i
Burohappold Engineering
Filter interviews by
I applied via campus placement at SRM Institute of Science & Technology, Chennai and was interviewed in Sep 2024. There was 1 interview round.
Starters are devices used to start and control the speed of induction motors.
Direct On-Line (DOL) starter: provides full voltage to the motor at start
Star-Delta starter: reduces the starting current by initially connecting the motor in star configuration
Auto-transformer starter: uses an auto-transformer to reduce the voltage during starting
Soft starter: gradually increases the voltage to the motor to reduce starting cu...
Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.
Types of earthing include plate earthing, pipe earthing, rod earthing, and strip earthing.
Methods of earthing include neutral earthing, equipment earthing, and system earthing.
Earthing is essential for safety in electrical systems to prevent electric shock and damage to equipment.
Proper earthing ensure...
TF stands for Transformer. It is a static device used to transfer electrical energy between two or more circuits through electromagnetic induction.
Principle of TF involves Faraday's law of electromagnetic induction.
Types of TF include step-up, step-down, isolation, auto-transformer, etc.
TFs are used in power distribution, voltage regulation, impedance matching, etc.
The starting current of a DOL starter is typically 6-8 times the rated current of the motor.
The Direct-On-Line (DOL) starter is used to start induction motors.
The starting current of a DOL starter is usually 6-8 times the rated current of the motor.
This high starting current can cause voltage drops and stress on the electrical system.
Choose AC cables based on current rating, insulation material, and environmental conditions.
Consider the current rating of the cable to ensure it can handle the load
Choose the appropriate insulation material based on the application and environment
Take into account environmental conditions such as temperature, moisture, and exposure to chemicals
Select the right cable size to minimize voltage drop and power loss
Ensure c...
Primary Variable pumping system uses a variable speed pump to control flow rate based on the demand of the system.
Variable speed pump adjusts flow rate based on system demand
Flow rate is controlled by changing pump speed
Pressure sensors or flow meters provide feedback to the pump controller
Efficient and energy-saving system compared to constant speed pumps
Space planning involves organizing and arranging interior spaces to optimize functionality and efficiency.
Start by analyzing the space requirements and constraints
Consider the purpose of the space and the activities that will take place
Create a layout that maximizes flow and usability
Take into account factors such as furniture placement, lighting, and circulation
Use tools like floor plans, sketches, and 3D models to vi...
I use software like Carrier HAP, EnergyPlus, or Trace for heat load calculations.
Carrier HAP is commonly used for commercial HVAC systems
EnergyPlus is a powerful simulation tool for energy modeling
Trace is known for its user-friendly interface and accurate results
DOAS system stands for Differential Optical Absorption Spectroscopy system used for monitoring air quality.
DOAS system is a remote sensing technique used to measure concentrations of trace gases in the atmosphere.
It works by analyzing the absorption of sunlight by gases in the atmosphere.
DOAS systems are commonly used for monitoring air quality, studying pollution sources, and measuring greenhouse gas concentrations.
Ex...
Uniformity factor is the ratio of the minimum illuminance to the average illuminance on a surface. Maintenance factor is the ratio of the illuminance after a period of time to the initial illuminance.
Uniformity factor is important in lighting design to ensure consistent lighting levels across a space.
A higher uniformity factor indicates more even lighting distribution.
Maintenance factor accounts for factors like dirt a...
I applied via Walk-in and was interviewed before Dec 2022. There were 3 interview rounds.
Electrical lightning protection design codes and standards are guidelines that ensure the safety and effectiveness of lightning protection systems.
National Fire Protection Association (NFPA) 780 is a widely recognized standard for lightning protection design.
International Electrotechnical Commission (IEC) 62305 is another commonly used standard for lightning protection.
These codes and standards provide guidelines for t...
Electrical earthing design is a crucial aspect of electrical engineering that ensures safety and proper functioning of electrical systems.
Electrical earthing design involves creating a low-resistance path for electrical current to flow into the ground.
It helps prevent electric shock, protects equipment from damage, and ensures proper functioning of protective devices like circuit breakers.
Different types of earthing sy...
Burohappold Engineering interview questions for popular designations
I applied via Referral and was interviewed in Jul 2023. There were 3 interview rounds.
It was tool test for software and it was very easy
Get interview-ready with Top Burohappold Engineering Interview Questions
I applied via Referral and was interviewed before Jun 2023. There were 3 interview rounds.
Basic SFD BMD, Design questions
Designing a retaining wall involves analyzing the soil conditions, determining the load it will bear, selecting appropriate materials, and ensuring proper drainage.
Consider soil type and slope of the land
Calculate the load the wall will bear
Select appropriate materials such as concrete, stone, or timber
Ensure proper drainage to prevent water buildup
Include reinforcement like steel bars if needed
P-delta analysis is a second-order analysis method used in structural engineering to account for the effects of axial loads on the overall stability of a structure.
P-delta analysis considers the interaction between the applied loads and the deformed shape of the structure.
It is used to assess the stability of tall or slender structures, where the effects of second-order forces become significant.
P-delta effects can lea...
I applied via LinkedIn and was interviewed before Apr 2023. There were 3 interview rounds.
I applied via Referral and was interviewed in Jan 2022. There were 2 interview rounds.
PT design refers to pre-tensioned concrete design. It has its own set of advantages and disadvantages.
Pros: higher strength and durability, reduced cracking, longer lifespan, better resistance to environmental factors
Cons: higher initial cost, more complex construction process, limited flexibility for future modifications
Example: PT design is commonly used in bridges and high-rise buildings where strength and durabilit...
I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
Green Building policies vary across the country.
Many states and cities have their own green building codes and standards.
Some states, like California, have mandatory green building requirements for new construction.
The federal government also has green building policies for its own buildings and projects.
LEED certification is a widely recognized standard for green building.
Green building policies often focus on energy ...
KPIs for campus master planning include enrollment projections, space utilization, sustainability goals, and budget adherence.
Enrollment projections to ensure adequate space and resources are available
Space utilization to optimize usage and minimize waste
Sustainability goals to promote environmentally responsible planning
Budget adherence to ensure financial feasibility
Examples of KPIs include percentage of space utiliz...
Top trending discussions
posted on 20 Mar 2022
I applied via Company Website and was interviewed in Feb 2022. There were 4 interview rounds.
based on 10 interviews
Interview experience
based on 50 reviews
Rating in categories
Electrical Engineer
19
salaries
| ₹5 L/yr - ₹7.1 L/yr |
Structural Engineer
16
salaries
| ₹4.9 L/yr - ₹7 L/yr |
Structural Design Engineer
15
salaries
| ₹4.5 L/yr - ₹8.5 L/yr |
Electrical Design Engineer
11
salaries
| ₹5.2 L/yr - ₹8.5 L/yr |
Mechanical Engineer
9
salaries
| ₹5.3 L/yr - ₹6.5 L/yr |
Arup
AECOM
WSP
Ramboll