I applied via Job Portal and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Minimum cement contains in RCC structure
  • Ans. 

    The minimum cement content in RCC structure is typically around 300 kg/m3.

    • Minimum cement content is usually specified by structural engineers based on design requirements.

    • Higher cement content may be required for structures in aggressive environments or with special design considerations.

    • The minimum cement content is important for achieving the desired strength and durability of the concrete mix.

  • Answered by AI
  • Q2. In slump cone test what is the shape of slump
  • Ans. 

    The shape of slump in a slump cone test is typically conical.

    • The shape of slump is conical, with the top being wider than the base.

    • The height of the slump is measured to determine the workability of the concrete.

    • Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability.

    • Example: A true slump has a smooth, symmetrical shape with a slight collapse at the center.

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Lapping zone of column
  • Ans. 

    Lapping zone of column is where two reinforcement bars overlap to ensure continuity of load transfer.

    • Lapping zone should be at least 50 times the diameter of the smaller bar away from the face of the support.

    • Proper lapping length is crucial for structural integrity and load distribution.

    • Lapping should be staggered in multiple layers for better strength.

    • Ensure proper cover and clear spacing around the lapping zone to pr

  • Answered by AI

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Site related

Interview Questionnaire 

1 Question

  • Q1.  Floor Tile thickness, types of tile, company of tile,

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Precommissioning test of transformers
  • Ans. 

    Precommissioning tests of transformers ensure proper functioning and safety before energizing.

    • Visual inspection of transformer and its components

    • Measurement of insulation resistance

    • Measurement of winding resistance

    • Verification of transformer ratio and polarity

    • Verification of oil level and quality

    • Testing of protective devices

    • Verification of grounding

    • Functional testing of cooling system

    • Verification of nameplate data

  • Answered by AI
  • Q2. 11kv & 33kv overhead power line distribution
  • Ans. 

    11kv & 33kv overhead power line distribution

    • 11kv and 33kv are common voltage levels for overhead power lines

    • Overhead power lines are used to distribute electricity from power stations to consumers

    • The voltage level determines the distance the power can be transmitted and the size of the conductors needed

    • Proper insulation and grounding is important for safety

    • Maintenance and inspection of the lines is necessary to ensure

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - this interview was based on electrical basic concepts for practical site works.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of concrete cube
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

    • Standard size for concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes may be used for specific projects or requirements

  • Answered by AI
  • Q2. 150mm*150mm*150mm

I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. 32 dia 1 meter weight how much?

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic questions and previous company project details must
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. They are asking about my work and previous work please and company including salary and benifits
Round 3 - Technical 

(2 Questions)

  • Q1. Asking about building structure work related questions and about my planing for smooth working on site,with coordination between contractor and company pmc or cleint
  • Q2. About quality quantity and site work

Interview Preparation Tips

Interview preparation tips for other job seekers - All prepared about your relevant sector interview with honesty

I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is slump test Curing of method
  • Ans. 

    Slump test is a measure of the consistency of fresh concrete.

    • It is used to determine the workability of concrete.

    • The test involves filling a standard cone-shaped container with concrete and then removing the cone to see how much the concrete slumps or settles.

    • The amount of slump is measured in millimeters and indicates the wetness or dryness of the concrete.

    • Curing is the process of maintaining moisture in the concrete ...

  • Answered by AI
  • Q2. Cube test Direct Sher Test Plete lod test CBRTest

Interview Preparation Tips

Interview preparation tips for other job seekers - Manjil aur taqdeer khud hi bnani padti hai
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. What is the density of RCC structure
  • Ans. 

    The density of RCC structure typically ranges from 2200 to 2500 kg/m^3.

    • Density of RCC is influenced by the type and proportion of materials used.

    • Common density range for RCC is 2200 to 2500 kg/m^3.

    • Higher density indicates stronger and more durable RCC structure.

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. How many techniques you often use to do your work?

Interview Preparation Tips

Interview preparation tips for other job seekers - Dedicated time on work will helps you to gain pure knowledge, which is remember for life time and helps to gain confidence to do that work perfectly. This confidence reflect by your voice and face, which is recognised by interviewer.

HCC Infrastructure Interview FAQs

How many rounds are there in HCC Infrastructure Civil Site Engineer interview?
HCC Infrastructure interview process usually has 3 rounds. The most common rounds in the HCC Infrastructure interview process are Technical and Resume Shortlist.
What are the top questions asked in HCC Infrastructure Civil Site Engineer interview?

Some of the top questions asked at the HCC Infrastructure Civil Site Engineer interview -

  1. In slump cone test what is the shape of sl...read more
  2. Minimum cement contains in RCC struct...read more
  3. Lapping zone of col...read more

Tell us how to improve this page.

HCC Infrastructure Civil Site Engineer Interview Process

based on 5 interviews

Interview experience

3
  
Average
View more
HCC Infrastructure Civil Site Engineer Salary
based on 16 salaries
₹2.9 L/yr - ₹5.8 L/yr
16% more than the average Civil Site Engineer Salary in India
View more details

HCC Infrastructure Civil Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
16 salaries
unlock blur

₹2.9 L/yr - ₹5.8 L/yr

Civil Engineer
13 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Site Engineer
7 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Senior Engineer
6 salaries
unlock blur

₹6.8 L/yr - ₹11.4 L/yr

Senior Legal Officer
6 salaries
unlock blur

₹9 L/yr - ₹18 L/yr

Explore more salaries
Compare HCC Infrastructure with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview