Upload Button Icon Add office photos

Filter interviews by

Growever Infra Corp Interview Questions and Answers

Updated 28 Jan 2023

Growever Infra Corp Interview Experiences

2 interviews found

Interview Questions & Answers

user image

posted on 28 Jan 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General round about background, working experience etc
Round 3 - Technical 

(1 Question)

  • Q1. General questions about the particular role
Round 4 - Technical 

(1 Question)

  • Q1. Related to billing and Estimation

Interview Preparation Tips

Interview preparation tips for other job seekers - Not too much deep questioning here. You only need to prepare yourself about final results related to the particular role

I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. All technical questions like shuttering, bbs, quantity etc
  • Q2. Have to impress the company that u should be the right candidate that they are searching for.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always keep positive but dont oversmart

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)

Jobs at Growever Infra Corp

View all

Interview questions from similar companies

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basic about RCC Surveying

Interview Preparation Tips

Topics to prepare for GAMMON INDIA Junior Engineer Civil interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Keep up to date for your resume and basic interview questions

I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Fidic Red Book, Silver Book,
  • Q2. How to prepare Prolongation Claim
  • Ans. 

    A prolongation claim can be prepared by identifying the additional costs incurred due to delays and providing evidence to support the claim.

    • Identify the cause of delay and the impact it had on the project timeline and budget

    • Document all additional costs incurred due to the delay, including labor, materials, and equipment

    • Provide evidence to support the claim, such as daily reports, change orders, and correspondence with...

  • Answered by AI
  • Q3. How to do delay analysis
  • Ans. 

    Delay analysis involves identifying the causes of delay and determining their impact on the project timeline.

    • Identify the critical path of the project

    • Determine the planned vs actual timeline for each activity

    • Identify any changes or disruptions that occurred during the project

    • Quantify the impact of each delay on the project timeline

    • Use a recognized methodology such as the As-Planned vs As-Built or Time Impact Analysis

    • Co...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Great Learning but salary delays

Interview Questionnaire 

1 Question

  • Q1. About GSB grades,SDBC

I applied via Other and was interviewed in Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Servicing about New generation hydra

Interview Preparation Tips

Interview preparation tips for other job seekers - I like to take challenge for developing ourself

I applied via Monster and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Basic about accounting norms
  • Q2. Golden rule

Interview Preparation Tips

Interview preparation tips for other job seekers - read basic accounting

Growever Infra Corp Interview FAQs

How many rounds are there in Growever Infra Corp interview?
Growever Infra Corp interview process usually has 4 rounds. The most common rounds in the Growever Infra Corp interview process are Technical, Resume Shortlist and HR.
How to prepare for Growever Infra Corp interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Growever Infra Corp. The most common topics and skills that interviewers at Growever Infra Corp expect are Civil Engineering, Design, Urban Planning, Water Supply and Architecture.
What are the top questions asked in Growever Infra Corp interview?

Some of the top questions asked at the Growever Infra Corp interview -

  1. All technical questions like shuttering, bbs, quantity ...read more
  2. Related to billing and Estimat...read more

Tell us how to improve this page.

Growever Infra Corp Interview Process

based on 4 interviews

Interview experience

3.3
  
Average
View more

Growever Infra Corp Reviews and Ratings

based on 41 reviews

4.0/5

Rating in categories

3.8

Skill development

4.0

Work-life balance

3.5

Salary

3.6

Job security

3.9

Company culture

3.6

Promotions

3.7

Work satisfaction

Explore 41 Reviews and Ratings
Project Manager Civil

Sambalpur

15-20 Yrs

₹ 15-20 LPA

Senior Engineer- Irrigation

New Delhi

5-9 Yrs

₹ 6-8.5 LPA

Explore more jobs
Project Manager
7 salaries
unlock blur

₹8 L/yr - ₹10.2 L/yr

Civil Engineer
7 salaries
unlock blur

₹3.4 L/yr - ₹5.4 L/yr

Senior Engineer
6 salaries
unlock blur

₹4.2 L/yr - ₹9 L/yr

Land Surveyor
6 salaries
unlock blur

₹3.1 L/yr - ₹6.6 L/yr

Civil Site Engineer
5 salaries
unlock blur

₹0.8 L/yr - ₹5 L/yr

Explore more salaries
Compare Growever Infra Corp with

GAMMON INDIA

3.8
Compare

Karam Industries

4.0
Compare

Ray Engineering

4.1
Compare

MaRS Planning & Engineering Services

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview