I applied via Referral and was interviewed in Jan 2022. There were 4 interview rounds.
To detect boiler superheater tube leakage, inspect for steam or water leakage. Bed coil tubes thickness can be identified using ultrasonic testing. Coal handling plant questions may include equipment and safety measures.
Inspect for steam or water leakage to detect boiler superheater tube leakage
Use ultrasonic testing to identify bed coil tubes thickness
Coal handling plant questions may include equipment and safety meas...
posted on 20 Jul 2017
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
posted on 1 Sep 2021
I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
posted on 2 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.
posted on 11 Jan 2024
I applied via AmbitionBox and was interviewed before Jan 2023. There was 1 interview round.
posted on 29 May 2024
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
Initial setting time is the time taken for the cement to harden to a certain degree, while final setting time is the time taken for the cement to completely harden.
Initial setting time is typically around 30 minutes to 1 hour after adding water to the cement.
Final setting time is usually around 2 to 4 hours after adding water to the cement.
Setting time can vary based on the type of cement and environmental conditions.
S
Bleeding is the process of air escaping from fresh concrete mix and rising to the surface.
Bleeding occurs when water in the concrete mix rises to the surface due to settlement of solid particles.
It can lead to surface defects if not properly managed.
Bleeding can be reduced by using proper mix design and techniques like vibration or adding admixtures.
Excessive bleeding can weaken the surface of the concrete.
Examples: Wa...
based on 4 reviews
Rating in categories
Field Engineer
107
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
102
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
65
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company