Upload Button Icon Add office photos

Eversendai

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Eversendai Assistant Survey Engineer Interview Questions, Process, and Tips

Updated 24 Sep 2021

Eversendai Assistant Survey Engineer Interview Experiences

1 interview found

Interview Questionnaire 

7 Questions

  • Q1. Where is your control points & TBM.
  • Ans. 

    Control points & TBM are located at specific coordinates on the site.

    • Control points are established to provide a reference for surveying measurements.

    • TBM (Temporary Bench Mark) is a point of known elevation used as a reference for leveling.

    • The location of control points and TBM are determined based on the project requirements and site conditions.

    • They are typically marked with a stake or monument and recorded in a surve

  • Answered by AI
  • Q2. Do you know columns & core-wall offset marking?
  • Ans. 

    Yes, I am familiar with columns and core-wall offset marking.

    • Columns and core-walls are marked with a specific offset to ensure proper alignment and placement.

    • This marking is usually done using a chalk line or laser level.

    • The offset distance is determined by the project specifications and can vary depending on the size and location of the columns and core-walls.

    • Proper offset marking is crucial for the structural integr...

  • Answered by AI
  • Q3. How do you Level shifting
  • Ans. 

    Level shifting is the process of converting a signal from one voltage level to another.

    • Level shifting can be done using voltage dividers, operational amplifiers, or digital logic circuits.

    • Voltage dividers are used to reduce the voltage level of a signal.

    • Operational amplifiers can be used to amplify or attenuate a signal to the desired level.

    • Digital logic circuits can be used to convert a signal from one logic level to ...

  • Answered by AI
  • Q4. How do your control points shift, one floor to the next floor?
  • Ans. 

    Control points are shifted vertically using plumb bobs and laser levels.

    • Control points are established on the ground floor using surveying instruments.

    • Plumb bobs and laser levels are used to transfer the control points vertically to the next floor.

    • The control points are re-established on the next floor using the transferred points as reference.

    • This process is repeated for each floor of the building.

    • The accuracy of the ...

  • Answered by AI
  • Q5. Do you know Resection?
  • Ans. 

    Yes, Resection is a surveying technique used to determine the location of an unknown point by sighting in on known points.

    • Resection involves using at least two known points and measuring the angles between them and the unknown point.

    • The intersection of these angles gives the location of the unknown point.

    • Resection is commonly used in land surveying and mapping.

    • It can also be used in navigation and military applications

  • Answered by AI
  • Q6. Do you know travees?
  • Ans. 

    Yes, travees are used in surveying to mark points on the ground.

    • Travees are wooden or metal stakes used to mark points on the ground during surveying.

    • They are often used to mark the corners of a property or the location of a proposed structure.

    • Travees can also be used to mark the location of underground utilities or other features.

    • Surveyors use a variety of tools and techniques to accurately measure and mark points on ...

  • Answered by AI
  • Q7. Do you know AutoCAD?
  • Ans. 

    Yes, I am proficient in AutoCAD.

    • I have experience using AutoCAD for creating and editing engineering drawings.

    • I am familiar with various AutoCAD commands and tools.

    • I have used AutoCAD to create 2D and 3D models for surveying projects.

    • I am able to import and export data from AutoCAD to other software programs.

    • I am comfortable working with different file formats in AutoCAD.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am at first, control points & Level TBM already submitted client, then check and layout of our construction field.

Interview questions from similar companies

I was interviewed in Aug 2020.

Interview Questionnaire 

1 Question

  • Q1. Technically, troubleshooting

Interview Preparation Tips

Interview preparation tips for other job seekers - Be practical and tech knowledge love your work

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

Interview Questionnaire 

1 Question

  • Q1. Technical questions related to inventory,scm and stock management

Interview Preparation Tips

Round: Resume Shortlist
Experience: Experience and key skills

I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

General information about electronic products which is used in daily life and technical questions related about the electronic equipments.

Round 3 - HR 

(1 Question)

  • Q1. Information about yourself and Negotiation about LPA

Interview Preparation Tips

Interview preparation tips for other job seekers - Just go for it nothing is impossible to get.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.
Contribute & help others!
anonymous
You can choose to be anonymous

Eversendai Interview FAQs

What are the top questions asked in Eversendai Assistant Survey Engineer interview?

Some of the top questions asked at the Eversendai Assistant Survey Engineer interview -

  1. How do your control points shift, one floor to the next flo...read more
  2. do you know columns & core-wall offset marki...read more
  3. Where is your control points & T...read more

Recently Viewed

INTERVIEWS

Publicis

No Interviews

CAMPUS PLACEMENT

Anna University

INTERVIEWS

DRC Systems

No Interviews

INTERVIEWS

Credgenics

No Interviews

INTERVIEWS

Eversendai

No Interviews

INTERVIEWS

Eversendai

No Interviews

INTERVIEWS

Publicis

No Interviews

INTERVIEWS

ClearTax

No Interviews

INTERVIEWS

ClearTax

No Interviews

INTERVIEWS

Publicis

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 358 Interviews
Saint-Gobain Interview Questions
4.0
 • 172 Interviews
AECOM Interview Questions
4.2
 • 115 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
Worley Interview Questions
4.1
 • 111 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
View all
Assistant Engineer
61 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
55 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
45 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
38 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

HSE Engineer
29 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Eversendai with

Larsen & Toubro Limited

4.0
Compare

Tata Group

4.2
Compare

BHEL

4.1
Compare

Reliance Industries

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview