Faster and better experience!
Filter interviews by
I was interviewed in Feb 2025.
P2P process involves all steps from requisition to payment for goods and services.
Initiation of purchase requisition
Vendor selection and negotiation
Purchase order creation and approval
Receipt of goods/services
Invoice processing and payment
Supplier performance evaluation
I oversee the procurement process to ensure quality standards are met. My team consists of procurement specialists and quality assurance engineers.
Reviewing and approving purchase orders to ensure compliance with quality standards
Collaborating with suppliers to address quality issues and improve processes
Conducting audits and inspections of suppliers to assess quality performance
Training team members on quality assuran
Seeking new challenges and growth opportunities in a different environment.
Desire for new challenges and growth opportunities
Looking for a change in work environment
Seeking to broaden skill set and knowledge
Interested in exploring different industries or sectors
I applied via Recruitment Consulltant
Wire tiper and crimper are tools used to strip and crimp wires for electrical connections.
Use wire stripper to remove insulation from the end of a wire by placing it in the cutting jaws and squeezing the handles.
Use wire crimper to attach a connector to the stripped end of the wire by placing the connector in the crimping jaws and squeezing the handles.
Ensure the wire is stripped to the correct length before crimping t...
Identifying simples and understanding drawings is crucial for Panel Wireman.
Study the drawing carefully to identify different components and materials used
Refer to the legend or key provided in the drawing for symbols and materials
Consult with supervisors or experienced colleagues for clarification if needed
Use measuring tools to verify dimensions and materials specified in the drawing
Attend training sessions or worksh...
I have a family of 4 persons including myself.
My family consists of 4 members
This includes myself and 3 other family members
We are a family of 4
I have worked for ABC Company and XYZ Company in the past.
Worked for ABC Company as a Panel Wireman
Also worked for XYZ Company on various projects
I applied via Company Website and was interviewed in Aug 2024. There were 2 interview rounds.
I am a dedicated Testing & Commissioning Engineer with a strong background in electrical engineering and experience in ensuring the functionality and safety of various systems.
Bachelor's degree in Electrical Engineering
Experience in testing and commissioning electrical systems
Knowledge of industry standards and regulations
Strong problem-solving skills
Effective communication and teamwork abilities
I have 5 years of experience in substation network.
I have worked on various substation projects, including design, testing, and commissioning.
I have experience with different types of substation equipment and systems.
I have successfully completed multiple substation network projects on time and within budget.
I am leaving my current job because I am seeking new challenges and opportunities. I am attracted to this role because of the chance to work on diverse projects and utilize my skills in testing and commissioning.
Seeking new challenges and opportunities
Attracted to diverse projects
Excited to utilize skills in testing and commissioning
I am excited about the opportunities in Saudi Arabia, my visa status is XYZ, and my current salary is ABC.
Excited about the opportunities for growth and development in Saudi Arabia
Visa status is XYZ
Current salary is ABC
alfanar Saudi Arabia is a leading electrical engineering company in the Middle East.
alfanar Saudi Arabia specializes in electrical engineering solutions.
They offer a wide range of products and services including power distribution, control panels, and lighting solutions.
The company has a strong presence in the Middle East and has completed numerous projects in the region.
alfanar Saudi Arabia is known for its quality an...
A technical introduction from start to end involves understanding the project requirements, planning the testing process, executing the tests, analyzing the results, and ensuring the system meets specifications.
Understand project requirements and specifications
Plan the testing process including test cases and scenarios
Execute tests using appropriate tools and techniques
Analyze test results and identify any issues or de...
The first step would be to investigate the cause of the secondary core of ct being open while the feeder is still working on very less load.
Check for any loose connections in the secondary core of ct
Inspect for any damage or faults in the secondary core of ct
Verify the load on the feeder to ensure it is within normal operating range
Consult with colleagues or experts for further troubleshooting steps
ATS stands for Automatic Transfer Switch. It is used to automatically switch between primary and backup power sources.
ATS is a device used to switch between primary and backup power sources in case of power failure.
To configure ATS relay, you need to set the parameters such as voltage, frequency, and delay timings.
Trip selection refers to the setting that determines when the ATS will switch between power sources based ...
High voltage testing standard as per IEC includes testing voltage for 33kV system and familiar testing kits.
High voltage testing standard as per IEC includes IEC 60060-1 for high-voltage test techniques.
Testing voltage for 33kV system voltage is typically around 70-80kV.
