G R Infraprojects Senior Structural Engineer Interview Questions, Process, and Tips

Updated 26 Jun 2024

Top G R Infraprojects Senior Structural Engineer Interview Questions and Answers

G R Infraprojects Senior Structural Engineer Interview Experiences

3 interviews found

I applied via Referral and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. Question are right their from our field, simple and easy.
  • Q2. What do you know about concrete mix design for higher grade of concrete?
  • Ans. 

    Concrete mix design for higher grade involves selecting appropriate materials and proportions to achieve desired strength and durability.

    • Higher grade concrete requires higher strength and durability

    • Materials like cement, aggregates, and water need to be carefully selected and proportioned

    • Admixtures may be added to improve workability, strength, or durability

    • Testing and quality control are crucial to ensure desired prop...

  • Answered by AI
  • Q3. What are the risky job you have done in your experiences?
  • Q4. What type of structures you had worked upon?
  • Ans. 

    I have worked on various types of structures including high-rise buildings, bridges, and industrial facilities.

    • High-rise buildings

    • Bridges

    • Industrial facilities

    • Residential buildings

    • Commercial buildings

    • Sports facilities

  • Answered by AI
  • Q5. How did you manage resources, if you have to complete multiple task in a given period of time
  • Q6. Explain about launching girders of segment?
  • Ans. 

    Launching girders are used to place precast segments of a bridge deck onto piers or abutments.

    • Launching girders are typically used for long span bridges or bridges over waterways.

    • They are designed to support the weight of the precast segments during placement.

    • The girders are typically moved along the bridge using hydraulic jacks or rollers.

    • Once in position, the precast segments are lifted onto the girders and then move...

  • Answered by AI
  • Q7. Explain about yourself briefly?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be always confident, exact answer if you don't know say sorry and go forward.

Try to put positive approach and a good through.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Bridge construction and BBS
  • Q2. Execution of site like vup

Senior Structural Engineer Interview Questions Asked at Other Companies

Q1. 7. Explain what seismic design lod combinations are used in your ... read more
Q2. What do you know about concrete mix design for higher grade of co ... read more
Q3. Can we use a single angle connection for axial loads
Q4. 4. Types of welds and how do you find the weld size
Q5. Grade of cement How to find cut off level in pile foundation Maxi ... read more
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. PSC Girder, RCC Girder and Is coad
  • Q2. All box type structure and pile foundation with coad
  • Ans. 

    Box type structures are commonly used in construction for their strength and durability, often supported by pile foundations with coating for protection against corrosion.

    • Box type structures are known for their rigid and strong design, providing stability and support for various applications.

    • Pile foundations are used to transfer the load of the structure to a deeper, more stable soil or rock layer.

    • Coating on pile found...

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How do frame a structure?
  • Ans. 

    Structures are framed by designing a skeleton of beams and columns to support the load.

    • Start by determining the loads the structure will need to support.

    • Design a skeleton of beams and columns to distribute the load.

    • Consider factors such as material strength, stability, and aesthetics.

    • Use software like AutoCAD or Revit to create detailed plans and drawings.

    • Consult with architects and other engineers to ensure the struct

  • Answered by AI
  • Q2. What will be the value for shape mode?
  • Ans. 

    The value for shape mode represents the most frequently occurring value in a dataset.

    • Shape mode is the value that appears most frequently in a dataset.

    • It is used to describe the central tendency of a dataset.

    • For example, in a dataset of test scores, if the score of 85 appears most frequently, then 85 is the shape mode.

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is the is code for structure
  • Ans. 

    The IS code for structures in India is IS 456:2000, which covers the general requirements for the design and construction of reinforced concrete structures.

    • The IS code for structures in India is IS 456:2000

    • It covers the general requirements for the design and construction of reinforced concrete structures

    • The code provides guidelines for materials, design, construction, quality control, and maintenance of structures

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. What is your straight & weakness?

