Filter interviews by
I applied via Walk-in and was interviewed before Jan 2022. There was 1 interview round.
The quantity of dust, cement, and water can be determined based on the mix design of the concrete.
The mix design of the concrete specifies the proportions of each ingredient.
The quantity of dust, cement, and water can be calculated based on the volume of concrete required.
The water-cement ratio is an important factor in determining the strength and durability of the concrete.
The quantity of dust can be estimated based ...
The number of bricks in 1 m3 depends on the size of the brick.
The standard size of a brick is 190mm x 90mm x 90mm
To find the number of bricks in 1 m3, we need to calculate the volume of one brick and then divide 1 m3 by that volume
The volume of one brick is 0.19m x 0.09m x 0.09m = 0.001539m3
So, the number of bricks in 1 m3 is 1/0.001539 = 650 bricks approximately
Top trending discussions
I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.
Technical questions about civil engineering works
The question is unrelated and consists of three different topics: frog, area of triangle, and types of tiles.
Frog is an amphibian with smooth, moist skin and long hind legs adapted for leaping.
The area of a triangle is calculated by multiplying the base by the height and dividing by 2.
There are various types of tiles such as ceramic, porcelain, mosaic, glass, etc.
I have experience in the field of civil engineering and currently working for a company.
I have a Bachelor's degree in Civil Engineering.
I have worked on various construction projects, including residential and commercial buildings.
I am proficient in using software such as AutoCAD and Revit for designing and drafting.
I have experience in conducting site inspections and ensuring compliance with building codes and regulat...
I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.
Civil Site Engineer
5
salaries
| ₹2 L/yr - ₹2.5 L/yr |
Billing Engineer
4
salaries
| ₹4.6 L/yr - ₹6.4 L/yr |
Amazon Sellers Services
Exl India
Flipkart Wholesale
Busibud