i
ExxonMobil
Filter interviews by
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.
Productivity of equipment can be measured by factors like utilization rate, downtime, and efficiency.
Productivity of equipment can be measured by factors such as utilization rate, downtime, and efficiency.
Utilization rate is calculated by dividing actual working hours by total available hours.
Downtime refers to the time when equipment is not operational, impacting productivity.
Efficiency is determined by comparing actu...
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
Experienced Document Controller with a background in managing and organizing project documentation.
Over 5 years of experience in document control roles
Proficient in using document management systems such as SharePoint
Skilled in organizing, categorizing, and maintaining project documentation
Strong attention to detail and accuracy in document management
Excellent communication and teamwork skills
I worked at XYZ Company as a Document Controller for 3 years.
Managed all documentation related to project specifications, drawings, and reports
Ensured all documents were accurately filed and easily accessible
Collaborated with project teams to update and maintain document control procedures
posted on 29 May 2024
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
posted on 14 May 2024
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
Questions for job role and perform task (for job role).
Discussion with senior, manager and Hod
I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
A
I was interviewed in Aug 2017.
Some of the top questions asked at the ExxonMobil Project Control Engineer interview -
based on 3 interviews
Interview experience
based on 5 reviews
Rating in categories
Project Engineer
78
salaries
| ₹15 L/yr - ₹40 L/yr |
Data Scientist
54
salaries
| ₹14 L/yr - ₹52 L/yr |
Master Data Specialist
43
salaries
| ₹5.5 L/yr - ₹8.5 L/yr |
Project Control Engineer
38
salaries
| ₹15.6 L/yr - ₹46 L/yr |
Planning Analyst
34
salaries
| ₹11 L/yr - ₹18.5 L/yr |
Reliance Industries
Bharat Petroleum
Indian Oil Corporation
Hindustan Petroleum