I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Any Structure related work
  • Q2. Bridge ,rob rub,fob mib,mib
  • Q3. Any questions regarding Major structure
  • Q4. Civil engineering related
Round 3 - Aptitude Test 

Interview Preparation Tips

Interview preparation tips for other job seekers - Any work regarding civil engineering, Major structure
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Basics of civil engineering
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the IS code of pile.
  • Ans. 

    IS 2911 is the Indian Standard code for design and construction of pile foundations.

    • IS 2911 is the code for design and construction of pile foundations in India.

    • It covers various types of piles including driven piles, bored cast-in-situ piles, etc.

    • The code provides guidelines for the design, materials, construction, and testing of piles.

    • It ensures the safety and stability of structures supported by piles.

    • Example: IS 29...

  • Answered by AI
  • Q2. What is the density of bentonite during piling.
  • Ans. 

    The density of bentonite during piling is typically around 1.0 to 1.2 g/cm^3.

    • The density of bentonite can vary depending on the specific type and concentration used.

    • Higher density bentonite is often preferred for better support during piling operations.

    • Typical range of density for bentonite during piling is 1.0 to 1.2 g/cm^3.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Auto cad commands
  • Q2. Trim Shortcut Key
  • Q3. Fillet Command Use Which Purpose
  • Ans. 

    The Fillet command is used in structural engineering to create a rounded corner between two lines or objects.

    • The Fillet command is used to create a smooth transition between two lines or objects by adding a rounded corner.

    • It is commonly used in structural engineering to create fillets at the junctions of beams, columns, and other structural elements.

    • The Fillet command can be used with different radius values to control...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare the basic question and answers

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is mean by shear key
  • Ans. 

    Shear key is a device used to transfer shear forces between two components in a structure.

    • Shear keys are typically used in construction joints to prevent sliding between adjacent components.

    • They are designed to resist horizontal forces and ensure stability.

    • Shear keys can be found in structures such as bridges, buildings, and dams.

    • Examples include shear keys in bridge expansion joints to prevent movement between bridge

  • Answered by AI
  • Q2. Different between columns and beams
  • Ans. 

    Columns are vertical structural members that support loads, while beams are horizontal members that transfer loads to columns or walls.

    • Columns are vertical and primarily support compressive loads.

    • Beams are horizontal and primarily support bending loads.

    • Columns are typically taller than they are wide, while beams are typically wider than they are tall.

    • Examples: In a building, columns support the weight of the floors abo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Ss

G R Infraprojects Interview FAQs

How many rounds are there in G R Infraprojects Senior Structural Engineer interview?
G R Infraprojects interview process usually has 1-2 rounds. The most common rounds in the G R Infraprojects interview process are Technical and Resume Shortlist.
What are the top questions asked in G R Infraprojects Senior Structural Engineer interview?

Some of the top questions asked at the G R Infraprojects Senior Structural Engineer interview -

  1. What do you know about concrete mix design for higher grade of concret...read more
  2. What type of structures you had worked upo...read more
  3. Explain about launching girders of segmen...read more

Tell us how to improve this page.

G R Infraprojects Senior Structural Engineer Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more
G R Infraprojects Senior Structural Engineer Salary
based on 48 salaries
₹4.2 L/yr - ₹7.8 L/yr
48% less than the average Senior Structural Engineer Salary in India
View more details

G R Infraprojects Senior Structural Engineer Reviews and Ratings

based on 18 reviews

3.3/5

Rating in categories

3.1

Skill development

2.8

Work-life balance

3.2

Salary

2.7

Job security

2.9

Company culture

3.0

Promotions

2.9

Work satisfaction

Explore 18 Reviews and Ratings
Assistant Manager
389 salaries
unlock blur

₹4.4 L/yr - ₹11.5 L/yr

Senior Engineer
224 salaries
unlock blur

₹3.6 L/yr - ₹8.6 L/yr

Engineer
137 salaries
unlock blur

₹2 L/yr - ₹6.8 L/yr

Deputy Manager
125 salaries
unlock blur

₹6.6 L/yr - ₹17.5 L/yr

Structural Engineer
123 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare G R Infraprojects with

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Ashoka Buildcon

4.0
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview