Software skills refer to the ability to use various software tools and applications effectively.
Proficiency in programming languages such as Java, Python, C++
Familiarity with software development methodologies such as Agile, Waterfall
Experience with software testing and debugging
Knowledge of database management systems like MySQL, Oracle
Ability to use software tools like Git, JIRA, Visual Studio
Understanding of web dev
I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.
posted on 24 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
posted on 23 Oct 2023
I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 6 Dec 2023
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 3 interview rounds.
The installation of interior fitout in a specific space involves the process of transforming an empty area into a functional and aesthetically pleasing environment.
Understanding the client's requirements and design specifications
Creating a detailed project plan and timeline
Coordinating with architects, designers, contractors, and suppliers
Managing the procurement and delivery of materials and equipment
Supervising the i...
posted on 11 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
The interview question is about 1.33kv&11kv BOQ, power transformer description, and the role of CT/PT.
BOQ for 1.33kv and 11kv involves preparing a bill of quantities for electrical equipment and materials required for the project.
Power transformer description includes its specifications, such as voltage rating, power rating, winding configuration, cooling system, etc.
CT/PT (Current Transformer/Potential Transformer) ar...
Answering questions related to electrical engineering
To find if a transformer is star or delta connected, check the connection of the primary and secondary windings
APL/BPL/AGL materials refer to Above Poverty Line/Below Poverty Line/Anti-Graffiti materials used in construction
ROW stands for Right of Way, which is the legal right to pass through a property or land
posted on 9 Aug 2024
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
The number of cycling days scheduled for slab casting varies depending on the project timeline and size of the slabs.
Cycling days for slab casting can range from 1 to 5 days per slab, depending on the size and complexity of the slab.
Factors such as weather conditions, equipment availability, and workforce efficiency can also impact the number of cycling days.
For example, a smaller slab may only require 1-2 cycling days...
posted on 21 Jan 2024
I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.
based on 3 reviews
Rating in categories
Project Engineer
15
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Project Manager
6
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Data Analyst
6
salaries
| ₹3 L/yr - ₹9 L/yr |
Sustainability Consultant
6
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Engineering Manager
5
salaries
| ₹3 L/yr - ₹5.6 L/yr |
Adani Green Energy
Tata Power Renewable Energy
Suzlon Group
ReNew