Upload Button Icon Add office photos

Gannon Dunkerley & Co.

Compare button icon Compare button icon Compare

Filter interviews by

Gannon Dunkerley & Co. B Tech Civil Engineer Interview Questions and Answers

Updated 6 Jun 2022

Gannon Dunkerley & Co. B Tech Civil Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Video calling interview

Interview Preparation Tips

Interview preparation tips for other job seekers - All questions were related to the site, more questions were asked than what you mention in the resume

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Jadavpur University and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Aptitude Test 

Very basic level aptitude test and civil engineering subjects test.

Round 2 - Technical 

(7 Questions)

  • Q1. Draw bending moment diagram of a fixed beam subjected to udl throughout the whole length.
  • Ans. 

    Bending moment diagram of a fixed beam subjected to udl throughout the whole length.

    • Calculate the reactions at the supports of the beam

    • Determine the equation for bending moment at any point along the beam

    • Plot the bending moment diagram with positive and negative values

    • The bending moment will be maximum at the supports and zero at the midpoint of the beam

  • Answered by AI
  • Q2. Draw bending moment diagram of a 1-bay, 1-storey portal frame subjected to point load at the middle point of the column.
  • Ans. 

    Bending moment diagram of a 1-bay, 1-storey portal frame with point load at column middle.

    • Calculate reactions at supports

    • Determine internal forces at critical points

    • Plot bending moment diagram using equations or software

    • Identify maximum bending moment and its location

  • Answered by AI
  • Q3. What is 'M' in M-20 concrete?
  • Ans. 

    M stands for mix design in M-20 concrete, indicating the compressive strength of the concrete mix.

    • M-20 concrete is a mix design where 'M' represents the compressive strength of the concrete after 28 days of curing.

    • The number '20' in M-20 concrete indicates the characteristic compressive strength of concrete in N/mm^2.

    • Different grades of concrete have different compressive strength requirements, with M-20 being a common

  • Answered by AI
  • Q4. Which code is req for mix design?
  • Ans. 

    IS 10262 is required for mix design in civil engineering.

    • IS 10262 is the code for concrete mix design in India.

    • It provides guidelines for proportioning of concrete ingredients based on strength and durability requirements.

    • The code covers various aspects such as water-cement ratio, workability, and compressive strength.

    • Mix design is crucial for ensuring the desired properties and performance of concrete.

    • Following the co...

  • Answered by AI
  • Q5. What is the process of earthquake design of a multi storey building?
  • Ans. 

    Earthquake design of a multi storey building involves analyzing seismic forces, selecting appropriate structural systems, and implementing design measures to ensure safety.

    • Analyze seismic forces based on the building location and seismic zone

    • Select appropriate structural systems such as reinforced concrete or steel frames

    • Implement design measures like base isolation, dampers, and shear walls to enhance building's seism

  • Answered by AI
  • Q6. Process of design of one-way and two-way slab and their differences
  • Ans. 

    Design process of one-way and two-way slabs and their differences

    • One-way slab design involves calculating bending moments and shear forces along one direction, typically supported on two opposite sides. Two-way slab design considers bending moments and shear forces in both directions, usually supported on all four sides.

    • One-way slab design is simpler and more common in practice, while two-way slab design is more comple...

  • Answered by AI
  • Q7. Difference between dynamic and equivalent static method of earthquake design and analysis of multi storey building
  • Ans. 

    Dynamic method considers time history of earthquake while equivalent static method simplifies earthquake forces into equivalent static forces.

    • Dynamic method analyzes building response to actual time history of earthquake ground motion.

    • Equivalent static method simplifies earthquake forces into equivalent static forces based on simplified assumptions.

    • Dynamic method is more accurate but computationally intensive, while eq...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for AECOM B Tech Civil Engineer interview:
  • Structural Engineering
Interview preparation tips for other job seekers - Give more importance to structural engineering subjects.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - HR 

(7 Questions)

  • Q1. What is your current workplace?
  • Ans. 

    I am currently working at a construction company specializing in infrastructure projects.

    • Specializing in infrastructure projects

    • Working at a construction company

    • Dealing with civil engineering tasks

  • Answered by AI
  • Q2. What is your experience in this field?
  • Ans. 

    I have 5 years of experience working on various civil engineering projects, including site development, infrastructure design, and construction management.

    • Managed site development projects from concept to completion

    • Designed infrastructure systems such as water supply and drainage

    • Performed construction management duties to ensure projects stayed on schedule and within budget

    • Worked on projects ranging from residential de...

  • Answered by AI
  • Q3. How do you handle a site in the transmission sector?
  • Ans. 

    Handling a site in the transmission sector involves coordinating with various stakeholders, ensuring compliance with regulations, and overseeing the construction process.

    • Coordinate with utility companies to ensure proper installation of transmission lines

    • Ensure compliance with safety regulations and environmental standards

    • Oversee the construction process to ensure quality and timely completion

    • Manage and resolve any iss...

  • Answered by AI
  • Q4. What are the key considerations for the foundation in transmission line construction?
  • Ans. 

    Key considerations for foundation in transmission line construction

    • Soil type and bearing capacity must be assessed

    • Proper foundation design to support the weight and wind loads of the transmission line towers

    • Consideration of environmental factors such as seismic activity and flooding

    • Accessibility for construction equipment and maintenance

    • Proper drainage to prevent erosion and foundation instability

  • Answered by AI
  • Q5. What is the best method for erection in transmission?
  • Ans. 

    The best method for erection in transmission is using cranes and specialized equipment.

    • Use cranes for lifting and placing heavy transmission components

    • Ensure proper planning and coordination to avoid delays

    • Utilize specialized equipment for precise positioning

    • Follow safety protocols to prevent accidents

    • Consider environmental factors such as wind and terrain

  • Answered by AI
  • Q6. How do you adapt to various challenging situations?
  • Ans. 

    I adapt to challenging situations by staying calm, analyzing the problem, seeking advice from colleagues, and coming up with creative solutions.

    • Stay calm and composed under pressure

    • Analyze the problem thoroughly before taking action

    • Seek advice and input from colleagues or experts

    • Think creatively to come up with innovative solutions

  • Answered by AI
  • Q7. What is the role of the diagonal in the transmission sector?
  • Ans. 

    The diagonal in the transmission sector plays a crucial role in providing structural stability and support to the transmission towers.

    • The diagonal members in transmission towers help to distribute the load and provide stability against wind and seismic forces.

    • They prevent the tower from buckling or collapsing under various loads.

    • Diagonals also help in reducing the overall weight of the tower by transferring some of the...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You should prepare for work by acquiring knowledge about all the processes in this field, including any difficulties or problems related to this transmission line.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Finishing work details
  • Q2. Tiles work, plaster work,MEP WORK
  • Q3. Falscilingwork,paint work
  • Q4. Layout works,coloumn,slab,beam, footing
  • Q5. RCC work, structural drawing knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical skill, finishing work details
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. What was your experience during the interview process?
  • Q2. What are your salary expectations?
  • Q3. Why you last company leave
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. From civil IS CODES
  • Q2. About steel reinforcements, bbs,various tests
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - HR 

(2 Questions)

  • Q1. How to control quality.
  • Ans. 

    Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.

    • Establishing quality control procedures and protocols

    • Regular inspections and testing of materials and workmanship

    • Training and educating staff on quality standards

    • Implementing corrective actions when deviations are identified

    • Utilizing quality control tools such as checklists

  • Answered by AI
  • Q2. What is BBS is code.
  • Ans. 

    BBS in code refers to Bar Bending Schedule as per Indian standards.

    • BBS stands for Bar Bending Schedule.

    • It is a detailed list of reinforcement bars to be used in a construction project.

    • It includes information on bar sizes, shapes, quantities, and placement.

    • BBS is prepared as per the requirements of Indian standards like IS 2502:1963.

    • It helps in ensuring proper reinforcement placement and quantity in the structure.

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
No response

I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

They ask question on SFD AND BMD

Round 3 - Technical 

(2 Questions)

  • Q1. They ask question on SFD & BMD
  • Q2. And they also ask question on orthographic

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer was very chill and calm
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Construction answer
  • Q2. Correct Answer
  • Q3. Rcc work, shuttering, Excavation
  • Q4. Safety work, Quality work
  • Q5. Labour Mobilizacttion

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good trips
Facilities very nice
Travelling, food facilities very good

Gannon Dunkerley & Co. Interview FAQs

How many rounds are there in Gannon Dunkerley & Co. B Tech Civil Engineer interview?
Gannon Dunkerley & Co. interview process usually has 2 rounds. The most common rounds in the Gannon Dunkerley & Co. interview process are Assignment and Resume Shortlist.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
AECOM Interview Questions
4.2
 • 113 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
Bechtel Interview Questions
4.0
 • 69 Interviews
View all

Fast track your campus placements

View all
Senior Engineer
96 salaries
unlock blur

₹3 L/yr - ₹7.6 L/yr

Civil Engineer
55 salaries
unlock blur

₹2.2 L/yr - ₹6.3 L/yr

Assistant Engineer
47 salaries
unlock blur

₹2.5 L/yr - ₹5.6 L/yr

Civil Site Engineer
44 salaries
unlock blur

₹2.1 L/yr - ₹5.2 L/yr

Junior Engineer Civil
39 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Explore more salaries
Compare Gannon Dunkerley & Co. with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview