Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Burohappold Engineering Team. If you also belong to the team, you can get access from here

Burohappold Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Burohappold Engineering Associate Engineer Interview Questions, Process, and Tips

Updated 26 Aug 2023

Burohappold Engineering Associate Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - Technical 

(4 Questions)

  • Q1. How Primary Variable pumping system works?
  • Ans. 

    Primary Variable pumping system uses a variable speed pump to control flow rate based on the demand of the system.

    • Variable speed pump adjusts flow rate based on system demand

    • Flow rate is controlled by changing pump speed

    • Pressure sensors or flow meters provide feedback to the pump controller

    • Efficient and energy-saving system compared to constant speed pumps

  • Answered by AI
  • Q2. How you do space planning?
  • Ans. 

    Space planning involves organizing and arranging interior spaces to optimize functionality and efficiency.

    • Start by analyzing the space requirements and constraints

    • Consider the purpose of the space and the activities that will take place

    • Create a layout that maximizes flow and usability

    • Take into account factors such as furniture placement, lighting, and circulation

    • Use tools like floor plans, sketches, and 3D models to vi...

  • Answered by AI
  • Q3. Which software you use for heat load?
  • Ans. 

    I use software like Carrier HAP, EnergyPlus, or Trace for heat load calculations.

    • Carrier HAP is commonly used for commercial HVAC systems

    • EnergyPlus is a powerful simulation tool for energy modeling

    • Trace is known for its user-friendly interface and accurate results

  • Answered by AI
  • Q4. What is DOAS system?
  • Ans. 

    DOAS system stands for Differential Optical Absorption Spectroscopy system used for monitoring air quality.

    • DOAS system is a remote sensing technique used to measure concentrations of trace gases in the atmosphere.

    • It works by analyzing the absorption of sunlight by gases in the atmosphere.

    • DOAS systems are commonly used for monitoring air quality, studying pollution sources, and measuring greenhouse gas concentrations.

    • Ex...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary expectations

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Previous project worked and techical details aout the project
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Aptitude Test 

Technical plus general knowledge appti

Round 2 - Technical 

(1 Question)

  • Q1. OOPS concepts and .net questions
Round 3 - HR 

(1 Question)

  • Q1. Salary Discussion and Company culture

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with basics OOPs concepts And aptitude test

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
No response
Round 1 - Technical 

(5 Questions)

  • Q1. About current projects. And more about seismic/ wind loads
  • Q2. How to perform RSM method ?
  • Ans. 

    Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.

    • Design a set of experiments based on a factorial design

    • Collect data from the experiments

    • Fit a regression model to the data

    • Analyze the model to determine optimal input settings for the response variable

  • Answered by AI
  • Q3. Soil test report
  • Q4. Foundation uplift
  • Q5. Connection design
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in May 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. HVAC, FLS & Experience
Round 3 - Technical 

(1 Question)

  • Q1. Software Proficiency Test
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Whate are different bus bar schemes?
  • Ans. 

    Bus bar schemes are different ways of connecting bus bars in power systems.

    • Single bus bar scheme

    • Double bus bar scheme

    • Main and transfer bus bar scheme

    • Ring bus bar scheme

    • Breaker and a half scheme

    • Mesh bus bar scheme

  • Answered by AI
  • Q2. What are the equipment sequence for any line bay?
  • Ans. 

    The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.

    • The circuit breaker is the first equipment in the sequence.

    • Next comes the isolator switch.

    • After that, the earth switch is operated.

    • Then the line disconnector is opened.

    • Finally, the transformer is disconnected from the line.

    • The sequence is reversed when the line bay is put back into service.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What you want to leave your current organization?
  • Q2. Are you comfortable to relocate to another city?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be prepare about possible questions and be confident while giving interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. About your self. About casting yard. About Methodology of casting of different structures. About site progress planning and time cycle of progress. This process is for 30-40 minutes.
Round 3 - HR 

(1 Question)

  • Q1. Details of my Education and experience. Salary negotiation and finalization of joining.

Interview Preparation Tips

Topics to prepare for AECOM Senior Engineer interview:
  • Civil Construction
  • IS Code
  • Your expertise area
Interview preparation tips for other job seekers - Prepare before going to attend an interview on all subject not only in your expertise area.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Achievements, Experience, Projects Handled
  • Q2. Project work executed in last few years
  • Ans. 

    I have executed multiple projects in the last few years.

    • Developed a new website for a client using HTML, CSS, and JavaScript.

    • Created a mobile application for a startup using React Native.

    • Managed a team of developers to build a custom CRM system for a large corporation.

    • Implemented a data analytics solution for a healthcare organization using Python and SQL.

    • Designed and executed a social media marketing campaign for a no

  • Answered by AI
Contribute & help others!
anonymous
You can choose to be anonymous

Burohappold Engineering Interview FAQs

How many rounds are there in Burohappold Engineering Associate Engineer interview?
Burohappold Engineering interview process usually has 3 rounds. The most common rounds in the Burohappold Engineering interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Burohappold Engineering Associate Engineer interview?

Some of the top questions asked at the Burohappold Engineering Associate Engineer interview -

  1. How Primary Variable pumping system wor...read more
  2. Which software you use for heat lo...read more
  3. How you do space planni...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

INTERVIEWS

Burohappold Engineering

No Interviews

INTERVIEWS

Karur Vysya Bank

No Interviews

INTERVIEWS

Decimal Technologies

No Interviews

INTERVIEWS

Food Corporation of India

No Interviews

INTERVIEWS

Zopsmart Technology

No Interviews

SALARIES

Bombardier Transportation

INTERVIEWS

Food Corporation of India

No Interviews

INTERVIEWS

Food Corporation of India

5.6k top interview questions

Tell us how to improve this page.

Burohappold Engineering Associate Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 114 Interviews
WSP Interview Questions
4.2
 • 89 Interviews
Mott MacDonald Interview Questions
4.2
 • 43 Interviews
Ramboll Interview Questions
4.2
 • 37 Interviews
Eversendai Interview Questions
3.7
 • 28 Interviews
Stantec Interview Questions
3.8
 • 22 Interviews
View all

Burohappold Engineering Associate Engineer Reviews and Ratings

based on 2 reviews

3.0/5

Rating in categories

3.0

Skill development

2.0

Work-life balance

3.0

Salary

1.0

Job security

1.0

Company culture

2.5

Promotions

2.0

Work satisfaction

Explore 2 Reviews and Ratings
Electrical Engineer
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Engineer
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Design Engineer
15 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Design Engineer
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Burohappold Engineering with

Arup

3.8
Compare

AECOM

4.2
Compare

WSP

4.2
Compare

Ramboll

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent