Structure complete at the time taken as built coordinate
Laying out a survey for a site involves determining property boundaries and marking them with stakes or flags.
Start by reviewing property deeds and legal documents to understand boundaries
Use surveying equipment like total stations or GPS to measure and mark boundaries accurately
Consider any existing structures or obstacles on the site that may affect the survey layout
Setting out coordinate involves establishing points on the ground based on a specific coordinate system.
Use surveying equipment like total stations or GPS to accurately measure and mark points
Ensure the coordinate system used is consistent and accurate
Verify the points set out match the design or plan specifications
I applied via Campus Placement and was interviewed in Feb 2022. There was 1 interview round.
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.
The least count of a total station is the smallest measurement that can be accurately read or recorded by the instrument.
The least count is determined by the precision of the instrument's internal components.
It is typically expressed in units of distance, such as millimeters or seconds of arc.
For example, if the least count of a total station is 5mm, it means that the instrument can measure distances accurately to the ...
The height of a mini prism varies depending on the manufacturer and model.
Mini prisms are used in surveying to measure distances and angles.
The height of a mini prism is typically between 25mm to 50mm.
The height of a mini prism can affect the accuracy of the surveying measurements.
It is important to use the correct height of mini prism for the specific surveying task.
Manufacturers usually provide the height of their mi
The least count of an auto level is the smallest measurement that can be read on the instrument.
The least count is determined by the size of the divisions on the instrument's scale.
It is usually expressed in millimeters or fractions of an inch.
For example, if the least count is 0.5 mm, the instrument can measure differences in elevation of 0.5 mm or greater.
The least count can vary depending on the make and model of th
Laying out coordinates involves marking specific points on the ground based on their x, y, and sometimes z values.
Use a total station or GPS device to accurately measure and record coordinates
Mark points with stakes, flags, or paint for future reference
Ensure coordinates are recorded in the correct datum and projection for accurate mapping
Auto level is a surveying instrument used to measure height differences in the field.
Auto level uses a compensator to ensure accurate readings even on uneven terrain.
It is commonly used in construction, land development, and road building projects.
The instrument is set up on a tripod and the surveyor looks through the eyepiece to read the height difference on a graduated staff.
Auto levels are preferred for their ease o...
Trivers for target point refers to the process of using trigonometry to calculate the coordinates of a specific point on a surveying site.
Trivers formula involves using angles and distances to calculate the coordinates of a target point.
It is essential for accurate land surveying and mapping.
Example: If you have the angle and distance measurements from two known points, you can use Trivers formula to calculate the coor
A point for set out is a reference point used by surveyors to mark the location of specific points on a site.
Set out points are typically marked with stakes, nails, or paint on the ground.
These points are used to guide construction workers in accurately placing structures or boundaries.
Surveyors use measurements and calculations to determine the exact coordinates of set out points.
posted on 14 Dec 2019
I applied via Recruitment Consultant
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
The principle of surveying involves measuring and mapping the Earth's surface to determine the relative positions of points.
Surveying is used to establish property boundaries, create topographic maps, and plan construction projects.
The principle of surveying relies on accurate measurements using various instruments such as total stations, GPS receivers, and levels.
Surveyors use mathematical calculations and trigonometr...
based on 1 review
Rating in categories
Assistant Manager
91
salaries
| ₹4.2 L/yr - ₹10 L/yr |
Civil Engineer
43
salaries
| ₹2.4 L/yr - ₹5.8 L/yr |
Deputy Manager
40
salaries
| ₹7 L/yr - ₹14 L/yr |
Civil Site Engineer
21
salaries
| ₹1.6 L/yr - ₹5.5 L/yr |
Plant Engineer
18
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Sterling & Wilson
J K Fenner
Saudi Binladin Group
McNally Bharat Engineering