Finishing Engineer

10+ Finishing Engineer Interview Questions and Answers

Updated 26 Dec 2024
search-icon

Q1. You have one flat than how to start finish work with sequence.

Ans.

Start by inspecting the flat and identifying any imperfections. Then proceed with sanding, priming, and painting in a logical sequence.

  • Inspect the flat for imperfections such as cracks, holes, or uneven surfaces

  • Fill any imperfections with spackle or putty and allow to dry

  • Sand the entire surface with a fine-grit sandpaper to create a smooth finish

  • Apply a coat of primer to the surface and allow to dry

  • Sand the surface again with a fine-grit sandpaper

  • Apply the first coat of paint...read more

Q2. Is ther is any safety precautions you take on site while any finishing activities pn going

Ans.

Yes, safety precautions are taken on site during finishing activities.

  • Wearing appropriate personal protective equipment (PPE) such as gloves, safety glasses, and masks

  • Ensuring proper ventilation to minimize exposure to fumes and dust

  • Implementing proper housekeeping practices to keep the work area clean and organized

  • Using safety barriers or signage to prevent unauthorized access to the work area

  • Regularly inspecting and maintaining equipment to ensure safe operation

  • Providing tr...read more

Finishing Engineer Interview Questions and Answers for Freshers

illustration image

Q3. What is the difference between post pour & pre pour

Ans.

Post pour and pre pour are two stages in the concrete pouring process.

  • Pre pour refers to the activities and preparations done before pouring the concrete.

  • Post pour refers to the activities and inspections done after the concrete has been poured.

  • Pre pour activities include formwork installation, reinforcement placement, and concrete mix preparation.

  • Post pour activities include curing, finishing, and quality control inspections.

  • Pre pour inspections ensure that the site is ready...read more

Q4. 1 )What is floor tile thickness 2) what is tha process of flooring 3) types of tile

Ans.

Floor tile thickness varies depending on the type of tile and its intended use.

  • Floor tile thickness can range from 1/4 inch to 3/4 inch.

  • Thicker tiles are typically used for heavy-duty applications like commercial spaces.

  • Thinner tiles are commonly used for residential purposes.

  • Some examples of floor tile thickness include 1/4 inch, 3/8 inch, 1/2 inch, and 3/4 inch.

Are these interview questions helpful?

Q5. What is the work area doing in one bag gypsum

Ans.

The work area in one bag gypsum involves applying and finishing gypsum-based materials for walls and ceilings.

  • Applying gypsum-based materials to walls and ceilings

  • Finishing the applied materials to achieve a smooth and even surface

  • Repairing any imperfections or cracks in the gypsum

  • Sanding and smoothing the surface for a polished look

  • Ensuring proper adhesion and durability of the gypsum materials

Q6. How to start block or brick work

Ans.

Starting block or brick work requires proper planning and preparation.

  • Ensure the foundation is strong and level

  • Determine the layout and dimensions of the wall

  • Mix mortar according to instructions and apply to the foundation

  • Lay the first course of blocks or bricks, ensuring they are level and plumb

  • Continue laying courses, alternating the placement of blocks or bricks for stability

  • Use a level and string line to ensure the wall is straight and even

  • Cut blocks or bricks as needed t...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. How to match pattern on Italian marble

Ans.

Matching patterns on Italian marble requires careful observation and attention to detail.

  • Start by examining the natural patterns and veining in the marble

  • Identify the dominant colors and shapes in the pattern

  • Use a template or stencil to mark the desired pattern on the marble surface

  • Carefully cut and shape the marble to match the pattern

  • Polish and finish the marble to enhance the pattern and create a seamless look

Q8. Methodology of doing internal Finishing work

Ans.

The methodology of doing internal Finishing work involves careful planning, preparation, and execution.

  • Start by assessing the scope of work and creating a detailed plan.

  • Prepare the necessary materials, tools, and equipment.

