i
Patil Group
Filter interviews by
I applied via Approached by Company and was interviewed in Apr 2023. There were 4 interview rounds.
Wire drawing process parameters involve factors like die angle, reduction ratio, lubrication, and speed.
Die angle affects the shape and size of the wire being drawn.
Reduction ratio determines the amount of diameter reduction in each pass.
Lubrication is crucial for reducing friction and heat during the process.
Speed influences the overall efficiency and quality of the drawn wire.
By implementing cost control measures, monitoring expenses, negotiating with suppliers, and optimizing production processes.
Implementing cost control measures such as setting budgets and tracking expenses
Monitoring expenses regularly to identify areas of overspending
Negotiating with suppliers to get the best prices for materials and services
Optimizing production processes to reduce waste and improve efficiency
Top trending discussions
posted on 15 Jul 2024
Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.
Understanding the overall goals and objectives of the organization
Developing detailed action plans to achieve those goals
Assigning tasks and responsibilities to team members
Monitoring progress and making adjustments as needed
Ensuring that resources are allocated efficiently
Communicating effectively w...
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
posted on 19 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.
Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.
Data structures are used to manage large amounts of data efficiently.
They provide a way to organize data in a way that makes it easy to access and manipulate.
Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.
Explain logic of stack
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
I applied via Referral and was interviewed in May 2022. There were 3 interview rounds.
posted on 9 Aug 2024
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
The number of cycling days scheduled for slab casting varies depending on the project timeline and size of the slabs.
Cycling days for slab casting can range from 1 to 5 days per slab, depending on the size and complexity of the slab.
Factors such as weather conditions, equipment availability, and workforce efficiency can also impact the number of cycling days.
For example, a smaller slab may only require 1-2 cycling days...
posted on 30 Aug 2021
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Quality Engineer
31
salaries
| ₹1.9 L/yr - ₹4.5 L/yr |
Senior Engineer
26
salaries
| ₹2.9 L/yr - ₹6.3 L/yr |
Assistant Manager
24
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Civil Site Engineer
23
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Accountant
22
salaries
| ₹1.4 L/yr - ₹4.3 L/yr |
GAMMON INDIA
Millennium Engineers & Contractors
Karam Industries
S V S Projects India