I appeared for an interview in Aug 2024.
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
The Soil Bearing Capacity of Adyar varies depending on the specific location and soil composition.
Soil bearing capacity is typically measured in terms of pressure per unit area that the soil can support without failure.
Factors affecting soil bearing capacity include soil type, moisture content, compaction, and depth.
For Adyar, the soil bearing capacity can range from 1000 to 5000 kN/m^2 depending on the specific locati
I applied via Naukri.com and was interviewed in Aug 2022. There were 3 interview rounds.
Eversendai interview questions for popular designations
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
Get interview-ready with Top Eversendai Interview Questions
I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.
I applied via Job Portal and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.
The work area in one bag gypsum involves applying and finishing gypsum-based materials for walls and ceilings.
Applying gypsum-based materials to walls and ceilings
Finishing the applied materials to achieve a smooth and even surface
Repairing any imperfections or cracks in the gypsum
Sanding and smoothing the surface for a polished look
Ensuring proper adhesion and durability of the gypsum materials
Post pour and pre pour are two stages in the concrete pouring process.
Pre pour refers to the activities and preparations done before pouring the concrete.
Post pour refers to the activities and inspections done after the concrete has been poured.
Pre pour activities include formwork installation, reinforcement placement, and concrete mix preparation.
Post pour activities include curing, finishing, and quality control insp...
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
Top trending discussions
based on 3 interviews
Interview experience
based on 338 reviews
Rating in categories
Assistant Engineer
58
salaries
| ₹2.3 L/yr - ₹4.6 L/yr |
Senior Engineer
57
salaries
| ₹5 L/yr - ₹9.5 L/yr |
Assistant Manager
42
salaries
| ₹6.1 L/yr - ₹16 L/yr |
Engineer
38
salaries
| ₹3 L/yr - ₹8 L/yr |
HSE Engineer
30
salaries
| ₹2.4 L/yr - ₹8 L/yr |
Alstom Transportation
Saint-Gobain
AECOM
AtkinsRealis