user image Anonymous

posted on 26 Sep 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Cement ka grade
  • Q2. Cancrete M20 retio
  • Q3. What is tha water cement ratio
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • Water cement ratio affects the strength and durability of concrete.

    • Lower water cement ratio results in stronger concrete but may be difficult to work with.

    • Typical water cement ratio ranges from 0.4 to 0.6 for normal strength concrete.

    • Excess water can lead to lower strength and durability of concrete.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's complete my process job
Request company

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 29 Nov 2020

I applied via Naukri.com and was interviewed in Nov 2021. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. About yourself and why you join our organisation?
  • Q2. About Tunnel and your specific field
  • Q3. How to working inTunnel
  • Ans. 

    Working in a tunnel involves various tasks such as planning, excavation, ventilation, and safety measures.

    • Planning and designing the tunnel layout

    • Excavating the tunnel using appropriate methods and equipment

    • Ensuring proper ventilation to maintain air quality

    • Implementing safety measures to prevent accidents

    • Monitoring and maintaining the tunnel's structural integrity

    • Coordinating with other professionals involved in the p...

  • Answered by AI
  • Q4. Specifications of IS Code
  • Ans. 

    IS Code refers to Indian Standards Code, which are specifications and guidelines for various engineering practices in India.

    • IS Code stands for Indian Standards Code.

    • It is a set of specifications and guidelines for various engineering practices in India.

    • IS Codes cover a wide range of topics such as construction materials, design criteria, testing methods, safety standards, etc.

    • These codes are developed and maintained by...

  • Answered by AI
  • Q5. SALARY DISCUSSION

Site Engineer Interview Questions Asked at Other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What a term of Rolling margin on a steel?
Q3. Which type of pipe Line and it's standards following
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Precommissioning test of transformers
  • Ans. 

    Precommissioning tests of transformers ensure proper functioning and safety before energizing.

    • Visual inspection of transformer and its components

    • Measurement of insulation resistance

    • Measurement of winding resistance

    • Verification of transformer ratio and polarity

    • Verification of oil level and quality

    • Testing of protective devices

    • Verification of grounding

    • Functional testing of cooling system

    • Verification of nameplate data

  • Answered by AI
  • Q2. 11kv & 33kv overhead power line distribution
  • Ans. 

    11kv & 33kv overhead power line distribution

    • 11kv and 33kv are common voltage levels for overhead power lines

    • Overhead power lines are used to distribute electricity from power stations to consumers

    • The voltage level determines the distance the power can be transmitted and the size of the conductors needed

    • Proper insulation and grounding is important for safety

    • Maintenance and inspection of the lines is necessary to ensure

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - this interview was based on electrical basic concepts for practical site works.

Interview Questionnaire 

1 Question

  • Q1.  Floor Tile thickness, types of tile, company of tile,

Interview Questionnaire 

1 Question

  • Q1. Site related

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What a term of Rolling margin on a steel?
  • Ans. Rolling margin is a difference weight of steel actual weight and theoretical weight.
  • Answered by Arvind Devrani
  • Q2. Initial setting time of cement
  • Ans. 

    Initial setting time of cement is the time taken by cement to harden and attain a particular strength.

    • Initial setting time is determined by Vicat apparatus

    • It is the time taken for the cement to lose its plasticity and become hard

    • The standard initial setting time for ordinary Portland cement is 30 minutes

    • Factors affecting initial setting time include temperature, water-cement ratio, and type of cement

  • Answered by AI
  • Q3. Elongation % of steel fy 500
  • Ans. 

    The elongation % of steel fy 500 is approximately 12%.

    • Elongation % is the measure of ductility of a material.

    • It is the percentage increase in length of a material before it fractures under tension.

    • For steel fy 500, the elongation % is approximately 12%.

    • This means that the steel can stretch up to 12% of its original length before it breaks.

  • Answered by AI
  • Q4. How much bag of cement in 1 cubic meter
  • Ans. 

    The amount of cement required for 1 cubic meter varies depending on the concrete mix design.

    • The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.

    • The mix design specifies the ratio of cement to other materials like sand and aggregates.

    • For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.

    • It is important to accurately calculate ...

  • Answered by AI
  • Q5. How much density of material Steel Concrete Sand
  • Ans. 

    Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3

    • Density of steel is higher than that of concrete and sand

    • Density of concrete varies depending on the mix design

    • Density of sand can vary depending on the source and moisture content

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically sound interview, like sagging hogging loads moment shear, all about steel, concrete and formwork such as qty calculation and fixing procedures.

Interview Questionnaire 

1 Question

  • Q1. How many techniques you often use to do your work?

Interview Preparation Tips

Interview preparation tips for other job seekers - Dedicated time on work will helps you to gain pure knowledge, which is remember for life time and helps to gain confidence to do that work perfectly. This confidence reflect by your voice and face, which is recognised by interviewer.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. What is the density of RCC structure
  • Ans. 

    The density of RCC structure typically ranges from 2200 to 2500 kg/m^3.

    • Density of RCC is influenced by the type and proportion of materials used.

    • Common density range for RCC is 2200 to 2500 kg/m^3.

    • Higher density indicates stronger and more durable RCC structure.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Tell me about ur self in brief
  • Q2. Qualifications and working experience related questions
  • Q3. Problem solving questions
  • Q4. Conditional questions
  • Q5. About concrete grade

Interview Preparation Tips

Topics to prepare for Hindustan Construction Company Site Engineer interview:
  • Works relate
  • Execution
  • Concrete
  • Bbs
  • Billing
Interview preparation tips for other job seekers - If u r experienced person then gain deep knowledge related to ur field and which are your previous working experience u have.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of concrete cube
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

    • Standard size for concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes may be used for specific projects or requirements

  • Answered by AI
  • Q2. 150mm*150mm*150mm

HCC Infrastructure Interview FAQs

How many rounds are there in HCC Infrastructure Site Engineer interview?
HCC Infrastructure interview process usually has 2 rounds. The most common rounds in the HCC Infrastructure interview process are Resume Shortlist and Technical.
What are the top questions asked in HCC Infrastructure Site Engineer interview?

Some of the top questions asked at the HCC Infrastructure Site Engineer interview -

  1. What is tha water cement ra...read more
  2. How to working inTun...read more
  3. Specifications of IS C...read more

Tell us how to improve this page.

HCC Infrastructure Site Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
HCC Infrastructure Site Engineer Salary
based on 7 salaries
₹2 L/yr - ₹7 L/yr
17% more than the average Site Engineer Salary in India
View more details

HCC Infrastructure Site Engineer Reviews and Ratings

based on 5 reviews

3.8/5

Rating in categories

3.9

Skill development

3.9

Work-life balance

3.3

Salary

3.6

Job security

3.2

Company culture

2.6

Promotions

3.2

Work satisfaction

Explore 5 Reviews and Ratings
Civil Site Engineer
16 salaries
unlock blur

₹2.9 L/yr - ₹5.8 L/yr

Civil Engineer
13 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Site Engineer
7 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Senior Engineer
6 salaries
unlock blur

₹6.8 L/yr - ₹11.4 L/yr

Senior Legal Officer
6 salaries
unlock blur

₹9 L/yr - ₹18 L/yr

Explore more salaries
Compare HCC Infrastructure with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview