Filter interviews by
I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.
I passed HSLC in 2015.
I passed HSLC in 2015.
I completed my HSLC in 2015.
I cleared the HSLC examination in 2015.
I applied via Company Website and was interviewed before Jul 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To conduct a slump test, fill a metal cone with concrete, compact it, remove the cone, and measure the slump.
Clean the cone and moisten it with water.
Fill the cone with concrete in three layers, compacting each layer with a rod.
Remove the cone and place it next to the slump.
Measure the difference in height between the top of the cone and the highest point of the slump.
Repeat the test at least twice and take the average
Minimum cement content for M25 Grade is 300 kg/m³.
M25 grade concrete has a minimum compressive strength of 25 MPa.
The water-cement ratio should not exceed 0.50.
The cement content can vary based on factors such as aggregate size, shape, and grading.
The cement content should be adjusted based on the results of trial mixes.
I expect a competitive salary based on industry standards and my experience.
I have researched the industry standards for QA QC Engineer salaries
I have taken into account my experience and skills
I am open to negotiation based on the specific job responsibilities and benefits package
I am looking for a fair and competitive salary that reflects my value to the company
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.
I applied via Indeed and was interviewed in Apr 2024. There was 1 interview round.
Truss members in tension have forces pulling them apart, while members in compression have forces pushing them together.
Tension members have forces acting away from the joint they are connected to.
Compression members have forces acting towards the joint they are connected to.
Identify tension or compression based on the direction of the force on the member.
Consider the overall equilibrium of forces in the truss to deter...
posted on 22 Feb 2023
HR life cycle refers to the stages of an employee's journey within an organization, from recruitment to exit.
The HR life cycle includes stages such as recruitment, onboarding, performance management, career development, and exit
Recruitment involves sourcing, screening, and selecting candidates for open positions
Onboarding includes orientation, training, and integration into the company culture
Performance management inv...
based on 6 reviews
Rating in categories
Civil Engineer
41
salaries
| ₹2 L/yr - ₹6 L/yr |
Assistant Manager
38
salaries
| ₹4.5 L/yr - ₹9.7 L/yr |
Deputy Manager
25
salaries
| ₹7 L/yr - ₹15.5 L/yr |
Civil Site Engineer
20
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Plant Engineer
19
salaries
| ₹2.8 L/yr - ₹5 L/yr |
McNally Bharat Engineering
Gammon Engineers And Contractors
Military Engineer Services
The Louis Berger Group