I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.
Control points & TBM are located at specific coordinates on the site.
Control points are established to provide a reference for surveying measurements.
TBM (Temporary Bench Mark) is a point of known elevation used as a reference for leveling.
The location of control points and TBM are determined based on the project requirements and site conditions.
They are typically marked with a stake or monument and recorded in a surve
Yes, I am familiar with columns and core-wall offset marking.
Columns and core-walls are marked with a specific offset to ensure proper alignment and placement.
This marking is usually done using a chalk line or laser level.
The offset distance is determined by the project specifications and can vary depending on the size and location of the columns and core-walls.
Proper offset marking is crucial for the structural integr...
Level shifting is the process of converting a signal from one voltage level to another.
Level shifting can be done using voltage dividers, operational amplifiers, or digital logic circuits.
Voltage dividers are used to reduce the voltage level of a signal.
Operational amplifiers can be used to amplify or attenuate a signal to the desired level.
Digital logic circuits can be used to convert a signal from one logic level to ...
Control points are shifted vertically using plumb bobs and laser levels.
Control points are established on the ground floor using surveying instruments.
Plumb bobs and laser levels are used to transfer the control points vertically to the next floor.
The control points are re-established on the next floor using the transferred points as reference.
This process is repeated for each floor of the building.
The accuracy of the ...
Yes, Resection is a surveying technique used to determine the location of an unknown point by sighting in on known points.
Resection involves using at least two known points and measuring the angles between them and the unknown point.
The intersection of these angles gives the location of the unknown point.
Resection is commonly used in land surveying and mapping.
It can also be used in navigation and military applications
Yes, travees are used in surveying to mark points on the ground.
Travees are wooden or metal stakes used to mark points on the ground during surveying.
They are often used to mark the corners of a property or the location of a proposed structure.
Travees can also be used to mark the location of underground utilities or other features.
Surveyors use a variety of tools and techniques to accurately measure and mark points on ...
Yes, I am proficient in AutoCAD.
I have experience using AutoCAD for creating and editing engineering drawings.
I am familiar with various AutoCAD commands and tools.
I have used AutoCAD to create 2D and 3D models for surveying projects.
I am able to import and export data from AutoCAD to other software programs.
I am comfortable working with different file formats in AutoCAD.
Eversendai interview questions for popular designations
posted on 26 Oct 2023
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
Get interview-ready with Top Eversendai Interview Questions
I applied via Job Portal and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.
The work area in one bag gypsum involves applying and finishing gypsum-based materials for walls and ceilings.
Applying gypsum-based materials to walls and ceilings
Finishing the applied materials to achieve a smooth and even surface
Repairing any imperfections or cracks in the gypsum
Sanding and smoothing the surface for a polished look
Ensuring proper adhesion and durability of the gypsum materials
Post pour and pre pour are two stages in the concrete pouring process.
Pre pour refers to the activities and preparations done before pouring the concrete.
Post pour refers to the activities and inspections done after the concrete has been poured.
Pre pour activities include formwork installation, reinforcement placement, and concrete mix preparation.
Post pour activities include curing, finishing, and quality control insp...
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
Yes, other formwork materials such as aluminum, steel, and plastic are also handled.
Aluminum formwork
Steel formwork
Plastic formwork
Top trending discussions
based on 19 interviews
Interview experience
based on 332 reviews
Rating in categories
Assistant Engineer
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
55
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
38
salaries
| ₹0 L/yr - ₹0 L/yr |
HSE Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Group
BHEL
Reliance Industries