I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.
I am changing jobs to seek new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Looking for a more fulfilling role
Wanting to work in a different environment or industry
Desire for better work-life balance
Wishing to relocate to a different city or country
RCC grade M25 is a concrete mix design ratio used in construction.
RCC stands for Reinforced Cement Concrete.
M25 is the compressive strength of the concrete after 28 days of curing.
The mix design ratio for M25 is 1:1:2 (cement:sand:aggregate).
It is commonly used in the construction of buildings, bridges, and other structures.
M25 grade concrete is suitable for moderate exposure conditions.
Yes, I know bbs making.
BBS stands for Bar Bending Schedule, which is a document that provides details of reinforcement steel bars required for construction.
BBS making involves preparing the schedule by calculating the required length, weight, and number of bars for each structural element.
It is an important task for ensuring the strength and durability of the structure.
BBS making requires knowledge of engineering drawi...
Yes, estimation is a crucial aspect of project management civil.
Estimation involves predicting the cost, time, and resources required for a project.
It is important to have accurate estimations to ensure the project stays within budget and on schedule.
Estimation techniques include top-down, bottom-up, and parametric estimation.
Factors such as project scope, complexity, and risk must be considered when making estimations...
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 22 Apr 2022
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
posted on 11 Jul 2022
I applied via Walk-in and was interviewed in Jan 2022. There were 3 interview rounds.
The percentage of coupler and rebar lapping varies depending on the project specifications and design requirements.
The percentage of coupler and rebar lapping is determined by the engineer or designer based on the project specifications.
The percentage can range from 25% to 100% depending on the design requirements.
Coupler lapping is typically used in situations where the rebar cannot be overlapped due to space constrai...
posted on 31 Dec 2022
I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.
posted on 5 Jan 2025
posted on 30 May 2022
I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.
The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.
Ensuring safety measures are in place at the worksite
Conducting safety inspections to identify potential hazards
Providing safety training to workers and management
Maintaining records of safety inspections and incidents
Ensuring compliance with safe...
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jan 2022. There were 2 interview rounds.
posted on 8 Apr 2024
I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.
Civil Site Engineer
16
salaries
| ₹2.9 L/yr - ₹5.8 L/yr |
Civil Engineer
13
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Site Engineer
7
salaries
| ₹2 L/yr - ₹7 L/yr |
Senior Engineer
6
salaries
| ₹6.8 L/yr - ₹11.4 L/yr |
Senior Legal Officer
6
salaries
| ₹9 L/yr - ₹18 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon