I applied via Walk-in and was interviewed before Aug 2023. There were 5 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Grade of steel used in construction
  • Ans. 

    Grade of steel used in construction varies based on the specific requirements of the project, with common grades including A36, A572, and A588.

    • Grade of steel used in construction depends on factors such as strength, corrosion resistance, and weldability.

    • Common grades of steel used in construction include A36, A572, and A588.

    • Higher grade steels like A572 and A588 are often used for structural components in buildings and...

  • Answered by AI
  • Q2. Concrete proportions
Round 2 - Technical 

(2 Questions)

  • Q1. Important of Curring in construction
  • Ans. 

    Curing in construction is essential for ensuring the strength and durability of concrete structures.

    • Curing helps in maintaining the moisture content in concrete, allowing it to properly hydrate and gain strength.

    • Proper curing reduces the risk of cracking and increases the longevity of the structure.

    • Common curing methods include water curing, membrane curing, and curing compounds.

    • Examples of curing techniques include co...

  • Answered by AI
  • Q2. Formwork load weight
Round 3 - Technical 

(2 Questions)

  • Q1. Safe bearing capacity of soil
  • Ans. 

    Safe bearing capacity of soil refers to the maximum pressure that can be applied to the soil without risking shear failure.

    • Safe bearing capacity is determined by conducting soil tests such as standard penetration tests or cone penetration tests.

    • Factors affecting safe bearing capacity include soil type, moisture content, and depth of the soil.

    • It is important to consider the safe bearing capacity when designing foundatio...

  • Answered by AI
  • Q2. Cube test of concrete
  • Ans. 

    Cube test of concrete is a method to determine the compressive strength of concrete by casting cubes and testing them after a specified curing period.

    • Cube test involves casting concrete cubes of standard size and curing them under specified conditions.

    • After the curing period, the cubes are tested in a compression testing machine to determine their compressive strength.

    • The compressive strength of concrete is an importan...

  • Answered by AI
Round 4 - HR 

(2 Questions)

  • Q1. Experience as civil engineer
  • Ans. 

    I have over 10 years of experience as a civil engineer working on various projects including infrastructure development and construction management.

    • Managed multiple construction projects from planning to completion

    • Designed and implemented structural engineering solutions

    • Collaborated with architects, contractors, and government agencies

    • Ensured compliance with building codes and regulations

    • Performed site inspections and ...

  • Answered by AI
  • Q2. Salary/accommodation/ transportation/ medical
Round 5 - Assignment 

Project lesson learn

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is the total experience
  • Q2. Your current CTC
Round 2 - Technical 

(2 Questions)

  • Q1. How much type of project
  • Q2. What was the memorable work
Round 3 - One-on-one 

(2 Questions)

  • Q1. Your Designation in this company
  • Q2. What is the look after
Round 4 - HR 

(2 Questions)

  • Q1. Your Notice period
  • Q2. Your expected salary

Interview Preparation Tips

Interview preparation tips for other job seekers - We have work on target base so that All work should be complete in time frame
And all Documents work should be complete according to work, otherwise your hard work is in vain.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Ans. 

    To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.

    • Identify the root causes of the delays and address them promptly.

    • Implement project management tools and techniques to streamline processes and improve productivity.

    • Optimize resource allocation to ensure maximum utilization and minimize idle time.

    • Negotiate with suppliers and vendors for better pricing o...

  • Answered by AI
  • Q3. How much ur carpent area and buildup area
  • Ans. 

    The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is the actual area where you can lay a carpet.

    • Built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is usually around 70-80% of the built-up area.

    • For example, if the built-up area is 1000 square feet, the carpet area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Detail process of building survey
  • Ans. 

    The process of building survey involves several steps to assess the condition and suitability of a building.

    • Determine the purpose of the survey and the scope of work

    • Conduct a visual inspection of the building's exterior and interior

    • Identify any structural issues, such as cracks or signs of deterioration

    • Assess the building's systems, including electrical, plumbing, and HVAC

    • Evaluate the building's compliance with buildin...

  • Answered by AI
  • Q2. What is development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.

    • The development length can vary depending on the ...

  • Answered by AI
  • Q3. What about you know waterproofing of toilet area
  • Ans. 

    Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.

    • Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.

    • It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.

    • Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.

    • Pr...

  • Answered by AI
  • Q4. Circumstances of handing over flat to Clint
  • Ans. 

    The circumstances of handing over the flat to Clint

    • The flat was handed over to Clint after completing all necessary paperwork

    • The condition of the flat was documented before handing it over to Clint

    • Keys and access cards were provided to Clint

    • Any outstanding payments or dues were settled before the handover

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Work related for technical questions
  • Q2. Growth the achievement
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Self introduction and roles and responsibilities of the previous company
  • Q2. Question related to safety and quality
Round 3 - HR 

(2 Questions)

  • Q1. Salary negotiation with respect to previous salary
  • Q2. Benefits and facilities provided by the company
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Introduce yourself? This This question is just make you comfortable to boost your confidence because you surely know the answer.?
  • Ans. Prepare your introduction and speak. Ensure that your speak naturally - touch upon your education, family, academic & experience. Keep some thread which will generate another related questions & if successful then gobwith flow
  • Answered Anonymously
  • Q2. Why do you want to change?
  • Ans. Multiple answers.. Stagnant, better remuneration, better position, change of location... and many.. see what suits you. Try to avoid talking against any current & previous employer
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare impressive CV, you can include some graphics or pics of your work from earlier employment such as pic with team .. which indirectly explain team size you handled, site pics containing yourself.. explains your site visits. Some KOMs showing formal approach... but ensure, you do not break the confidential requirements...!
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Steel consumption of various capacities of over head tank
  • Ans. 

    Steel consumption for overhead tanks varies based on capacity, design, and material thickness.

    • Steel consumption increases with larger tank capacities

    • Thicker steel material will require more consumption

    • Design factors such as reinforcements also impact steel usage

  • Answered by AI
  • Q2. Grade of steel and cement
  • Ans. 

    Grade of steel and cement refers to the quality and strength of the materials used in construction projects.

    • Grade of steel is determined by its chemical composition and physical properties, such as yield strength and tensile strength.

    • Common grades of steel used in construction include ASTM A36, ASTM A572, and ASTM A992.

    • Grade of cement refers to its compressive strength and fineness.

    • Common grades of cement used in const...

  • Answered by AI
  • Q3. Class of di pipes
  • Ans. 

    Ductile Iron (DI) pipes are a type of iron pipe known for their high strength and durability.

    • DI pipes are made from ductile iron, which is a type of cast iron that has been treated while molten to change its carbon content, resulting in a more flexible and less brittle material.

    • They are commonly used for water and sewage transportation due to their corrosion resistance and ability to withstand high pressure.

    • DI pipes co...

  • Answered by AI
  • Q4. Process of water treatment plant
  • Ans. 

    Water treatment plant process involves multiple steps to remove impurities and make water safe for consumption.

    • Coagulation and flocculation to remove suspended particles

    • Sedimentation to settle out floc

    • Filtration to remove remaining particles

    • Disinfection with chlorine or other chemicals to kill bacteria and viruses

    • pH adjustment to ensure water is not too acidic or basic

  • Answered by AI
  • Q5. Type of chlorination
  • Ans. 

    Chlorination is a water treatment process that involves adding chlorine to water to disinfect it.

    • Chlorination is commonly used in water treatment plants to kill bacteria and other harmful microorganisms

    • There are different types of chlorination methods such as gas chlorination, liquid chlorination, and tablet chlorination

    • Gas chlorination involves adding chlorine gas directly into the water supply

    • Liquid chlorination invo...

  • Answered by AI
Round 1 - Technical 

(15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Ans. 

    Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.

    • Flexible pavement is made of multiple layers of materials that can flex under traffic loads.

    • Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.

    • New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...

  • Answered by AI
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index<50% , plastic limit <25% , Swelling &shrinkage <50% , effective cbr as per...
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. Two layer 150mm &150mm. It is mix in pre mix...
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute water applied on the prim coat.
  • Ans. 

    The question describes the application of prime coat and tack coat on a WMM surface.

    • Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.

    • Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.

    • The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.

    • The tack coat helps in providing a strong b...

  • Answered by AI
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Naso4 12% ...
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. ...
  • Ans. 

    Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.

    • Use M15 grade concrete with maximum aggregate cement ratio of 12:1

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...

  • Answered by AI
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure strength of cement concrete after 28 days cur...
  • Ans. 

    Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.

    • Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%

    • Flexure strength of cement concrete after 28 days curing is 4.5 MPA

    • Compressive strength of cement concrete after 28 days curing is 40 MPA

    • Dowel bar provided for expansion joint vehicle load transfer between slabs

    • Tie...

  • Answered by AI
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M

Gulf Contracting Co. WLL Interview FAQs

How many rounds are there in Gulf Contracting Co. WLL Senior Project Engineer interview?
Gulf Contracting Co. WLL interview process usually has 5 rounds. The most common rounds in the Gulf Contracting Co. WLL interview process are Technical, HR and Assignment.
What are the top questions asked in Gulf Contracting Co. WLL Senior Project Engineer interview?

Some of the top questions asked at the Gulf Contracting Co. WLL Senior Project Engineer interview -

  1. Grade of steel used in construct...read more
  2. Important of Curring in construct...read more
  3. Safe bearing capacity of s...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Gulf Contracting Co. WLL interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Gulf Contracting Co. WLL Senior Project Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Civil Engineer
11 salaries
unlock blur

₹7.8 L/yr - ₹15.8 L/yr

HSE Officer
9 salaries
unlock blur

₹7.8 L/yr - ₹14 L/yr

Construction Management
5 salaries
unlock blur

₹36 L/yr - ₹55 L/yr

QA QC Engineer
4 salaries
unlock blur

₹11.2 L/yr - ₹24 L/yr

Safety Engineer
4 salaries
unlock blur

₹6 L/yr - ₹6 L/yr

Explore more salaries
Compare Gulf Contracting Co. WLL with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.2
Compare

Tata Projects

4.3
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview