Filter interviews by
I applied via Campus Placement and was interviewed in Mar 2024. There were 2 interview rounds.
I am a recent graduate with a degree in engineering, eager to learn and grow in a professional setting.
Recent graduate with a degree in engineering
Eager to learn and grow in a professional setting
Strong problem-solving skills
Excellent communication skills
Experience with relevant software/tools (mention specific ones if applicable)
I come from a middle-class family in a small town. Currently, I am living in the city where I am pursuing my engineering degree.
Middle-class family background
From a small town
Currently living in the city for education
Pursuing engineering degree
Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction for its strength and durability.
Made of cement, water, aggregates, and sometimes additives
Used in construction for its strength and durability
Can be reinforced with materials like steel bars for added strength
Comes in different types such as ready-mix, precast, and shotcrete
Characteristics strength is the strength of a material that represents the minimum strength value below which not more than a certain percentage of test results are expected to fall.
Characteristics strength is used in design to ensure that structures are safe and reliable.
It is typically determined through statistical analysis of test results.
For example, in concrete design, the characteristic strength is denoted as fc...
Final and initial setting time are important parameters in determining the setting characteristics of cement.
Final setting time is the time taken for the cement paste to completely set and harden.
Initial setting time is the time taken for the cement paste to start losing its plasticity and become rigid.
These times are crucial for construction projects to ensure proper handling and curing of cement.
For example, ASTM C19...
I appeared for an interview before Feb 2024.
Concrete is a composite material made of cement, water, aggregates, and sometimes additives. It hardens over time to form a strong and durable building material.
Concrete is made by mixing cement, water, and aggregates like sand and gravel.
The chemical reaction between cement and water, known as hydration, causes the mixture to harden and set.
Additives can be included to improve specific properties of the concrete, such...
BBS (Bar Bending Schedule) is a detailed list of reinforcement bars with their shape, size, quantity, and placement in a structural element.
BBS helps in ensuring proper reinforcement placement as per design drawings
It helps in estimating the quantity of steel required for construction
It aids in reducing wastage of steel during construction
BBS assists in maintaining structural integrity and strength of the building
Prope...
I applied via Campus Placement and was interviewed in Feb 2023. There were 3 interview rounds.
All aptitude syllabus that is required for government jobs.
The density of iron is approximately 7.87 g/cm^3.
The density of iron is 7.87 g/cm^3.
Density is a measure of how much mass is contained in a given volume.
Iron is a dense metal due to its atomic structure.
Density = Mass/Volume. For iron, this means 7.87 grams of iron occupies 1 cubic centimeter.
Other common units for density include kg/m^3 and lb/in^3.
Gannon Dunkerley & Co. interview questions for designations
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
based on 4 interviews
Interview experience
based on 5 reviews
Rating in categories
Senior Engineer
95
salaries
| ₹3 L/yr - ₹7.6 L/yr |
Civil Engineer
52
salaries
| ₹2.2 L/yr - ₹6.3 L/yr |
Civil Site Engineer
44
salaries
| ₹2.1 L/yr - ₹5.2 L/yr |
Assistant Engineer
43
salaries
| ₹2.5 L/yr - ₹5.6 L/yr |
Junior Engineer
41
salaries
| ₹2 L/yr - ₹6 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem