Filter interviews by
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
The number of cycling days scheduled for slab casting varies depending on the project timeline and size of the slabs.
Cycling days for slab casting can range from 1 to 5 days per slab, depending on the size and complexity of the slab.
Factors such as weather conditions, equipment availability, and workforce efficiency can also impact the number of cycling days.
For example, a smaller slab may only require 1-2 cycling days...
I applied via LinkedIn and was interviewed before Nov 2021. There were 2 interview rounds.
posted on 6 Dec 2023
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 3 interview rounds.
I have held various project management roles in the past, overseeing the successful completion of multiple projects.
Managed cross-functional teams to deliver projects on time and within budget
Developed project plans, schedules, and budgets
Identified and mitigated project risks
Communicated project status updates to stakeholders
Ensured project deliverables met quality standards
The installation of interior fitout in a specific space involves the process of transforming an empty area into a functional and aesthetically pleasing environment.
Understanding the client's requirements and design specifications
Creating a detailed project plan and timeline
Coordinating with architects, designers, contractors, and suppliers
Managing the procurement and delivery of materials and equipment
Supervising the i...
posted on 25 Jun 2022
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
Software skills refer to the ability to use various software tools and applications effectively.
Proficiency in programming languages such as Java, Python, C++
Familiarity with software development methodologies such as Agile, Waterfall
Experience with software testing and debugging
Knowledge of database management systems like MySQL, Oracle
Ability to use software tools like Git, JIRA, Visual Studio
Understanding of web dev
posted on 1 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There were 3 interview rounds.
They have a test paper that you have to fill before meeting MD in final round
posted on 19 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.
Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.
Data structures are used to manage large amounts of data efficiently.
They provide a way to organize data in a way that makes it easy to access and manipulate.
Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.
Explain logic of stack
I applied via Indeed and was interviewed in Nov 2022. There were 3 interview rounds.
Solar energy is generated through the conversion of sunlight into electricity using solar panels.
Solar panels absorb sunlight and convert it into direct current (DC) electricity.
An inverter is used to convert DC electricity into alternating current (AC) electricity.
The AC electricity is then used to power homes, businesses, and other buildings.
Excess energy can be stored in batteries or fed back into the grid for other...
A diesel engine uses compression ignition to ignite fuel, resulting in high efficiency and torque.
Diesel engines compress air to a high pressure, which raises the temperature of the air.
Fuel is then injected into the hot, pressurized air, causing it to ignite and expand rapidly.
Diesel engines are known for their high torque output, making them popular in heavy-duty applications like trucks and construction equipment.
Mo...
posted on 7 Nov 2019
The finishing process involves tiling, wall gypsum, plaster, and waterproofing with specific material proportions and properties.
The first step is to prepare the surface by cleaning and leveling it.
Waterproofing is done to prevent water damage to the walls and floors.
Gypsum plaster is used to create a smooth surface for painting or wallpapering.
Tiling involves laying tiles on the floor or walls using adhesive and grout...
posted on 17 Dec 2020
I applied via Referral and was interviewed in Jun 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Civil Site Engineer
33
salaries
| ₹1.3 L/yr - ₹4.9 L/yr |
Senior Engineer
29
salaries
| ₹4 L/yr - ₹8.2 L/yr |
Site Engineer
29
salaries
| ₹2.1 L/yr - ₹4.2 L/yr |
Junior Engineer
17
salaries
| ₹2 L/yr - ₹3.7 L/yr |
Junior Engineer Civil
16
salaries
| ₹1 L/yr - ₹3.6 L/yr |
Millennium Engineers & Contractors
Karam Industries
MaRS Planning & Engineering Services
Jse Engineering