  • Ensure proper surface preparation, including cleaning, sanding, and priming.

  • Follow specific techniques for each type of finishing work, such as painting, wallpapering, or installing fixtures.

  • Pay attention to detail and ensure quality workmanship.

  • Regularly i...read more

Finishing Engineer Jobs

Finishing Engineer 2-7 years
Lodha Group
4.0
₹ 3 L/yr - ₹ 7 L/yr
Mumbai
Finishing Engineer 4-9 years
Century Real Estate
4.1
Bangalore / Bengaluru
Finishing Engineer 2-5 years
Rajhans Desai Jain Group
4.5
₹ 3 L/yr - ₹ 7 L/yr
Surat

Q9. What is Havc full form,

Ans.

HAVC stands for Heating, Ventilation, and Air Conditioning.

  • HAVC is a system used to regulate temperature, humidity, and air quality in buildings.

  • It includes components such as furnaces, air conditioners, ductwork, and filters.

  • HAVC systems are commonly used in residential, commercial, and industrial buildings.

  • Proper maintenance of HAVC systems is important for energy efficiency and indoor air quality.

Q10. Will u open for pan india

Ans.

Yes, I am open to working pan India.

  • I am willing to relocate and work in different cities across India.

  • I am adaptable and can adjust to different work environments and cultures.

  • I have experience working in multiple locations and have successfully completed projects in different parts of the country.

  • I understand the importance of being flexible and open to new opportunities.

  • I am excited about the prospect of working pan India and contributing to projects across the country.

Q11. Finishing Sequence for the flats ?

Ans.

The finishing sequence for flats typically involves cleaning, sanding, priming, painting, and sealing.

  • Start by cleaning the surface to remove any dirt or debris

  • Sand the surface to create a smooth and even texture

  • Apply a primer to improve adhesion and coverage of the paint

  • Paint the surface with the desired color and finish

  • Finish by sealing the surface to protect the paint and provide durability

  • Example: Cleaning -> Sanding -> Priming -> Painting -> Sealing

Q12. What ia the ceiling used in toilet

Ans.

Ceilings in toilets are typically made of moisture-resistant materials like PVC, gypsum board, or metal.

  • Common materials used for toilet ceilings include PVC, gypsum board, and metal

  • Moisture-resistant properties are important to prevent damage from humidity and water exposure

  • Ceilings may also have ventilation systems to help reduce moisture buildup

  • Ceilings in commercial toilets may be made of more durable materials like stainless steel

Q13. What is gypsum boxing celing

Ans.

Gypsum boxing ceiling is a method of creating a smooth and even surface on a ceiling using gypsum boards.

  • Gypsum boxing ceiling involves covering the ceiling with gypsum boards to hide imperfections and create a seamless finish.

  • It is commonly used in commercial and residential buildings to achieve a modern and clean look.

  • The process includes measuring, cutting, and installing the gypsum boards to create a uniform surface.

  • After installation, the joints are filled and sanded to ...read more

Q14. What is paint and process

Ans.

Paint is a liquid material applied to a surface to protect, color, or decorate it. Process refers to the steps involved in applying paint to achieve desired results.

  • Paint is a mixture of pigments, binders, solvents, and additives.

  • Process includes surface preparation, priming, painting, and finishing.

  • Examples of paint processes include spray painting, brush painting, and powder coating.

Q15. Methology of work

Ans.

My methodology of work involves thorough planning, attention to detail, effective communication, and continuous improvement.

  • I always start by creating a detailed plan outlining the steps needed to complete a project.

  • I pay close attention to detail to ensure high quality work and prevent errors.

  • I communicate regularly with team members and stakeholders to keep everyone informed and address any issues that may arise.

  • I believe in continuous improvement and regularly evaluate my ...read more

Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.9
 • 560 Interviews
3.9
 • 74 Interviews
3.8
 • 28 Interviews
3.5
 • 4 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Finishing Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter