Filter interviews by
Developing safety management involves creating policies, procedures, and training programs to ensure a safe work environment.
Identify potential hazards and assess risks
Establish safety policies and procedures
Train employees on safety protocols
Conduct regular safety audits and inspections
Encourage employee participation in safety programs
Continuously improve safety management through feedback and analysis
Legal requirements in construction industry
Compliance with OSHA regulations
Adherence to building codes and permits
Proper disposal of hazardous materials
Worker safety training and equipment
Environmental impact assessments
Contractor licensing and insurance
Worker's compensation insurance
ADA compliance for accessibility
Noise and vibration control measures
I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.
Top trending discussions
I applied via LinkedIn and was interviewed in Nov 2024. There were 3 interview rounds.
Logic test and personality test
I am a sustainability consultant with a background in environmental science and experience in implementing sustainable practices.
Background in environmental science
Experience in implementing sustainable practices
Passionate about promoting sustainability in various industries
Passionate about promoting sustainable practices and making a positive impact on the environment.
Passionate about environmental conservation and sustainability
Believe in the importance of implementing sustainable practices in businesses
Excited about the opportunity to help organizations reduce their carbon footprint
Previous experience in sustainability projects or initiatives
I faced a challenge in my previous role when implementing a sustainability program for a large corporation.
Resistance from upper management to allocate resources for sustainability initiatives
Difficulty in engaging employees at all levels to participate in sustainability efforts
Lack of buy-in from stakeholders outside of the organization
Balancing short-term financial goals with long-term sustainability objectives
posted on 26 Oct 2024
I applied via campus placement at SRM Institute of Science & Technology, Chennai and was interviewed in Sep 2024. There was 1 interview round.
Starters are devices used to start and control the speed of induction motors.
Direct On-Line (DOL) starter: provides full voltage to the motor at start
Star-Delta starter: reduces the starting current by initially connecting the motor in star configuration
Auto-transformer starter: uses an auto-transformer to reduce the voltage during starting
Soft starter: gradually increases the voltage to the motor to reduce starting cu...
Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.
Types of earthing include plate earthing, pipe earthing, rod earthing, and strip earthing.
Methods of earthing include neutral earthing, equipment earthing, and system earthing.
Earthing is essential for safety in electrical systems to prevent electric shock and damage to equipment.
Proper earthing ensure...
TF stands for Transformer. It is a static device used to transfer electrical energy between two or more circuits through electromagnetic induction.
Principle of TF involves Faraday's law of electromagnetic induction.
Types of TF include step-up, step-down, isolation, auto-transformer, etc.
TFs are used in power distribution, voltage regulation, impedance matching, etc.
The starting current of a DOL starter is typically 6-8 times the rated current of the motor.
The Direct-On-Line (DOL) starter is used to start induction motors.
The starting current of a DOL starter is usually 6-8 times the rated current of the motor.
This high starting current can cause voltage drops and stress on the electrical system.
Choose AC cables based on current rating, insulation material, and environmental conditions.
Consider the current rating of the cable to ensure it can handle the load
Choose the appropriate insulation material based on the application and environment
Take into account environmental conditions such as temperature, moisture, and exposure to chemicals
Select the right cable size to minimize voltage drop and power loss
Ensure c...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 2 Aug 2024
I applied via Company Website
The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.
Company has a strong financial position
Ongoing projects are in progress
Company has a good reputation in the industry
Employee growth refers to the development and advancement of an individual within their career.
Employee growth involves acquiring new skills and knowledge
It includes taking on more responsibilities and challenges
Career progression and promotions are indicators of employee growth
Action points at site level refer to specific tasks or activities that need to be completed on the construction site.
Action points are typically identified during site inspections or progress meetings.
They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.
Examples of action points could be revising drawings to address conflicts, obtaining necess...
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
I was interviewed before Jan 2024.
posted on 14 Nov 2024
I applied via Campus Placement and was interviewed in Oct 2024. There was 1 interview round.
Interview experience
Assistant Manager
12
salaries
| ₹6 L/yr - ₹9.6 L/yr |
Project Engineer
12
salaries
| ₹3 L/yr - ₹6 L/yr |
Project Manager
9
salaries
| ₹6.6 L/yr - ₹12 L/yr |
Senior Project Engineer
8
salaries
| ₹5.2 L/yr - ₹7.2 L/yr |
Assistant Manager Safety
6
salaries
| ₹5.2 L/yr - ₹7.5 L/yr |
Fabindia
Welspun
Raymond Lifestyle Limited
Titan Company