt.ltd Interview FAQs

How many rounds are there in Highway Construction Co.pvt.ltd interview?
Highway Construction Co.pvt.ltd interview process usually has 1 rounds. The most common rounds in the Highway Construction Co.pvt.ltd interview process are Technical.
How to prepare for Highway Construction Co.pvt.ltd interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Highway Construction Co.pvt.ltd. The most common topics and skills that interviewers at Highway Construction Co.pvt.ltd expect are Hindi, Teaching English, Accounts Finalisation, Building Construction and Building Maintenance.
What are the top questions asked in Highway Construction Co.pvt.ltd interview?

Some of the top questions asked at the Highway Construction Co.pvt.ltd interview -

  1. Compare flexible pavements rigid pavement. Flexible pavement less castier....read more
  2. GSB It mixture aggregate and stone dust large size of grains 65mm to 75mm, GSB...read more
  3. Wmm on prime coat, it low viscous cut back bitumen on sub base surfaces area ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 740 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
KEC International Interview Questions
4.0
 • 297 Interviews
Tata Technologies Interview Questions
3.6
 • 257 Interviews
TCE Interview Questions
3.8
 • 247 Interviews
View all

Highway Construction Co.pvt.ltd Reviews and Ratings

based on 2 reviews

3.9/5

Rating in categories

1.9

Skill development

3.5

Work-life balance

2.5

Salary

3.5

Job security

2.4

Company culture

2.9

Promotions

3.4

Work satisfaction

Explore 2 Reviews and Ratings
Site Engineer
3 salaries
unlock blur

₹3.2 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Highway Construction Co.pvt.ltd with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview