i
H.G. Infra Engineering
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
posted on 4 Nov 2020
I have extensive experience with DGPS technology.
I have used DGPS to accurately measure and map large areas of land.
I am familiar with the different types of DGPS equipment and software.
I have experience troubleshooting and resolving issues with DGPS systems.
I have used DGPS in various industries, including construction and mining.
I am knowledgeable about the limitations and potential errors of DGPS technology.
Top trending discussions
posted on 4 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
posted on 12 May 2024
I applied via Approached by Company
Yes, code is a mode of measurement used in quantity surveying.
Code is a standardized system of measurement used in quantity surveying to quantify and describe construction works.
It helps in accurately estimating the quantities of materials and labor required for a project.
Examples of codes used in quantity surveying include SMM7 (Standard Method of Measurement) and CESMM4 (Civil Engineering Standard Method of Measureme
I applied via Naukri.com and was interviewed before Nov 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There was 1 interview round.
posted on 22 Mar 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
posted on 27 Oct 2022
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
I am from New York and I have 10 years of experience as a Senior Surveyor.
I am originally from New York.
I have 10 years of experience as a Senior Surveyor.
I have worked on various projects across the state.
I am familiar with the local regulations and requirements.
I have successfully completed complex surveys in urban and rural areas.
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Simple game style interview
Assistant Manager
117
salaries
| ₹4.2 L/yr - ₹12.2 L/yr |
Senior Engineer
86
salaries
| ₹4.1 L/yr - ₹8.7 L/yr |
Assistant Engineer
74
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Engineer
64
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Structural Engineer
64
salaries
| ₹2.6 L/yr - ₹5.4 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
PNC Infratech