I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
Green Building policies vary across the country.
Many states and cities have their own green building codes and standards.
Some states, like California, have mandatory green building requirements for new construction.
The federal government also has green building policies for its own buildings and projects.
LEED certification is a widely recognized standard for green building.
Green building policies often focus on energy ...
KPIs for campus master planning include enrollment projections, space utilization, sustainability goals, and budget adherence.
Enrollment projections to ensure adequate space and resources are available
Space utilization to optimize usage and minimize waste
Sustainability goals to promote environmentally responsible planning
Budget adherence to ensure financial feasibility
Examples of KPIs include percentage of space utiliz...
Top trending discussions
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
I applied via Job Fair and was interviewed in Apr 2022. There were 3 interview rounds.
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
I applied via Approached by Company and was interviewed before Mar 2022. There were 3 interview rounds.
It depends on the region, for me they conducted tool test in the 1st round.
I was interviewed in May 2023.
I applied via LinkedIn and was interviewed before Apr 2023. There was 1 interview round.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
based on 1 interview
Interview experience
Electrical Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Design Engineer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Design Engineer
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Arup
AECOM
WSP
Ramboll