Common testing kits for high voltage testing include insulation testers, voltage detectors, and partial discharge testers.
LIBBP and HIBBP stability and sensitivity refer to protection schemes for electrical systems. Implementing logic for one incomer and three outgoing feeders involves setting up coordination and communication between devices. BBP protection testing ensures the system operates correctly under fault conditions.
LIBBP and HIBBP stability and sensitivity are important for ensuring reliable protection of electrical systems.
Imp...
Close block is a device used to short circuit the secondary of a current transformer (CT) during testing to prevent damage to the CT. No fuse or MCB is used on the CT circuit to avoid any interruption during testing.
Close block is used to short circuit the secondary of a CT during testing to prevent damage.
It ensures that the CT is not overloaded with excessive current during testing.
No fuse or MCB is used on the CT ci...
To change motor rotation, swap any two of the three power supply wires.
Swap any two of the three power supply wires to change motor rotation.
Ensure power is disconnected before making any changes.
Consult the motor's manual for specific instructions.
Test the motor after making the changes to ensure it is rotating in the desired direction.
Two-way connection can be achieved by using two switches to control a single light or appliance from two different locations.
Install two switches at different locations to control the same light or appliance
Connect the common terminal of one switch to the phase or live wire
Connect the common terminal of the other switch to the light or appliance
Connect the remaining terminals of both switches to complete the circuit
Tes
Termination for control panel involves connecting wires from various components to the terminal blocks inside the panel.
Identify the components that need to be connected to the control panel
Strip the insulation off the wires to expose the conductors
Connect the wires to the appropriate terminal blocks based on the wiring diagram
Secure the connections with terminal screws or clamps
Label the wires for easy identification
Terminating a GIS panel involves connecting and securing the cables to the appropriate terminals.
Identify the cables to be terminated
Strip the insulation from the cable ends
Connect the cables to the designated terminals
Secure the connections with appropriate fasteners
Test the connections to ensure they are secure and functioning properly
Termination for switch gear involves connecting the wires to the appropriate terminals for proper functioning.
Identify the terminals for the switch gear
Strip the insulation from the wires to expose the conductors
Connect the wires to the corresponding terminals using appropriate connectors
Ensure proper tightening of the connectors to secure the connection
Test the connection to ensure it is functioning correctly
Alfanar interview questions for popular designations
Get interview-ready with Top Alfanar Interview Questions
I applied via Walk-in and was interviewed in Mar 2024. There were 2 interview rounds.
I have a Bachelor's degree in Electrical Engineering and a certification in Electronics.
Bachelor's degree in Electrical Engineering
Certification in Electronics
I have 5 years of experience working as a technician in various industries.
5 years of experience as a technician
Worked in various industries
Hands-on experience with troubleshooting and maintenance
Familiar with different types of equipment and tools
I am from a small town in the Midwest called Springfield.
I grew up in a close-knit community surrounded by farmland.
The town has a population of around 10,000 people.
Springfield is known for its annual corn festival.
It is located about an hour away from the nearest big city.
I work with a team of dedicated and skilled technicians who are always ready to assist.
Collaborate with other technicians to troubleshoot and solve technical issues
Communicate effectively with team members to ensure smooth workflow
Support and assist colleagues in completing tasks efficiently
My salary expectation is based on my experience, qualifications, and the industry standard.
Consider my level of experience and qualifications
Research industry standards for similar positions
Be prepared to negotiate based on benefits and perks offered
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There was 1 interview round.
Transformers are electrical devices that transfer electrical energy between two or more circuits through electromagnetic induction.
Transformers consist of two coils of wire, known as the primary and secondary coils, which are usually wound around a core made of iron or steel.
They work on the principle of electromagnetic induction, where a changing current in the primary coil induces a voltage in the secondary coil.
Tran...
I applied via Referral and was interviewed before Mar 2023. There were 3 interview rounds.
The next step in SAP CRM is to transition to SAP C/4HANA for enhanced customer engagement and experience.
Transition from SAP CRM to SAP C/4HANA for improved customer engagement
Utilize advanced features like machine learning and AI for personalized customer interactions
Integrate with other SAP solutions like SAP S/4HANA for seamless business processes
30 min with 35 questions.
Top trending discussions
The duration of Alfanar interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 26 interviews
Interview experience
based on 337 reviews
Rating in categories
Testing & Commissioning Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Testing Commissioning Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Manager
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Group
Adani Group
Reliance Industries