A prolongation claim can be prepared by identifying the additional costs incurred due to delays and providing evidence to support the claim.
Identify the cause of delay and the impact it had on the project timeline and budget
Document all additional costs incurred due to the delay, including labor, materials, and equipment
Provide evidence to support the claim, such as daily reports, change orders, and correspondence with...
Delay analysis involves identifying the causes of delay and determining their impact on the project timeline.
Identify the critical path of the project
Determine the planned vs actual timeline for each activity
Identify any changes or disruptions that occurred during the project
Quantify the impact of each delay on the project timeline
Use a recognized methodology such as the As-Planned vs As-Built or Time Impact Analysis
Co...
Top trending discussions
I applied via Indeed and was interviewed in Apr 2024. There was 1 interview round.
Truss members in tension have forces pulling them apart, while members in compression have forces pushing them together.
Tension members have forces acting away from the joint they are connected to.
Compression members have forces acting towards the joint they are connected to.
Identify tension or compression based on the direction of the force on the member.
Consider the overall equilibrium of forces in the truss to deter...
I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
posted on 21 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 4 interview rounds.
I applied via Company Website and was interviewed before Jul 2021. There was 1 interview round.
posted on 22 Feb 2023
HR life cycle refers to the stages of an employee's journey within an organization, from recruitment to exit.
The HR life cycle includes stages such as recruitment, onboarding, performance management, career development, and exit
Recruitment involves sourcing, screening, and selecting candidates for open positions
Onboarding includes orientation, training, and integration into the company culture
Performance management inv...
I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
I am from a small town in the Midwest and I am passionate about environmental conservation.
I grew up in a close-knit community in the Midwest
I have always been interested in protecting the environment
I enjoy outdoor activities like hiking and gardening
I have a Bachelor's degree in Computer Science from XYZ University.
Bachelor's degree in Computer Science
Graduated from XYZ University
Specialized in software development
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
posted on 23 Apr 2022
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
based on 1 review
Rating in categories
Civil Engineer
41
salaries
| ₹2 L/yr - ₹6 L/yr |
Assistant Manager
38
salaries
| ₹4.5 L/yr - ₹9.7 L/yr |
Deputy Manager
25
salaries
| ₹7 L/yr - ₹15.5 L/yr |
Civil Site Engineer
20
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Plant Engineer
19
salaries
| ₹2.8 L/yr - ₹5 L/yr |
McNally Bharat Engineering
Gammon Engineers And Contractors
Military Engineer Services
The Louis Berger Group