Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by H.G. Infra Engineering Team. If you also belong to the team, you can get access from here

H.G. Infra Engineering Verified Tick

Compare button icon Compare button icon Compare
4.2

based on 898 Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

H.G. Infra Engineering Track Surveyor and Land Surveyor Interview Questions and Answers

Updated 4 Nov 2020

H.G. Infra Engineering Track Surveyor and Land Surveyor Interview Experiences

1 interview found

Interview Questionnaire 

6 Questions

  • Q1. Surveyor 4experience
  • Q2. Surveyor DLC- PQC work experience
  • Q3. Ts ans ato level
  • Q4. Surveyor
  • Q5. Dgps experience
  • Ans. 

    I have extensive experience with DGPS technology.

    • I have used DGPS to accurately measure and map large areas of land.

    • I am familiar with the different types of DGPS equipment and software.

    • I have experience troubleshooting and resolving issues with DGPS systems.

    • I have used DGPS in various industries, including construction and mining.

    • I am knowledgeable about the limitations and potential errors of DGPS technology.

  • Answered by AI
  • Q6. Topo survey

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. What are your exact responsibility in your organization?
  • Q2. What are your additional qualities?
  • Q3. AutoCAD, Excel, Friendly with all types of docs , Even the Contract Documents also
  • Ans. Maintain good relationship with Clients on the basis of my performance.
  • Answered by Atul anand
Round 2 - Technical 

(6 Questions)

  • Q1. What are work procedure in your organization in RA Bill preparation ?
  • Ans. 

    The work procedure in our organization for RA Bill preparation involves several steps.

    • Gathering all relevant project documents and information

    • Analyzing the project scope and specifications

    • Measuring and quantifying the work done on-site

    • Preparing detailed rate analysis for each item of work

    • Calculating the quantities and rates for each item

    • Preparing the bill of quantities (BOQ)

    • Cross-checking the BOQ with the project speci...

  • Answered by AI
  • Q2. Explain about the different types of bills you know about.
  • Ans. 

    Different types of bills in quantity surveying

    • Measurement bill: It includes the detailed measurements of various items of work.

    • Abstract bill: It provides a summary of all the measurements and quantities of work done.

    • Cost bill: It includes the cost of each item of work and the total cost of the project.

    • Final bill: It is the final settlement bill after completion of the project.

    • Interim bill: It is prepared at regular int...

  • Answered by AI
  • Q3. Tell me about the importance of contact documents in any type of bill prepation.
  • Ans. 

    Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.

    • Contact documents define the legal agreement between the parties involved in a construction project.

    • They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.

    • Contact documents provide clarity...

  • Answered by AI
  • Q4. How reconciliation performed?
  • Ans. 

    Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.

    • Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.

    • The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.

    • Reconciliation can be performed manually or using softw...

  • Answered by AI
  • Q5. What are the client instructions in your current project about document controlling?
  • Ans. As according to client, we have prepare and submit all the prepour and postpour docs with all test certificate if any even in mechanical or civil works before submission of Monthly RA bill.
  • Answered by Atul anand
  • Q6. Do you know AutoCAD & Excel well ?
  • Ans. 

    Yes, I am proficient in AutoCAD and Excel.

    • I have extensive experience using AutoCAD for creating and editing technical drawings.

    • I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.

    • I have successfully completed projects where I utilized both AutoCAD and Excel.

    • I am familiar with the various features and functions of both software.

    • I can efficiently generate quantity take-offs and cost es

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updating yourself as according to Employer demands and market requirements and Always be honest to your interview that helps in your progress also.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About Basic Knowledge
  • Q2. What You Studies and about your experience
Round 2 - Technical 

(2 Questions)

  • Q1. Not specific Questions
  • Q2. Depend upon your knowledge and experience you must share with them

Interview Preparation Tips

Interview preparation tips for other job seekers - You need strong Basics if you are fresher and If you are experiance person then it's cherry on top
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About experience, current salary, expected salary and notice period
Round 2 - Technical 

(1 Question)

  • Q1. About technical knowledge of current designation
Round 3 - One-on-one 

(1 Question)

  • Q1. About technical knowledge currently project

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go with extraordinary, reply to interviewer what you actually know
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(1 Question)

  • Q1. Is code for the mode of measurement?
  • Ans. 

    Yes, code is a mode of measurement used in quantity surveying.

    • Code is a standardized system of measurement used in quantity surveying to quantify and describe construction works.

    • It helps in accurately estimating the quantities of materials and labor required for a project.

    • Examples of codes used in quantity surveying include SMM7 (Standard Method of Measurement) and CESMM4 (Civil Engineering Standard Method of Measureme

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Salary discussiom
  • Q2. Notice period how much
Round 2 - Technical 

(1 Question)

  • Q1. Basic technical questions
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Route survey, Details survey etc.
  • Q2. Salary discussions

Interview Preparation Tips

Topics to prepare for L&T Construction Surveyor interview:
  • Field Survey
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical question related to my job profile
  • Q2. I answered well as per my knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Please mentioned your actual knowledge and experience in CV. Also mentioned correct CTC in CV.

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Telephonic interview by HR
  • Q2. Where are you from how much experience ?
  • Ans. 

    I am from New York and I have 10 years of experience as a Senior Surveyor.

    • I am originally from New York.

    • I have 10 years of experience as a Senior Surveyor.

    • I have worked on various projects across the state.

    • I am familiar with the local regulations and requirements.

    • I have successfully completed complex surveys in urban and rural areas.

  • Answered by AI
  • Q3. I'm from Jharkhand and experience was 7 years

Interview Preparation Tips

Topics to prepare for Simplex Infrastructures Senior Surveyor interview:
  • travesing
Interview preparation tips for other job seekers - Experience teach better join work and enjoy work for internship
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Simple game style interview

Round 2 - One-on-one 

(1 Question)

  • Q1. What made you apply for this junior qs role?

H.G. Infra Engineering Interview FAQs

What are the top questions asked in H.G. Infra Engineering Track Surveyor and Land Surveyor interview?

Some of the top questions asked at the H.G. Infra Engineering Track Surveyor and Land Surveyor interview -

  1. Dgps experie...read more
  2. Surveyor DLC- PQC work experie...read more
  3. Topo sur...read more

Tell us how to improve this page.

Assistant Manager
117 salaries
unlock blur

₹4.2 L/yr - ₹12.2 L/yr

Senior Engineer
86 salaries
unlock blur

₹4.1 L/yr - ₹8.7 L/yr

Assistant Engineer
74 salaries
unlock blur

₹2.4 L/yr - ₹4.5 L/yr

Engineer
64 salaries
unlock blur

₹2.5 L/yr - ₹7.5 L/yr

Structural Engineer
64 salaries
unlock blur

₹2.6 L/yr - ₹5.4 L/yr

Explore more salaries
Compare H.G. Infra Engineering with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview