i
Havelock One Interiors
Filter interviews by
I applied via Company Website and was interviewed before Jun 2023. There was 1 interview round.
Top trending discussions
posted on 26 Oct 2024
I applied via campus placement at SRM Institute of Science & Technology, Chennai and was interviewed in Sep 2024. There was 1 interview round.
Starters are devices used to start and control the speed of induction motors.
Direct On-Line (DOL) starter: provides full voltage to the motor at start
Star-Delta starter: reduces the starting current by initially connecting the motor in star configuration
Auto-transformer starter: uses an auto-transformer to reduce the voltage during starting
Soft starter: gradually increases the voltage to the motor to reduce starting cu...
Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.
Types of earthing include plate earthing, pipe earthing, rod earthing, and strip earthing.
Methods of earthing include neutral earthing, equipment earthing, and system earthing.
Earthing is essential for safety in electrical systems to prevent electric shock and damage to equipment.
Proper earthing ensure...
TF stands for Transformer. It is a static device used to transfer electrical energy between two or more circuits through electromagnetic induction.
Principle of TF involves Faraday's law of electromagnetic induction.
Types of TF include step-up, step-down, isolation, auto-transformer, etc.
TFs are used in power distribution, voltage regulation, impedance matching, etc.
The starting current of a DOL starter is typically 6-8 times the rated current of the motor.
The Direct-On-Line (DOL) starter is used to start induction motors.
The starting current of a DOL starter is usually 6-8 times the rated current of the motor.
This high starting current can cause voltage drops and stress on the electrical system.
Choose AC cables based on current rating, insulation material, and environmental conditions.
Consider the current rating of the cable to ensure it can handle the load
Choose the appropriate insulation material based on the application and environment
Take into account environmental conditions such as temperature, moisture, and exposure to chemicals
Select the right cable size to minimize voltage drop and power loss
Ensure c...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 2 Aug 2024
I applied via Company Website
The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.
Company has a strong financial position
Ongoing projects are in progress
Company has a good reputation in the industry
Employee growth refers to the development and advancement of an individual within their career.
Employee growth involves acquiring new skills and knowledge
It includes taking on more responsibilities and challenges
Career progression and promotions are indicators of employee growth
Action points at site level refer to specific tasks or activities that need to be completed on the construction site.
Action points are typically identified during site inspections or progress meetings.
They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.
Examples of action points could be revising drawings to address conflicts, obtaining necess...
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
I applied via Referral and was interviewed in Jul 2024. There were 3 interview rounds.
Purchase Assignment - Comparing PO's
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
posted on 14 Nov 2024
I applied via Campus Placement and was interviewed in Oct 2024. There was 1 interview round.
I applied via campus placement at Veermata Jijabai Technological Institute (VJTI), Mumbai and was interviewed in Apr 2024. There was 1 interview round.
I am from a small town in the Midwest and I am passionate about environmental conservation.
I grew up in a close-knit community in the Midwest
I have always been interested in protecting the environment
I enjoy outdoor activities like hiking and gardening
I have a Bachelor's degree in Computer Science from XYZ University.
Bachelor's degree in Computer Science
Graduated from XYZ University
Specialized in software development
based on 25 reviews
Rating in categories
Project Engineer
6
salaries
| ₹6.2 L/yr - ₹23 L/yr |
Estimator
5
salaries
| ₹10 L/yr - ₹15 L/yr |
Software Developer
4
salaries
| ₹9.6 L/yr - ₹11 L/yr |
Production Planner
4
salaries
| ₹15 L/yr - ₹18 L/yr |
HR Generalist
4
salaries
| ₹6.8 L/yr - ₹7.2 L/yr |
DesignCafe
LivSpace
Sobha
Godrej Interio