i
Patil Group
Filter interviews by
I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.
Technical questions about civil engineering works
The question is unrelated and consists of three different topics: frog, area of triangle, and types of tiles.
Frog is an amphibian with smooth, moist skin and long hind legs adapted for leaping.
The area of a triangle is calculated by multiplying the base by the height and dividing by 2.
There are various types of tiles such as ceramic, porcelain, mosaic, glass, etc.
I have experience in the field of civil engineering and currently working for a company.
I have a Bachelor's degree in Civil Engineering.
I have worked on various construction projects, including residential and commercial buildings.
I am proficient in using software such as AutoCAD and Revit for designing and drafting.
I have experience in conducting site inspections and ensuring compliance with building codes and regulat...
Top trending discussions
I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.
posted on 7 May 2023
Grade of concrete refers to the strength of concrete determined by its compressive strength at 28 days.
Grade of concrete is denoted by the ratio of cement, sand, and aggregate used in the mix.
The most commonly used grades of concrete are M20, M25, M30, and M35.
Higher grade of concrete indicates higher strength and durability.
Grade of concrete is determined by conducting compressive strength tests on concrete cubes or c
As a Jr. Engineer Civil, my responsibility is to assist senior engineers in designing, planning, and executing construction projects.
Assist senior engineers in designing and planning construction projects
Execute construction projects as per the plan
Ensure compliance with safety regulations and building codes
Maintain project documentation and communicate progress to stakeholders
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 19 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.
Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.
Data structures are used to manage large amounts of data efficiently.
They provide a way to organize data in a way that makes it easy to access and manipulate.
Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.
Explain logic of stack
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
posted on 15 Jul 2024
Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.
Understanding the overall goals and objectives of the organization
Developing detailed action plans to achieve those goals
Assigning tasks and responsibilities to team members
Monitoring progress and making adjustments as needed
Ensuring that resources are allocated efficiently
Communicating effectively w...
posted on 25 Feb 2022
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
A prolongation claim can be prepared by identifying the additional costs incurred due to delays and providing evidence to support the claim.
Identify the cause of delay and the impact it had on the project timeline and budget
Document all additional costs incurred due to the delay, including labor, materials, and equipment
Provide evidence to support the claim, such as daily reports, change orders, and correspondence with...
Delay analysis involves identifying the causes of delay and determining their impact on the project timeline.
Identify the critical path of the project
Determine the planned vs actual timeline for each activity
Identify any changes or disruptions that occurred during the project
Quantify the impact of each delay on the project timeline
Use a recognized methodology such as the As-Planned vs As-Built or Time Impact Analysis
Co...
posted on 28 Dec 2020
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Quality Engineer
31
salaries
| ₹1.9 L/yr - ₹4.8 L/yr |
Senior Engineer
26
salaries
| ₹2.9 L/yr - ₹6.3 L/yr |
Assistant Manager
24
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Civil Site Engineer
23
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Accountant
22
salaries
| ₹1.4 L/yr - ₹4.3 L/yr |
GAMMON INDIA
Millennium Engineers & Contractors
Karam Industries
Ray Engineering