I was interviewed in Aug 2023.
Heat transfer and mass transfer are two different phenomena in the field of engineering.
Heat transfer involves the movement of thermal energy from one object to another due to a temperature difference.
Mass transfer involves the movement of mass from one location to another within a system.
Examples of heat transfer include conduction, convection, and radiation.
Examples of mass transfer include diffusion, osmosis, and di
Fluid mechanics deals with the study of fluids in motion and at rest. Pumps are devices used to move fluids from one place to another.
Fluid mechanics involves the study of how fluids behave and interact with their surroundings.
There are different types of flow in fluid mechanics, such as laminar flow and turbulent flow.
Pumps are devices used to increase the pressure of a fluid in order to move it from one location to a...
Distillation columns are classified based on their internal structure and operation, such as tray columns, packed columns, and fractional distillation columns.
Distillation columns are used to separate components in a mixture based on their boiling points.
Tray columns have horizontal trays where vapor and liquid phases come into contact for separation.
Packed columns contain packing material to increase surface area for ...
There are different types of fire extinguishers for different types of fires, such as Class A, B, C, D, and K.
Class A extinguishers are for ordinary combustibles like wood and paper
Class B extinguishers are for flammable liquids like gasoline and oil
Class C extinguishers are for electrical fires
Class D extinguishers are for flammable metals
Class K extinguishers are for kitchen fires involving cooking oils and fats
posted on 19 Oct 2023
I applied via Recruitment Consulltant and was interviewed in May 2023. There were 2 interview rounds.
I applied via Campus Placement
Normal basic level questions
posted on 17 Oct 2023
I applied via Referral and was interviewed in Jan 2023. There was 1 interview round.
Productivity for Planning is crucial for achieving goals and meeting deadlines.
Effective time management is key to improving productivity in planning.
Setting clear goals and priorities helps in staying focused and organized.
Regularly reviewing and adjusting plans based on progress and feedback is essential.
Utilizing tools and technology to streamline processes can increase efficiency.
Encouraging collaboration and commu...
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
S Curves are graphical representations of project progress over time.
S Curves show the planned progress, actual progress, and earned value of a project.
They are useful for tracking project performance and identifying potential delays.
The curve is named after its S shape, which represents the typical pattern of project progress.
S Curves can be used for various aspects of a project, such as cost, schedule, and resource a...
EVM stands for Earned Value Management. It is a project management technique used to measure project performance and progress.
EVM compares the actual work completed and the budgeted work to determine if the project is on track or not.
It uses three key values: Planned Value (PV), Actual Cost (AC), and Earned Value (EV).
PV is the budgeted cost of the work scheduled to be done, AC is the actual cost incurred, and EV is th...
There are 3 levels of schedules: Level 1, Level 2, and Level 3.
Level 1: Master Schedule - high-level overview of the project
Level 2: Project Schedule - detailed breakdown of the project into smaller components
Level 3: Look-Ahead Schedule - weekly or daily schedule that focuses on specific tasks
I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.
I have extensive experience and familiarity with various T codes.
I have worked with T codes such as CO01, CO02, CO03, MD04, MD05, MD06, MD07, MD08, and many more.
I am proficient in using T codes for planning, scheduling, and monitoring production processes.
I have also customized T codes to meet specific business requirements.
My familiarity with T codes has helped me streamline processes and improve efficiency in my pre
Project Engineer
76
salaries
| ₹15 L/yr - ₹40 L/yr |
Data Scientist
49
salaries
| ₹14 L/yr - ₹43 L/yr |
Master Data Specialist
43
salaries
| ₹5.5 L/yr - ₹8.5 L/yr |
Project Control Engineer
41
salaries
| ₹15 L/yr - ₹36 L/yr |
Planning Analyst
34
salaries
| ₹11 L/yr - ₹18 L/yr |
Reliance Industries
Bharat Petroleum
Indian Oil Corporation
Hindustan Petroleum