I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
Quantity survey involves estimating and managing costs of construction projects, while billing is the process of invoicing clients for work done.
Quantity survey involves cost estimation, cost control, and contract administration.
Billing involves invoicing clients for work done, including labor, materials, and other expenses.
Quantity surveyors work closely with architects, engineers, and contractors to ensure projects a...
Top trending discussions
posted on 5 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
Before casting a tower foundation, several things need to be checked to ensure its stability and durability.
Check the soil condition and bearing capacity
Ensure proper reinforcement and formwork
Verify the dimensions and alignment of the foundation
Check for any obstructions or utilities in the excavation area
Ensure proper curing of the concrete
Verify compliance with local building codes and regulations
Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.
Measure the length and depth of the foundation
Measure the width at both ends and find the average width
Multiply the average width by the length and depth to get the volume
Calculate the quantity by multiplying the volume with the unit weight of concrete
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.
Excavation process in the oil and gas industry involves several steps to ensure safe and efficient operations.
The first step in the excavation process is to conduct a thorough site survey to identify potential hazards and determine the best approach for excavation.
Before excavation begins, proper permits and approvals must be obtained from relevant authorities.
Excavation equipment such as excavators, bulldozers, and ba...
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
Assistant Manager
85
salaries
| ₹4.2 L/yr - ₹9.5 L/yr |
Civil Engineer
43
salaries
| ₹2.4 L/yr - ₹5.8 L/yr |
Deputy Manager
40
salaries
| ₹7 L/yr - ₹14 L/yr |
Civil Site Engineer
21
salaries
| ₹1.6 L/yr - ₹5.5 L/yr |
Plant Engineer
18
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Sterling & Wilson
J K Fenner
Saudi Binladin Group
McNally Bharat Engineering